December 1, 2024 |
Sun |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
I, II, IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao, Pantal, Poblacion Oeste, Portion of Lasip Grande, Pogo Chico, Pugaro Suit, Salapingao, Tapuac, Portion of Perez Blvd., and De Venecia Hi-way Extension |
|
Load shifting of DECORP Dagupan Substation from NGCP's Labrador Substation to NGCP's Balingueo Substation and vice-versa through DECORP Balingueo-Calasiao 69kV line |
November 29, 2024 |
Fri |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
I, II, IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao, Pantal, Poblacion Oeste, Portion of Lasip Grande, Pogo Chico, Pugaro Suit, Salapingao, Tapuac, Portion of Perez Blvd., and De Venecia Hi-way Extension |
|
Load shifting of DECORP Dagupan Substation from NGCP's Labrador Substation to NGCP's Balingueo Substation and vice-versa through DECORP Balingueo-Calasiao 69kV line |
November 26, 2024 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Quesban (C32-057W39 to C32-057W47) |
|
Reconductor to facilitate line revamp |
November 26, 2024 |
Tue |
10:00 am – 1:00 pm |
3 hr |
Sta. Barbara: |
Portion of Dalongue (SB-D7MM) |
|
Relocation of secondary pole |
November 25, 2024 |
Mon |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Caranglaan-Tebeng Rd. (D19-B6) |
|
To relocate 1-75kVA distribution transformer from D19-006 to D19-004 with secondary line revamp to improve safe clearance of primary line due to ongoing builging construction at D19-B6 |
November 23, 2024 |
Sat |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-032W3) |
|
To replace of oil leak and uprate the transformer from 1-50kVA to 1-75kVA distribution transformer |
November 23, 2024 |
Sat |
6:00 am – 9:00 am |
3 hr |
Dagupan City: |
Portion of Arellano (D21-057W3) |
|
To reconfigure primary construction from C6-E8 to deviate primary line in the on-going building construction |
November 22, 2024 |
Fri |
1:00 pm – 3:00 pm |
2 hr |
San Jacinto: |
Portion of Macayug (SJ-M15W5) |
|
To reconfigure the primary assembly of the transformer in order to relocate the side guy |
November 22, 2024 |
Fri |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Inmalog Sur (SFB-0389) |
|
Replacement of 2 rotten secondary poles |
November 23, 2024 |
Sat |
9:00 am – 11:00 am |
2 hr |
San Jacinto: |
The entire area of Sta. Cruz |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
November 22, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Casibong (SJ-C16W2) |
|
Revamp of primary and secondary lines, extension of the secondary line, and installation of a 25kVA distribution transformer |
November 21, 2024 |
Thu |
2:00 pm – 5:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-171) |
|
To install 1-75kVA distribution transformer to address the under voltage complaint with secondary load splitting |
November 21, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Pantal (D7-002) |
|
To insatll 1-50kVA distribution to address the overloaded distribution transformer |
November 21, 2024 |
Thu |
10:00 am – 4:00 pm |
6 hr |
Dagupan City: |
Portion of Arellano Bani, Sitio Calima (D22-004) |
|
Reconductoring of secondary lines and replacement of rotten secondary poles |
November 21, 2024 |
Thu |
6:00 am – 12:00 nn |
6 hr |
San Fabian: |
Portion of Nibaliw Navarte (SF-246) |
|
Installation of three 100 kVA distribution transformers to serve the ANJO Farm |
November 21, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Minien West (SB-310MWII) |
|
Line revamp and transfer of secondary line to new pole |
November 21, 2024 |
Thu |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa, Phase II (SB-BD2-13) |
|
Reconductoring of secondary line |
November 20, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa, Phase II (SB-BS2-10) |
|
November 20, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Matic-matic (SB-254) |
|
Primary line revamp and extension |
November 20, 2024 |
Wed |
10:00 am – 2:00 pm |
4 hr |
San Fabian |
Portion of Inmalog Sur (SFB-389) |
|
Replacement of rotten secondary pole |
November 19, 2024 |
Tue |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Burgos St. (D14-031) |
|
To install 1-50kVA distribution transformer with the existing 1-100kVA distribution transformer with secondary line revamp to serve SMV Bldg |
November 16, 2024 |
Sat |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa Phase II (SB-BS2-7) |
|
To reconductor the secondary line |
November 15, 2024 |
Fri |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa Phase II (SB-BS2-5) |
|
To reconductor the secondary line |
November 15, 2024 |
Fri |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-257) |
|
To replace corroded pole |
November 14, 2024 |
Thu |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa Phase II (SB-BS2-2) |
|
To reconductor the secondary line |
November 14, 2024 |
Thu |
8:30 am – 2:00 pm |
5.5 hr |
Dagupan City: |
Portion of Lucao (D24-108) |
|
To replace primary pole and install 3-25kVA distribution transformer to serve Rustan Coffee Corp |
November 14, 2024 |
Thu |
9:00 am – 10:00 am |
1 hr |
San Jacinto: |
Portion of Awai (SJ-Y44W23) |
|
Primary and secondary line extension and installation of 25kVA distribution transformer |
November 13, 2024 |
Wed |
8:00 am – 12:00 nn |
4 hr |
San Jacinto: |
Portion of San Jose (SJ-S6W17 to SJ-S6W23) |
|
To reroute the secondary line from the creosole pole to the concrete pole |
November 12, 2024 |
Tue |
9:00 am – 1:00 pm |
4 hr |
San Fabian: |
Portion of Anonang (SF-M27) |
|
To reconfigure pole top assembly, withdrawal of 1-span secondary line at SF-M28 |
November 9, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset, Sabangan (D22-059) |
|
To relocate secondary pole |
November 9, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of De Venencia Highway (DL3-47) |
|
To string 1-span primary line and installation of 3-50kVA transformer to serve First Belle Integrated Corporation |
November 9, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Maticmatic (SB-256) |
|
Reconfigure of primary pole and retension of primary line |
November 8, 2024 |
Fri |
9:30 am – 12:30 pm |
3 hr |
Manaoag: |
Portion of Poblacion (along Mendoza St.) (M-1122) |
|
To string 1-span primary line extension and tap primary jumper to serve Municipality of Manaoag Public Market |
November 8, 2024 |
Fri |
9:00 am – 1:00 pm |
4 hr |
San Fabian: |
Portion of Anonang (SF-M28) |
|
Reconfiguration of pole top assembly from B2 to E2 and withdrawal of 1-span secondary line |
November 8, 2024 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Buenlag (Merryland Subd.) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
November 7, 2024 |
Thu |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-256) |
|
Reconfigure the primary pole equipment protection to improve safety and reliability of our primary distribution line in the area |
November 7, 2024 |
Thu |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Dalongue (SB-D10) |
|
To uprate the distribution transformer, reconductor, and revamp the secondary line |
November 7, 2024 |
Thu |
6:00 am – 12:00 nn |
6 hr |
San Fabian: |
Portion of Bolasi (Sitio Saldo) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
November 6, 2024 |
Wed |
6:00 am – 11:00 am |
5 hr |
Calasiao: |
Puregold (C29-045) |
|
Request for isolation/disconnection and reconnection |
November 6, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Bolo (SJ-Y66X5) |
|
Uprating of distribution transformer from 25kVA to 50kVA |
November 5, 2024 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Cabanbanan (M-4088W) |
|
Line revamp |
November 2, 2024 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Sta. Barbara: |
Portion of Minien West (SB-MS2W3, SB-MS2X7) |
|
To replace rotten cross arm and insulators along Wedgewood Subdivision |
November 2, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset, Tondaligan (D23-112) |
|
Replacement of distribution transformer for preventive maintenance |
November 2, 2024 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Sta. Barbara: |
Portion of Minien East (Wedgewood Subdivision) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Tuliao (DPWH) |
|
October 31, 2024 |
Thu |
4:00 am – 9:00 am |
5 hr |
Dagupan City: |
Burgos St., Portion of Rivera St., Portion of Zamora St., Portion of Perez Blvd., Zamora Ext, Guilig St, Portion of A.B. Fernandez West |
|
Replacement of broken primary pole at Burgos St., and Rivera St. |
October 31, 2024 |
Thu |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Arzadon Subd., Mayombo (D20-FBW) |
|
Relocation of secondary pole inside private property |
October 31, 2024 |
Thu |
9:00 am – 3:40 pm |
5 hr 40 min |
Manaoag: |
Portion of Arabian Rd., Baritao (M-5404W3, M-5411M, M-5413, M-5430W4MW, M-5433, M-5430W7MW, M-5430W12, M-5430W12X11) |
|
Installation of check meter |
October 31, 2024 |
Thu |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Calanglaan, Sanggunian Village (D19-S2M to D19-S4) |
|
To install transformer and primary line extension |
October 30, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Minien West (Villa, Sta. Barbara Phase 1) (SB-BS1-26) |
|
Recondcutor of existing secondary line |
October 29, 2024 |
Tue |
8:30 am – 10:00 am |
1.5 hr |
Dagupan City: |
Portion of Bacayao Sur (D19-106) |
|
To replace 1-75kVA distribution transformer as recommended by emergency crew due to burn secondary lead |
October 29, 2024 |
Tue |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Bonuan Binloc, Sitio China (D23-462) |
|
Relocation of a pole located within the private property |
October 29,2024 |
Tue |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Minien West (Villa, Sta. Barbara Phase 1) (SB-BS1-12) |
|
Reconductor of existing secondary line |
October 28, 2024 |
Mon |
10:00 am – 3:00 pm |
5 hr |
Manaoag: |
Portion of Lelemaan (M-39) |
|
To replace cracked secondary pole |
October 28, 2024 |
Mon |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Minien West (Villa Phase 1) (SB-BS1-4 & SB-BS1-8) |
|
Reconductor of existing secondary line |
October 26, 2024 |
Sat |
6:00 am – 6:30 am |
30 min |
San Jacinto and Manaoag: |
All areas |
|
Load Shifting of DECORP San Jacinto Substation from NGCP's San Manuel Substation to NGCP's Balingueo Substation and Vice-Versa through DECORP Balingueo-Calasiao 69kV line |
3:30 pm – 4:00 pm |
30 min |
October 25,2024 |
Fri |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Minien West (Villa, Phase 1) (SB-BS1-12) |
|
Reconductor of existing secondary line |
October 24, 2024 |
Thu |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Minien West (Villa, Phase 1) (SB-BS1-4 & SB-BS1-8) |
|
Reconductor of existing secondary line |
October 23, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Minien West (Villa, Phase 1) (SB-BS1-26) |
|
Recondcutor of existing secondary line |
October 22, 2024 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Parongking (C32-019-X3) |
|
To uprate the transformer from 50kVA to 1-75kVA |
October 22, 2024 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Buenlag, Merryland Subdivision (C35-053W2W4) |
|
Transfer of secondary lines to new utility poles |
October 22, 2024 |
Tue |
9:00 am – 3:00 pm |
6 hr |
San Jacinto: |
Portion of Sta. Cruz (SC-012) |
|
To isolate sectionalizing cut out at SC-012 serving distribution transformer SJC008 |
October 20, 2024 |
Sun |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
I, II, IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao, Pantal, Poblacion Oeste, Portion of Lasip Grande, Pogo Chico, Pugaro Suit, Salapingao, Tapuac, Portion of Perez Blvd., and De Venecia Hi-way Extension |
|
Load shifting of DECORP Dagupan Substation from NGCP's Labrador Substation through DECORP Balingueo-Calasiao 69kV line to NGCP's Balingueo Substation and Vice Versa |
October 19, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Caranglaan (D19-27) |
|
Load splitting of secondary line to serve Alfa Mart |
October 19, 2024 |
Sat |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
I, II, IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao, Pantal, Poblacion Oeste, Portion of Lasip Grande, Pogo Chico, Pugaro Suit, Salapingao, Tapuac, Portion of Perez Blvd., and De Venecia Hi-way Extension |
|
Load shifting of DECORP Dagupan Substation from NGCP's Labrador Substation through DECORP Balingueo-Calasiao 69kV line to NGCP's Balingueo Substation and Vice Versa |
October 18, 2024 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Binloc (Sitio China) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
11:00 am – 12:00 nn |
1 hr |
Dagupan City: |
Portion of Bonuan Binloc (From DSWD AVRC to Sitio Korea) |
|
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Bonuan Binloc (Sitio Bliss) |
|
October 18, 2024 |
Fri |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa Phase 1 (SB-BS1-8) |
|
Reconductoring of existing secondary line |
October 17, 2024 |
Thu |
8:30 am – 10:30 am |
2 hr |
Dagupan City: |
Portion of Bonuan Gueset, Tondaligan (D23-F1) |
|
Uprating of 50kVA distribution transformer with 75kVA distribution transformer |
October 17, 2024 |
Thu |
11:45 am – 12:00 nn |
15 min |
Calasiao: |
Buenlag, Songkoy, and portion of Macabito (from Green Ville to corner of Sitio Ano) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
5:00 am – 12:00 nn |
7 hr |
Calasiao: |
Portion of Macabito (from corner of Sitio Ano to MJC Gas Station) |
|
5:00 am – 8:00 am |
3 hr |
Calasiao: |
Portion of Macabito (From Green Ville to corner of Sitio Ano) |
|
5:00 am – 5:15 am |
15 min |
Calasiao: |
Buenlag and Songkoy |
|
7:45 am – 8:00 am |
15 min |
October 17, 2024 |
Thu |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Dalongue (SB-D10) |
|
Revamp and extension of the secondary line |
October 17, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-038M) |
|
Secondary line revamp |
October 17, 2024 |
Thu |
8:00 am – 5:00 pm |
9 hr |
Dagupan City: |
Portion of Pantal (D7-017, D7-010, D7-015M3, DB-5, D7-002, DB-23, D-007, D-008) |
|
Installation of check meter |
October 16, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa (SB-BS1-1) |
|
Reconductor of existing secondary line |
October 16, 2024 |
Wed |
10:00 am – 3:00 pm |
5 hr |
Calasiao: |
Portion of Banaoag (C33-C2) |
|
To relocate the primary pole and its distribution transformer to the proposed location due to a right-of-way obstruction |
October 16, 2024 |
Wed |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of A.B. Fernandez East (D10-016W2) |
|
Replacement of rusted secondary poles |
October 16, 2024 |
Wed |
8:30 am – 10:30 am |
2 hr |
Dagupan City: |
Portion of Bonuan Gueset (Purok Pagkakaisa) (D23-F1) |
|
Uprating of 50kVA distribution transformer to 75kVA distribution transformer |
October 16, 2024 |
Wed |
8:30 am – 10:30 am |
2 hr |
San Fabian: |
Portion of Poblacion (SF-414) |
|
Transfer of secondary lines to new pole and removal of old poles |
October 15, 2024 |
Tue |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB59) |
|
Revamp and extension of primary and secondary lines |
October 15, 2024 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Colisao (SFB0305) |
|
To remove 3-span of old luelco wire |
October 13, 2024 |
Sun |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
I, II, IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao, Pantal, Poblacion Oeste, Portion of Lasip Grande, Pogo Chico, Pugaro Suit, Salapingao, Tapuac, Portion of Perez Blvd., and De Venencia Highway Extension |
|
Load shifting of DECORP Dagupan Substation from NGCP's Labrador Substation through DECORP Balingueo-Calasiao 69kV line to NGCP's Balingueo Substation and vice versa |
October 12, 2024 |
Sat |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
I, II, IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao, Pantal, Poblacion Oeste, Portion of Lasip Grande, Pogo Chico, Pugaro Suit, Salapingao, Tapuac, Portion of Perez Blvd., and De Venencia Highway Extension |
|
Load shifting of DECORP Dagupan Substation from NGCP's Labrador Substation through DECORP Balingueo-Calasiao 69kV line to NGCP's Balingueo Substation and vice versa |
October 12, 2024 |
Sat |
8:00 am – 4:00 pm |
8 hr |
Dagupan City: |
Portion of Lasip Grande (D26-004, D26-005M, D26-014, D26-019, D26-017, D26-031, D26-033, D26-036) |
|
Installation of check arrester |
October 12, 2024 |
Sat |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Malued (D27-017) |
|
To uprate distribution transformer |
October 12, 2024 |
Sat |
8:00 am – 11:00 am |
3 hr |
Dagupan City: |
Portion of Tapuac (D24-044) |
|
To isolate the transformer bank and balance the load |
October 12, 2024 |
Sat |
11:00 am – 11:15 am |
15 min |
San Fabian: |
Portion of Cayanga (BSF-154) |
|
Reconductoring of 5-span primary line from #2 to #4 ACSR and assist in switching of F45 to F43 |
October 12, 2024 |
Sat |
11:00 am – 12:00 nn |
1 hr |
San Fabian: |
Cayanga, Sagud Bahley, Nibaliw Navarte, Nibaliw Vidal, Nibaliw Center, Nibaliw Magliba, and Portion of Longos Amangonan |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
5:00 am – 6:00 am |
1 hr |
5:00 am – 12:00 nn |
7 hr |
San Fabian: |
Nibaliw East and Portion of Poblacion (Espejo St., Sison St., Alvear St., and Caballero St.)
|
|
11:45 am – 12:00 nn |
15 min |
San Fabian: |
Tempra-Guilig, Anonang, Portion of Angio, and Cabaruan |
|
5:00 am – 5:15 am |
15 min |
October 11, 2024 |
Fri |
10:00 am – 12:00 nn |
2 hr |
Calasiao: |
Portion of Doyong (C34-106) |
|
Relocation and uprating of 1-25kVA to 1-50kVA distribution transformer |
October 11, 2024 |
Fri |
9:30 am – 12:00 nn |
2.5 hr |
Dagupan City: |
Portion of Bonuan Gueset, Sabangan (D22-059) |
|
Replacement of oil leak at 1-75kVA distribution transformer |
October 11, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Mancup (C35-052) |
|
Relocation of secondary pole due to drainage construction |
October 11, 2024 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Lucao (D24-171W) |
|
Primary line revamp and to deviate the primary line due to house construction |
October 11, 2024 |
Fri |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa (SB-BS1-29) |
|
Reconductoring of existing secondary line |
October 10, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Poblacion (SF-414) |
|
To install 75kVA with secondary line revamp |
October 10, 2024 |
Thu |
5:00 am – 12:00 nn |
7 hr |
Sta. Barbara: |
Portion of Minien West (Villa Lopez, Camella Heights and Damam) and Portion of Tebag East (Interior road from Pentecostal Church) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
October 10, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Mancup (C34-052) |
|
Relocation of secondary pole due to drainage construction |
October 9, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Villa (SB-BS1-4) |
|
Reconductoring of existing secondary line |
October 9, 2024 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Colisao (SFB-0305) |
|
To withdraw 3-span old line to ground of Luelco line |
October 9, 2024 |
Wed |
9:00 am – 1:00 pm |
4 hr |
San Fabian: |
Portion of Inmalog Sur (SFB-0247) |
|
To isolate secondary jumper to replace rotten pole |
October 6, 2024 |
Sun |
6:00 am – 6:30 am |
30 min |
San Jacinto and Manaoag: |
All areas |
|
Load shifting of DECORP San Jacinto Substation from NGCP's San Manual Substation through DECORP Balingueo-Calasiao 69kV line and vice versa |
10:30 am – 11:00 am |
30 min |
October 5, 2024 |
Sat |
8:00 am – 4:00 pm |
8 hr |
Dagupan City: |
Portion of Bonuan Gueset, Tondaligan (D23-F9) |
|
Replacement of rusted distribution transformer, hardware, accessories and to improve secondary line connection |
October 5, 2024 |
Sat |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Anonang (SF-M68W16) |
|
Relocation of secondary poles due to road widening |
October 4, 2024 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Poblacion Oeste, Careenan (D14-002) |
|
Replacement of rotten pole and reconductor of secondary line |
October 4, 2024 |
Fri |
6:00 am – 11:00 am |
5 hr |
San Fabian: |
Longos Proper |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
October 3, 2024 |
Thu |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Tebuel (MG-4109W4) |
|
Reconductor the #2 secondary line with 4.0 ACSR WP |
October 2, 2024 |
Wed |
1:00 pm – 3:30 pm |
2.5 hr |
Manaoag: |
Portion of Poblacion, Soriano St. (MG-1316) |
|
Uprating of 75kVA to 100kVA distribution transformer to serve new customer |
October 2, 2024 |
Wed |
10:30 am – 2:00 pm |
3.5 hr |
Sta. Barbara: |
Portion of Maningding (SB-MB4) |
|
Relocation of primary pole due to building construction |
October 2, 2024 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Bued (C32-164MW19) |
|
Relocation of poles and transfer of secondary lines to new poles |
October 1, 2024 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
Sta. Barbara: |
Portion of Poblacion (CSB-130) |
|
Replace the existing 1-75kVA distribution transformer with a 1-50 kVA transformer at CSB-130 and install an additional 1-75 kVA transformer at CSB-131 for Carlito Zaplan's application related to the renovated Municipal Hall |
September 30, 2024 |
Mon |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB53W to SB-CB53W13) |
|
Primary and secondary line extension with revamp |
September 28, 2024 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Sta. Barbara: |
Portion of Minien West (Villa Lopez, Camella Heights, and Damam) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
September 26, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Tapuac (D24-094 near Mamalol's Restaurant) |
|
Derating of 2-100kVA distribution transformer to 1-75kVA distribution transformer and replacement of rusted line materials |
September 26, 2024 |
Thu |
9:00 am – 5:00 pm |
8 hr |
San Jacinto: |
Portion of Bilo (SJC0081-SJC0158) |
|
Tapping of 12 secondary line extension at SJ-2309 |
September 26, 2024 |
Thu |
6:00 am – 10:00 am |
4 hr |
Manaoag: |
Portion of Lipit Pugaro (M-3529M) |
|
Energization of new primary poles and transfer secondary line to new poles |
10:00 am – 2:00 pm |
4 hr |
Manaoag: |
Portion of Lipit Pugaro (M-2478) |
|
September 26, 2024 |
Thu |
9:00 am – 1:00 pm |
4 hr |
Dagupan City: |
Portion of Malued (D27-017) |
|
To replace / uprate transformer from 50kVA to 75kVA |
September 26, 2024 |
Thu |
6:00 am – 10:00 am |
4 hr |
Manaoag: |
Portion of Lipit Sur (Lipit-Pugaro) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
September 26, 2024 |
Thu |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Bued (C32-164MW3) |
|
Relocation of poles and transfer of secondary lines to new poles |
September 25, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Carlos: |
Portion of Bolingit (SC-030MW7) |
|
Relocation of secondary pole |
September 25, 2024 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Malued (D27-016MW3) |
|
To reconductor 11 span secondary line |
September 25, 2024 |
Wed |
6:00 am – 11:00 am |
5 hr |
San Fabian: |
Portion of Cayanga (Interior road from Far East Maritime Academy & Technological Corp.)
|
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
September 25, 2024 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Bued (C32-164MW19 to C32-164MW31)
|
|
Relocation of poles and transfer of secondary lines to new poles |
September 25, 2024 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Mancup (C34-032) |
|
Uprating of distribution transformer and relocation of poles |
September 24, 2024 |
Tue |
9:00 am – 10:00 am |
1 hr |
Dagupan City: |
Portion of Salisay (D12-219) |
|
Load splitting and withdrawal of transformer at D12-218. Tapping of secondary line at D12-216 and D12-219 |
10:00 am – 11:00 am |
1 hr |
Dagupan City: |
Portion of Salisay (D12-216M) |
|
September 24, 2024 |
Tue |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Sagud Bahley (SF-164M to SF-164MW5 along Riverside) |
|
Relocation of poles due to road construction |
September 23, 2024 |
Mon |
9:00 am – 11:30 am |
2.5 hr |
Calasiao: |
Portion of Gabon (C32-012) |
|
Uprating of 50kVA to 75kVA distribution transformer to serve Ernesto Loresco |
September 23, 2024 |
Mon |
11:00 am – 3:00 pm |
4 hr |
San Jacinto: |
Portion of Lobong (SJ-F38W) |
|
To relocate secondary poles due to road widening |
September 23, 2024 |
Mon |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Nibaliw Center (SF-166) |
|
Reconductoring and revamp of secondary line |
September 21, 2024 |
Sat |
10:30 am – 3:30 pm |
5 hr |
San Jacinto: |
Portion of San Jose Sitio Balanay (SJ-S6W17W2) |
|
To reroute secondary line due to house construction and withdraw old creosoted pole |
September 21, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-B16) |
|
Primary line revamp and to transfer secondary lines to new poles |
September 20, 2024 |
Fri |
1:00 pm – 4:00 pm |
3 hr |
Calasiao: |
Portion of Mancup (C34-042) |
|
Splitting of secondary line |
September 20, 2024 |
Fri |
8:30 am – 11:30 am |
3 hr |
Calasiao: |
Portion of Bued (near boundary of Cabilocaan C32-113) |
|
Withdrawal of existing 50kVA distribution transformer. The existing load will serve the newly installed 75kVA distribution transformer |
September 20, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Malabago Sitio Bakul (C32-SB17W3) |
|
Relocation of secondary pole due to house construction |
September 19, 2024 |
Thu |
1:30 pm – 3:30 pm |
2 hr |
Calasiao: |
Portion of Bued (C32-113) |
|
Withdrawal of existing 50kVA distribution transformer at C32-113; the existing load will serve the newly installed 75kVA distribution transformer at C32-112 and the existing 50kVA at C32-113W2 |
September 19, 2024 |
Thu |
10:00 am – 4:00 pm |
6 hr |
Sta. Barbara: |
Portion of Leet (SB-231W7W3) |
|
To reroute secondary line due to road widening |
September 19, 2024 |
Thu |
8:00 am – 2:00 pm |
6 hr |
Sta. Barbara: |
Portion of Minien East Sitio Damam (SB-DM25) |
|
Secondary line stringing from SB-DM30 to SB-DM34 and transfer of service drop |
September 19, 2024 |
Thu |
2:00 pm – 5:00 pm |
3 hr |
Sta. Barbara: |
Portion of Minien East Sitio Damam (SB-DM37) |
|
Withdraw existing secondary line from SB-DM37 to SB-DM40 and transfer service drop |
September 19, 2024 |
Thu |
9:00 am – 11:00 am |
2 hr |
Calasiao: |
Portion of Buenlag (Sitio Lasip) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
6:00 am – 12:00 nn |
6 hr |
Manaoag: |
Portion of Pugaro (from Shine blue water station to Manaoag Water Dist.) |
|
6:00 am – 7:00 am |
1 hr |
Manaoag: |
Portion of Poblacion (From Mormons Church to Welcome Arc of Pugaro) and Pugaro |
|
11:00 am – 12:00 nn |
September 18, 2024 |
Wed |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of Pantal (DL2-6MW5) |
|
Replacement of overloaded 50kVA to 100kVA distribution transformer |
September 18, 2024 |
Wed |
8:00 am – 8:15 am |
15 min |
Sta. Barbara: |
Portion of Malanay (SB-M22) |
|
Transfer of service drop and removal of poles/secondary lines |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Malanay (SB-M22W2M2 to SB-M22W2M2W5) |
|
September 17, 2024 |
Tue |
9:00 am – 11:00 am |
2 hr |
San Jacinto: |
Portion of San Juan (SJ-MB19 to SJ-MB19W8 along Sitio Mambog) |
|
Transfer of secondary line to new pole |
September 17, 2024 |
Tue |
8:00 am – 5:00 pm |
9 hr |
Dagupan City: |
Portion of Perez Blvd. (D24-025W) |
|
Uprating of 3-100kVA to 3-167kVA distribution transformer with line revamp to serve P & C Fernandez Realty Development |
September 16, 2024 |
Mon |
8:30 am – 4:30 pm |
8 hr |
Calasiao: |
Portion of Malabago (C34-SB17 to C34-SB24 along Sitio Bakul) |
|
To reconductor 8-span secondary line |
September 14, 2024 |
Sat |
7:30 am – 5:00 pm |
9.5 hr |
Dagupan City: |
Portion of Perez Blvd. (D24-025W) |
|
Uprating of 3-100kVA to 3-167kVA distribution transformer with line revamp to serve P & C Fernandez Realty Development |
September 14, 2024 |
Sat |
8:30 am – 3:00 pm |
6.5 hr |
Dagupan City: |
Portion of Bonuan Tondaligan (D23-073) |
|
Reconductoring of assorted melted secondary line |
September 14, 2024 |
Sat |
10:00 am – 12:00 nn |
2 hr |
Dagupan City: |
Portion of Malued (D27-024) |
|
To string 4-span secondary line and bundle to the existing line |
September 13, 2024 |
Fri |
10:30 am – 4:30 pm |
6 hr |
Manaoag: |
Portion of Baritao (M-5452W2) |
|
To reroute secondary line due to house construction |
September 12, 2024 |
Thu |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset(Along with Alfamart) (D23-085) |
|
Installation of 1-50kVA distribution transformer (D23-085) to serve Alfamart Trading Phils. Inc. Bonuan Gueset, Dagupan City |
September 12, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Rabon (SF-R23) |
|
To isolate transformer at SFB0112 and withdrawn 4-span old secondary line |
September 11, 2024 |
Wed |
10:00 am – 2:00 pm |
4 hr |
Calasiao: |
Portion of Nalsian (C30-001M) |
|
To reconductor secondary line to serve Alfamart |
September 10, 2024 |
Tue |
10:00 am – 4:00 pm |
6 hr |
Manaoag: |
Potion of Baloking (M-2054W7) |
|
To isolate secondary jumper to re-route secondary line |
September 7, 2024 |
Sat |
9:00 am – 1:00 pm |
4 hr |
Manaoag: |
Portion of Mermer (MG-5553W6) |
|
To relocate secondary pole due to road widening |
September 7, 2024 |
Sat |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-007W) |
|
Replacement of rotten secondary poles |
September 7, 2024 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Calasiao: |
Portion of Gabon (C32-013W4 to C32-009W) |
|
Secondary line revamp |
September 5, 2024 |
Thu |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Rabon (SFB-0180W2) |
|
To string 5 span secondary line to convert line ground old line |
September 4, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Balingueo (CSB-224) |
|
Uprating of 1-25kVA to 1-75kVA distribution transformer with line revamp to serve Citicore Solar Pangasinan |
September 4, 2024 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Talibaew (C29-W53 to C29-W57) |
|
To relocate secondary pole with existing double distribution transformer on secondary line |
September 4, 2024 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB54) |
|
Primary and secondary line extension with revamp |
September 2, 2024 |
Mon |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of A.B. Fernandez East (D11-067 to D11-069) |
|
Withdrawal of 150 kVA distribution transformer at pole number D11-067, the existing load will serve the new number installed 1-75 kVA distribution transformer at pole number D11-068 |
August 31, 2024 |
Sat |
6:00 am – 9:00 am |
3 hr |
Dagupan City: |
Portion of Arellano St. (R1MC) |
|
Reconfiguration and installation of backarm dressing for the new service drop of new 3-250 kVA distribution transformer additional capacity for R1MC |
August 31, 2024 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Arellano St. (D21-057W3) |
|
To transfer source of R1MC and NEPO Mall from F36 to F15 (D21-057 and D21-079) |
6:45 am – 7:00 am |
August 30, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Buenlag (C35-002Y8W6X) |
|
Relocation of secondary pole due to house construction |
August 30, 2024 |
Fri |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Barrera St. (D10-016W2) |
|
Replacement of rusted secondary poles |
August 30, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Lucao-Arco (Interior street of De Venecia Extension) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
August 29, 2024 |
Thu |
8:30 am – 10:30 am |
2 hr |
Calasiao: |
Portion of Gabon (C32-004) |
|
Uprating of 1-50kVA to 1-100kVA distribution transformer |
1:00 pm – 4:00 pm |
3 hr |
Calasiao: |
Portion of Dinalaonan (C33-15W8) |
|
To replace cracked pole |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Buenlag (C35-004) |
|
To load split secondary line |
August 28, 2024 |
Wed |
2:00 pm – 5:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-X7W13M) |
|
To replace overloaded transformer |
12:00 nn – 3:00 pm |
3 hr |
Dagupan City: |
Portion of A.B. Fernandez East (D11-061W5W) |
|
August 27, 2024 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Malued (D27-026) |
|
To uprate distribution transformer and secondary line reconductoring |
August 24, 2024 |
Sat |
2:00 pm – 5:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-X7W13M) |
|
To replace overloaded transformer |
12:00 nn – 3:00 pm |
3 hr |
Dagupan City: |
Portion of A.B. Fernandez East |
|
To replace overloaded transformer at D11-061W5W |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Lucao District (D24-D7W2) |
|
Correction of looping primary line |
August 23, 2024 |
Fri |
9:00 am – 12:30 pm |
3.5 hr |
San Fabian: |
Portion of Tempra-Guilig (SF-S2W3) |
|
To reroute secondary line due to building construction |
August 23, 2024 |
Fri |
9:00 am – 4:00 pm |
8 hr |
Sta. Barbara:: |
Portion of Botao (SB-B32 to SB-B43W4) |
|
Re-conductoring of existing primary line from SB-B38 to SB-B43W |
August 22, 2024 |
Thu |
1:00 pm – 5:00 pm |
4 hr |
San Fabian: |
Portion of Sagud Bahley (SF-174W2) |
|
Withdrawal of 50kVA distribution transformer with existing load that will server the new installed 2-50kVA distribution transformer |
August 22, 2024 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac Fabrica (Parac-Parac) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Aramal (Sitio Amansec) |
|
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Aramal (SF-ML4) |
|
Energization of transformer |
August 21, 2024 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Pantal-Nable (D8-013W3) |
|
Reconductoring of melted secondary line |
August 21, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Minien West (SB-DM25 to SB-DM40) |
|
Continuation of secondary line extension with load splitting for additional capacity of 25kVA @ SB-DM37 |
August 20, 2024 |
Tue |
9:30 am – 12:30 pm |
3 hr |
San Fabian: |
Portion of Lipit Tomeeng (SFB0445) |
|
Correction of secondary line due to looping wire |
August 20, 2024 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Calaocan (MG-3015W) |
|
To isolate secondary line and to install UPAS assembly by reconfiguring the secondary line to attain better clearances |
Sta. Barbara: |
Portion of Maninding (SB-MB13) |
|
Recondutoring of secondary line |
Calasiao: |
Portion of Mancup (C34-038W6 to C34-038W3M) |
|
Load splitting of secondary line |
August 19, 2024 |
Mon |
9:30 am – 11:00 am |
1.5 hr |
Sta. Barbara: |
Portion of Dalongue (SB-D10) |
|
Uprating of 25kVA to 50kVA distribution transformer due to overloaded transformer |
August 19, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Inmalog Sur (SF-IS7) |
|
To isolate distribution transformer serving SFB0045 and to withdraw old secondary line |
Manaoag: |
Portion of Calaocan (MG-3014) |
|
Installation of UPAS |
August 17, 2024 |
Sat |
5:30 am – 5:45 am |
15 min |
Calasiao: |
Portion of Doyong and Nagsaing |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
10:15 am – 10:30 am |
15 min |
5:00 am – 11:00 am |
6 hr |
Calasiao: |
Portion of San Vicente (from San Vicente Brgy hall to Garcia Bldg) |
|
5:00 am – 5:30 am |
30 min |
Calasiao: |
Dinalaonan and Ambuetel |
|
10:30 am – 11:00 am |
30 min |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Buenlag (C35-004 Solane LPG Delivery Calasiao) |
|
To reconductor 6-span secondary line |
August 16, 2024 |
Fri |
9:30 am – 12:30 pm |
3 hr |
San Fabian: |
Portion of Inmalog Norte (SFB0234) |
|
To lower the secondary line (line to ground) in order to achieve better clearance from the primary line |
August 16, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bacayao Norte (D19-042) |
|
Installation of 1-100kVA distribution transformer and load splitting |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bonuan Blue Beach Subdivision (Sugpo St. D23-104W26) |
|
Replacement of rotten and leaning secondary pole, re-sagging of looping secondary line and extensive trimming |
August 15, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of San Vicente (SJ-035) |
|
Replacement of secondary rack and re-sag looping secondary line |
August 15, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Aramal (Sitio Amansec) |
|
Primary line revamp to improve the safety and reliability of our primary line distribution line in the area |
San Fabian: |
Portion of Angio (Along Taculit-Amansec Rd. SF-ML4W2) |
|
Withdrawal and energization of distribution transformer |
August 14, 2024 |
Wed |
11:00 am – 12:30 pm |
1.5 hr |
Dagupan City: |
Portion of Caranglaan (D19-076) |
|
Uprating of 1-50kVA distribution transformer to 1-75kVA distribution transformer with 1 span secondary line extension and line revamp |
10:00 am – 4:00 pm |
6 hr |
Dagupan City:  |
Portion of Rioferio Rd, Arellano St. (D21-081X2 to D21-081X5) |
|
Replacement of the broken and leaning secondary pole and transfer of attachments of the said pole |
August 14, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Inmalog Sur (SF-IS71) |
|
Replacement of rotten secondary pole |
August 13, 2024 |
Tue |
11:00 am – 1:00 pm |
2 hr |
Calasiao: |
Portion of Nalsian (C29-039 along Panki St.)
|
|
Rerouting of secondary line due to house construction |
August 12, 2024 |
Mon |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Carael (D1-004 along Sitio Talaib/Tocok) |
|
Secondary revamp to address the overloaded transformer |
August 12, 2024 |
Mon |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Nibaliw West (SF-181W along Center Beach) |
|
Replacement of rotten pole and rerouting of secondary line |
August 10, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Malanay (SB-M22W2M2 to SB-M22W2MW4) |
|
To transfer the existing secondary line to newly erected poles |
August 10, 2024 |
Sat |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bonuan Catacdang (D22-035) |
|
Secondary line reconductoring to address the under voltage complaint |
August 10, 2024 |
Sat |
5:00 am – 10:00 am |
5 hr |
Dagupan City: |
Bacayao Norte |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
August 10, 2024 |
Sat |
9:00 am – 5:00 pm |
8 hr |
Calasiao: |
Portion of Gabon (C32-099 to C32-013) |
|
Secondary line revamp and load splitting at C32-099 and C32-013 |
August 9, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
Sta Barbara: |
Portion of Botao (SB-B32 to SB-B43W4) |
|
Reconductor of existing secondary line from SB-B38 to SB-43W2 |
August 8, 2024 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Bolaoen (SF-IS138) |
|
Installation of distribution arrester |
San Fabian: |
Portion of Bolaoen (Bolaoen West) and Gumot |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
August 8, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bolosan Dist. (D12-213 along Bolosan Old Rd.) |
|
Installation of bayonet to elevate secondary line |
August 8, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Cabanbanan (M-4088W) |
|
Installation of bayonet and rerouting of secondary line |
August 5, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Bisbisocol (SFB0555) |
|
To replace the rotten secondary pole |
August 5, 2024 |
Mon |
1:00 pm – 4:00 pm |
3 hr |
Calasiao: |
Portion of Bued (C34-164MW19) |
|
To replace and relocate the secondary pole because of soil erosion |
August 3, 2024 |
Sat |
8:00 am – 4:00 pm |
8 hr |
Calasiao: |
Portion of Talibaew (C34-029W5W4 to C34-029W5W7) |
|
To isolate secondary line and reconductoring of assorted lines |
August 3, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Manaoag: |
Portion of Poblacion (M-1318 along Soriano St.) |
|
Relocation of primary pole (MG-1317) due to right of way |
August 3, 2024 |
Sat |
2:00 pm – 4:00 pm |
2 hr |
Manaoag: |
Portion of Poblacion (M-1801 along Mendoza St.) |
|
Uprating of 50kVA to 75 kVA distribution transformer with secondary line revamp to serve Alfamart Trading Phils. Inc. |
August 3, 2024 |
Sat |
9:00 am – 11:00 am |
2 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-423 along Dagupan-San Fabian Hi-way) |
|
Uprating of 75kVA to 100kVA distribution transfomer to serve the 3 new applicants |
August 3, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Sta Barbara: |
Portion of Malanay and Nilombot (from Malanay Elementary School to Nilombot Zone III) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
August 2, 2024 |
Fri |
11:00 am – 3:00 pm |
4 hr |
Manaoag: |
Portion of Poblacion (M-1317 along Soriano St.) |
|
Relocation of 75kVA distribution transformer and primary pole due to right of way |
August 1, 2024 |
Thu |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Sobol (SF-S22W2 to SF-S22W5) |
|
To install 4 secondary line extension |
July 31, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Sta. Cruz (SJ-SC12) |
|
To withdraw 2-span line to ground primary and secondary line |
July 31, 2024 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Lasip Grande (D26-038W4-Lasip Centro) |
|
To relocate and replace secondary line due to road elevation |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-472 Sitio China) |
|
Uprating of the distribution transformer and reconductoring of existing secondary line |
July 30, 2024 |
Tue |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Angio (SF-ML4W2 along Sitio Amansec Rd.) |
|
Transfer of secondary line to new poles |
July 29, 2024 |
Mon |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Malued (D27-024 along Tamayo Rd.) |
|
To reconductor secondary line |
July 27, 2024 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Sta Barbara: |
Portion of Minien West (Villa Lopez) and portion of Minien East (Sitio Salvador, Sitio Visperas and Wedgewood Heights Subdivision) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
July 26, 2024 |
Fri |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of Lasip Grande (D26-038W4 along Lasip Centro) |
|
To relocate and replace secondary pole due to road elevation |
July 25, 2024 |
Thu |
1:00 pm – 3:00 pm |
2 hr |
San Fabian: |
Portion of Nibaliw Center (SF-171 along Blanquera St.) |
|
Transfer of secondary line and withdrawal of pole at SF-168MM |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Nibaliw Center (SF-270 to SF-166W6) |
|
Energization of transformer and transferring of secondary line to new poles |
July 24, 2024 |
Wed |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City:  |
Portion of Perez Market Site (D20-037M5) |
|
To relocate and replace rotten secondary pole |
July 23, 2024 |
Tue |
10:00 am – 5:00 pm |
7 hr |
Sta Barbara: |
Portion of Tuliao (SB-042) |
|
Installation of 1-37.5kVA distribution transformer with secondary line revamp to serve Reynaldo C. Yanes. Withdrawal of 1-25kVA distribution transformer sole user at SB-042 |
July 20, 2024 |
Sat |
11:00 am – 3:00 pm |
4 hr |
Dagupan City:  |
Portion of Malued (D27-039) |
|
Replacement of rotten pole and reconductoring of secondary line |
July 17, 2024 |
Wed |
9:30 am – 1:30 pm |
4 hr |
Sta Barbara: |
Portion of Maronong (SB-152-W2) |
|
To relocate secondary pole from private property |
July 16, 2024 |
Tue |
10:00 am – 3:00 pm |
5 hr |
Sta Barbara: |
Portion of Maningding (SB-157-4W) |
|
To reroute secondary line |
July 15, 2024 |
Mon |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Bolasi (SF-101W16) |
|
Replacement of 1-37.5kVA to 2-75kVA distribution transformer with line revamp to serve RLG Realty Corporation |
July 13, 2024 |
Sat |
5:30 pm – 6:00 pm |
30 min |
San Jacinto and Manaoag: |
All areas |
|
NGCP's schedule power interruption to implement the closing of LBS Sapang facing PANELCO III - Urdaneta 1 substation metering facility |
July 13, 2024 |
Sat |
5:00 am – 11:00 am |
6 hr |
Calasiao: |
Portion of San Miguel (Parongking) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
Calasiao: |
Portion of Ambonao (Sitio Cruz and Sitio Balani) and Cabilocaan |
|
July 12,2024 |
Fri |
9:30 am – 12:00 nn |
2.5 hr |
Calasiao: |
Portion of Sitio Parongking, San Miguel (C29-130XM to C29-130) |
|
Uprating of 25kVA to 50kVA distribution transformer |
July 12, 2024 |
Fri |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Lucao (D24-136W4) |
|
Relocation of secondary poles and rerouting of secondary line due to house construction |
July 12, 2024 |
Fri |
9:00 am – 1:00 pm |
4 hr |
Dagupan City: |
Portion of Perez Market (D20-037M5) |
|
Relocate and replace rotten creo pole |
July 9, 2024 |
Tue |
1:00 pm – 2:30 pm |
1.5 hr |
Calasiao: |
Portion of Poblacion (C32-027) |
|
Replacement of busted lightning arrester |
July 8, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Sition Parongking, San Miguel (C29-126) |
|
Installation of 1-75kVA transformer with secondary line revamp |
July 8, 2024 |
Mon |
1:00 pm – 3:00 pm |
2 hr |
San Fabian: |
Portion of Rabon (Interior from DG Pelayno Gas Station to RJC Resort) |
|
Transfer of secondary line and withdrawal of old primary line (IDLE) |
July 8, 2024 |
Mon |
1:00 pm – 3:00 pm |
2 hr |
San Fabian: |
Portion of Rabon (SF-148-65 to SF-R35) |
|
To install 25 kVA distribution transformer |
July 6, 2024 |
Sat |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Rabon (SF-148-28 to SF148-47) |
|
To reconduct 10-span secondary line |
July 6, 2024 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Calasiao: |
Portion of Macabito (Sitio Dapit
Sagur) |
|
Primary line revamp to improve the safety and
reliability of our primary distribution line in the area |
July 5, 2024 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Buenlag (Sitio Lasip) |
|
Primary line revamp to improve the safety and
reliability of our primary distribution line in the area |
July 4, 2024 |
Thu |
1:00 pm – 4:30 pm |
3.5 hr |
Calasiao: |
Portion of Banaoang (C33-001W) |
|
Uprating of 25 and 50kVA distribution transformer to 2-100 kVA distribution transformer |
July 4, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Ambalangan Dalin
(Sitio Bisbisucol) |
|
Primary line revamp to improve the safety and
reliability of our primary distribution line in the area |
July 3, 2024 |
Wed |
6:00 am – 12:00 nn |
6 hr |
Manaoag: |
Portion of Poblacion (Aquino
St. and Galaban St.), Baritao, Pantal, Mermer and San Ramon |
|
Primary line revamp to improve the safety and
reliability of our primary distribution line in the area |
July 3, 2024 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Sta Barbara: |
Portion of Leet (A. SB-L1-14 to SB-L1-18) |
|
To replace rotten secondary pole and withdrawal of idle primary line |
1:00 pm – 4:00 pm |
3 hr |
Sta Barbara: |
Portion of Leet (A. SB-L1-25 to SB-L1-34) |
|
July 2, 2024 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Lasip Grande (D26-057) |
|
To replace and relocate four secondary poles |
July 1, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Awai (SJ-A49) |
|
To replace rotten secondary pole and withdrawal of idle primary line |
1:00 pm – 4:00 pm |
3 hr |
June 29, 2024 |
Sat |
1:00 pm – 5:00 pm |
4 hr |
San Fabian: |
Portion of Angio (SF-491 to SF-ML7) |
|
To load split and reconductoring of secondary line |
June 29, 2024 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Bonuan Gueset (Purok Pagkakaisa) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
June 28, 2024 |
Fri |
1:00 pm – 3:00 pm |
2 hr |
Manaoag: |
Portion of Sapang (M-3027W8W2 to M-3027W8W3) |
|
Load splitting of secondary line at M-3027W8W2 |
June 27, 2024 |
Thu |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Lipit Tomeeng (Interior of Tagaytay Bakery) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
June 26, 2024 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (D22-031W2) |
|
To replace and relocate secondary pole |
June 25, 2024 |
Tue |
4:30 am – 5:00 am |
30 min |
San Jacinto and Manaoag: |
All areas |
|
Load shifting of DECORP San Jacinto Substation and CENPELCO Guilig Substation from NGCP's Balingueo Substation through DECORP Balingueo |
8:00 am – 8:30 am |
30 min |
June 22, 2024 |
Sat |
9:00 am – 2:00 pm |
5 hr |
Manaoag: |
Portion of Oraan West (MG-5844) |
|
Relocation of poles and installation of pole brace due to road widening |
June 22, 2024 |
Sat |
5:00 am – 12:00 nn |
7 hr |
San Fabian: |
Portion of Nibaliww West (Magliba, Sea Side and Center Beach) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
June 21, 2024 |
Fri |
8:30 am – 10:00 am |
1.5 hr |
Sta Barbara: |
Portion of Primicias (SB-185W6W4) |
|
Replacement of overloaded 1-25kVA to 1-75kVA distribution transformer |
June 21, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Anonang (SF-M68W to SF-M68W9) |
|
To upgrade pin insulators to pin post type and install lightning arrester |
June 20, 2024 |
Thu |
6:00 am – 10:00 am |
4 hr |
San Fabian: |
Portion of Alacan (Macayan Street) |
|
Primary line extension and primary line revamp to serve the new customers in the area |
June 20, 2024 |
Thu |
1:00 pm – 4:00 pm |
3 hr |
Sta Barbara: |
Portion of Sonquil (SB-S31W to SB-S31W4) |
|
To relocate secondary pole at SB-S31W |
June 20, 2024 |
Thu |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Portion of Bolasi (SF-101W8) |
|
Replace of rotten primary poles and replacement of suspension insulators |
June 19, 2024 |
Wed |
9:00 an – 12:00 nn |
3 hr |
San Fabian: |
Portion of Anonang (SF-M22W7M to SF-M222W7W2) |
|
To replace the rotten secondary pole and reconductor the 2-span secondary line |
June 18, 2024 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
Sta Barbara: |
Portion of Ventinilla (SB-MB22-W6M) |
|
To relocate secondary poles and conduct massive trimming |
June 18, 2024 |
Tue |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Portion of Bolasi (SF-101W8W15) |
|
Replacement of rotten primary poles and rusted suspension insulators |
June 17, 2024 |
Mon |
9:00 an – 2:00 pm |
5 hr |
Calasiao: |
Portion of Jones St., Poblacion West (C30-002) |
|
To reconductor and convert single phase to three phase secondary line along Jones St. Calasiao |
June 17, 2024 |
Mon |
1:00 pm – 4:00 pm |
3 hr |
Sta Barbara: |
Portion of Ventinilla (SB-MB22-W6M) |
|
To relocate secondary poles and conduct massive trimming |
June 15, 2024 |
Sat |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Portion of Bolasi (SF-101W8W15) |
|
Replacement of rotten primary poles and rusted suspension insulators |
June 15, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Turod-Labney (SJ-Y53W17) |
|
To relocate secondary pole |
June 15, 2024 |
Sat |
8:00 am – 11:00 am |
3 hr |
Dagupan City: |
Portion of Pantal (after PLDT to Sitio Patalan) |
|
Primary line extension and primary line revamp to serve the new customer in the area |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Dinalaoan (Sitio Alegria), Lumbang and portion of Nagsaing (Riverside) |
|
Primary line revamp to improve the safety and reliability of our primary distribution line in the area |
June 14, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Rabon (SFB0091) |
|
Reconductor of bare secondary line of line to ground and to erect concrete pole |
June 14, 2024 |
Fri |
10:00 am – 5:30 am |
30 min |
San Fabian: |
Portion of Nibaliw West (Sea Side) |
|
Primary line revamp to improve the safety and reliability of primary line in the area. Reconductoring primary line from #2 to 2/0. |
5:00 am – 12:00 nn |
7 hr |
June 14, 2024 |
Fri |
5:00 am – 5:30 am |
30 min |
San Fabian: |
Portion of Nibaliw West (Sea Side) |
|
Primary line revamp to improve the safety and reliability of our primary line distribution line in the area |
5:00 am – 12:00 nn |
7 hr |
San Fabian: |
Portion of Nibaliw West (Center Beach) |
|
June 13, 2024 |
Thu |
10:00 am – 3:00 pm |
5 hr |
San Jacinto: |
Portion of Labney (SJ-Y53X6) |
|
Relocation and correction of primary poles from SJ-X53X2 to SJ-X53X5 along Sitio Palawan, Labney, San Jacinto |
June 13, 2024 |
Thu |
1:30 pm – 3:00 pm |
1.5 hr |
Dagupan City: |
Portion of Zamora St. (D15-049) |
|
To replace rusted transformer cut out |
June 11, 2024 |
Tue |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Bolo (SJC-0033MM) |
|
To withdraw primary/secondary line |
June 8, 2024 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Bonuan Gueset
(Tondaligan, Paras Road and lateral road going Purok Pagkakaisa) |
|
Primary line revamp to improve
the safety and reliability of our primary distribution line in
the area |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Lucao (Millora St.) |
|
June 7, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Inmalog Norte (Sitio
Makukuli) and Portion of Bigbiga |
|
Primary line extension and
Primary line revamp to serve the new customers in the area |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Inmalog Sur and
Inmalog Norte |
|
June 7, 2024 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuaan Boquig (D23-177) |
|
Energization and load splitting of secondary line |
June 6, 2024 |
Thu |
5:00 am – 5:15 am |
15 min |
Dagupan City: |
Bacayao Sur, Portion of De
Venecia hi-way up to Alimax Homes, Lasip Chico, Pogo Grande
and Lasip Grande |
Calasiao: |
Portion of Nalsian (Nalsian-Bacayao) |
|
Primary line revamp to improve
the safety and reliability of our primary distribution line in
the area |
6:45 am – 7:00 am |
15 min |
5:00 am – 7:00 am |
2 hr |
|
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Matic-Matic (Core Shelter) |
|
June 7, 2024 |
Fri |
11:00 am – 2:00 pm |
3 hr |
Manaoag: |
Portion of Licsi (M-4010) |
|
Replacement of busted lightning arrester |
June 7, 2024 |
Fri |
9:00 am – 11:00 am |
2 hr |
Manaoag: |
Portion of Baritao (M-5466) |
|
Uprating of distribution transformer from 37.5 kVA to 75 kVA |
June 6, 2024 |
Thu |
5:00 am – 11:00 am |
6 hr |
Dagupan City: |
Portion of Malued (D27-038) |
|
Energization and load splitting |
June 5, 2024 |
Wed |
8:30 am – 3:30 pm |
7 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-203M) |
|
Replace the rotten creosoted pole and reconductor the secondary line with 2/0 ACSR WP |
June 5, 2024 |
Wed |
3:30 pm – 4:00 pm |
30 min |
Sta Barbara: |
Portion of Carusucan (SB-C32M) |
|
Uprating and secondary load splitting |
June 5, 2024 |
Wed |
1:30 pm – 3:30 pm |
2 hr |
Sta Barbara: |
Portion of Carusucan (SB-C35) |
|
Uprating and secondary load splitting |
June 5, 2024 |
Wed |
9:30 am – 3:30 pm |
6 hr |
San Fabian: |
Portion of Inmalog Norte (SFB0356) |
|
To string 7-span primary line extension at Sitio Makukuli, Inmalog Norte |
June 5, 2024 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-448) |
|
To erect mid-span role and tapping of primary line |
June 3, 2024 |
Mon |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Brgy. II and III, Neuva St. (D16-008W to D16-008W2W) |
|
To replace GIPP and reconductoring of existing secondary line with 4/0 ACSR WP |
June 1, 2024 |
Sat |
3:00 pm – 4:30 pm |
1.5 hr |
Calasiao: |
Portion of Ambonao (CSB-24) |
|
Uprating of overloaded distribution transformers |
June 1, 2024 |
Sat |
1:00 pm – 2:30 pm |
1.5 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-203M) |
|
Uprating of overloaded distribution transformers |
June 1, 2024 |
Sat |
10:00 am – 12:00 nn |
2 hr |
Dagupan City: |
Portion of Malued (D27-C9) |
|
Uprating of overloaded distribution transformers |
June 1, 2024 |
Sat |
8:30 am – 10:00 am |
1.5 hr |
Dagupan City: |
Portion of Malued (D27-041W8) |
|
Uprating of overloaded distribution transformers |
June 1, 2024 |
Sat |
8:30 am – 12:00 nn |
3.5 hr |
Dagupan City: |
Portion of Salapingao (Sitio Dupo) (D2-D5) |
|
Trimming of mangroves affecting primary lines |
June 1, 2024 |
Sat |
9:30 am – 2:30 pm |
5 hr |
Dagupan City: |
Portion of Herrero-Perez (D25-005) |
|
To add and additional 2-span 2/0 ACSR cable and bundle it with the existing secondary line, in order to transfer the secondary line to the concrete pole |
June 1, 2024 |
Sat |
8:30 am – 4:00 pm |
7.5 hr |
Dagupan City: |
Portion of Lucao Millora (D24-118) |
|
Primary and secondary line revamp, reconductoring of secondary line |
May 31, 2024 |
Fri |
10:00 am – 12:00 nn |
2 hr |
Dagupan City: |
Portion of Tondaligan, Bonuan Gueset (D23-F9) |
|
Replacement of busted arrester and checking of grounding conductor and rod |
May 31, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Mamatao (SFB-0269) |
|
Transfer source of line to ground transformer at SFB-0260M from Mamatao source to Bisbisocol primary line |
May 31, 2024 |
Fri |
5:00 am – 5:30 am |
30 min |
San Fabian: |
Portion of Nibaliw (Sea Side) |
|
Primary line revamp to improve
the safety and reliability of our primary distribution line in
the area |
11:30 am – 12:00 nn |
30 min |
5:00 am – 12:00 nn |
7 hr |
San Fabian: |
Portion of Nibaliw (Center Beach) |
|
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Ambalangan Dalin
(Sitio Bisbisocol) |
|
Primary line extension to serve the new
customers in the area |
9:30 am – 11:30 am |
2 hr |
Sta. Barbara: |
Portion of Botao (Bautista Road) |
|
Primary line revamp to improve the safety and
reliability of our primary distribution line in the area |
May 30, 2024 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Pantal (Sitio Pantalan) |
|
Primary line extension and primary line
revamp to serve the new customers in the area |
May 29, 2024 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Mabilao (SF-124) |
|
Uprating of 1-25kVA to 1-50kVA transformer and I-Span secondary line extension to serve Melani Rodas |
May 27, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Sta Barbara: |
Portion of Minien East (SB-324) |
|
Relocation and erection of mid span, installation of UPAS and massive trimming |
May 25, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Herrero-Perez (D25-004 to D25-012W5) |
|
Secondary line revamp |
May 25, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Sta Barbara: |
Portion of Maticmatic (SB-256) |
|
Erection of primary pole and line extension |
May 25, 2024 |
Sat |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Hidalgo St., Caranglaan (D14-066W3) |
|
Re-routing of secondary line |
May 25, 2024 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Pantal (D8-F4) |
|
Secondary line revamp |
May 25, 2024 |
Sat |
8:00 am – 5:00 pm |
9 hr |
Sta Barbara: |
Portion of Maticmatic (SB-256) |
|
To install 50kVa distribution transformer and secondary line with line revamp |
May 24, 2024 |
Fri |
8:30 am – 11:30 am |
3 hr |
San Fabian: |
Portion of Sitio Mamatao (SFB0269) |
|
To install sectionalizing cut out at SFB0269 to server the primary line going to Bisbisocol |
May 24, 2024 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Parongking (C29-123M) |
|
Load split of secondary line and replacement of creosoted poles |
May 24, 2024 |
Fri |
11:00 am – 12:00 nn |
1 hr |
Sta Barbara: |
Portion of Leet (SB-LF60W9) |
|
Primary line revamp and primary line conversion to 3 phase to server the application of Torralba Rice Mill |
May 24, 2024 |
Fri |
8:00 am – 4:00 pm |
8 hr |
Sta Barbara: |
Portion of Leet (SB-L1-25) |
|
Transfer of secondary line to new pole |
May 24, 2024 |
Fri |
8:00 am – 5:00 pm |
9 hr |
San Fabian: |
Portion of Ambalangan Dalin (Sitio Bisbisocol) |
|
Primary line extension and primary line revamp to serve the new customers in the area |
May 24, 2024 |
Fri |
5:00 am – 12:00 nn |
7 hr |
Sta Barbara: |
Portion of Leet |
|
Primary line conversion from single phase to three phase to serve the application of Torralba rice mill |
May 23, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Linday, Colisao, Ambalangan Dalin |
|
Primary line revamp to serve the application of R. Chan Crushing Plant |
May 23, 2024 |
Thu |
10:30 am – 11:30 am |
1 hr |
Sta Barbara: |
Portion of Leet and portion of Erfe (Leet road network and Banerle road) |
|
Primary line conversion from single phase to three phase to serve the application of Torralba rice mill |
May 22, 2024 |
Wed |
8:30 am – 2:00 pm |
5.5 hr |
San Fabian: |
Portion of Anonang (SF-M60) |
|
Reconductoring of secondary line and load splitting |
May 22, 2024 |
Wed |
10:30 am – 12:00 nn |
1.5 hr |
Sta Barbara: |
Portion of Minien West (SB-DM-25) |
|
Uprating of transformer from 25kVa to 50kVa due to overloading and under voltage |
May 21, 2024 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Sta Barbara: |
Portion of Villa Sta Barbara (SB-BS1-26) |
|
Reconductoring of secondary lines due to undervoltage |
May 21, 2024 |
Tue |
1:30 pm – 3:00 pm |
1.5 hr |
Sta Barbara: |
Portion of Malanay (SB-M21) |
|
Replacement of oil leak distribution transformer |
May 21, 2024 |
Tue |
9:30 am – 12:00 nn |
2.5 hr |
Sta Barbara: |
Portion of Payas (SB-BF57 and SB-BF62) |
|
Relocation of transformer and secondary load splitting |
May 20, 2024 |
Mon |
10:00 am – 2:00 pm |
7 hr |
Dagupan City: |
Portion of Herrero-Perez (D25-004) |
|
Installation of 1-75kVA and secondary load splitting due to overload/undervoltage |
May 20, 2024 |
Mon |
9:00 am – 4:00 pm |
7 hr |
Manaoag: |
Portion of Lelemaan (M-4842W21) |
|
Uprating of 25kVA distribution transformer to 50kVA distribution transformer. To replace rotten pole and reconductoring secondary line due to low voltage |
May 18, 2024 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Calasiao: |
Portion of Bued (C32-088) |
|
Reconductoring of secondary lines and to replace rotten poles |
May 17, 2024 |
Fri |
5:00 am – 12:00 nn |
7 hr |
Sta Barbara: |
Portion of Leet |
|
Primary line conversion from single phase to three phase to serve the application of Torralba rice mill |
May 17, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
Manaoag: |
Portion of Lelemaan (M-4842W21) |
|
Uprating of 25kVA distribution transformer to 50kVA distribution transformer. To replace rotten pole and reconductoring secondary line due to low voltage |
May 17, 2024 |
Fri |
8:00 am – 4:00 pm |
8 hr |
Sta Barbara: |
Portion of Leet (SB-L11) |
|
Transfer of secondary line to new pole and withdrawal of secondary line |
May 16, 2024 |
Thu |
1:00 pm – 2:30 pm |
1.5 hr |
San Fabian: |
Portion of Tempra Guilig (SF-379) |
|
To replace the busted lightning arrester in SF-379 |
May 16, 2024 |
Thu |
10:00 am – 10:30 am |
30 min |
San Fabian: |
Portion of Nibaliw Vidal (SF-228) |
|
To correct the hotspot at line clamp and stirrup at SF-228 |
May 16, 2024 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Sitio Madriaga, Pantal (MG-5029W7 to MG-5029W10) |
|
Reconductoring of secondary line due to low voltage |
May 16, 2024 |
Thu |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Tondaligan, Bonuan Gueset (D23-097W) |
|
Replacement of rotten poles and reconductoring of existing secondary line |
May 16, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of Macayug (SJ-M15 to SJ-M15W5) |
|
Tapping of primary line extension |
May 15, 2024 |
Wed |
3:00 pm – 4:30 pm |
1.5 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-371W2) |
|
To replace busted lightning arrester at D23-371W2 |
May 15, 2024 |
Wed |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-327W3) |
|
To install sectionalizing cutout at D23-147 |
May 15, 2024 |
Wed |
5:00 am – 10:00 am |
5 hr |
Dagupan City: |
Portion of Zamora St. (D15-051M) |
|
Replacement of primary creosoted pole and uprating of distribution transformer |
May 15, 2024 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Calasiao: |
Portion of Bued (C32-088) |
|
Replacement of rotten poles and reconductoring of existing secondary lines due to low voltage |
May 14, 2024 |
Tue |
1:30 pm – 4:00 pm |
2.5 hr |
San Fabian: |
Portion of Sitio Sungyot, Nibaliw Narvarte (SF-SY4) |
|
Secondary load splitting |
May 14, 2024 |
Tue |
9:00 am – 2:00 pm |
5 hr |
Sta Barbara: |
Portion of Minien West (SB-DM14W13) |
|
Reconductoring the existing secondary line due to low voltage |
May 13, 2024 |
Mon |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Lelemaan (M-4844 to M-4844W6X3) |
|
Uprating of 50kVA distribution transformer with 75kVA distribution transformer and reconductoring of secondary line |
May 11, 2024 |
Sat |
10:00 am – 2:00 pm |
4 hr |
Manaoag: |
Portion of Lelemaan (M-4844 to M-4844W6X3) |
|
Uprating of 50kVA distribution transformer with 75kVA distribution transformer and reconductoring of secondary line |
May 11, 2024 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Sta Barbara: |
Portion of Minien West (Sitio Dammam) (SB-DM14W10) |
|
Reconductoring of secondary line |
May 11, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Baritao (M-5505) |
|
Split secondary jumper at M-5505. Tap secondary line to 50 kVA at M-5509M and transfer of secondary line from M-5510 to M-5509M |
May 11, 2024 |
Sat |
8:00 am – 8:30 am |
30 min |
Sta Barbara: |
Portion of Minien East (SB-266X5 and SB-331) |
|
Reconfiguration of primary line due to house construction and the primary line enclosed within a private lot. To change tap the 75kVA distribution transformer at SB-266X5 |
8:30 am – 3:00 pm |
6.5 hr |
May 10, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of Macayug (SJ-M15) |
|
Tapping of primary line extension |
May 10, 2024 |
Fri |
1:00 pm – 4:30 pm |
3.5 hr |
Calasiao: |
Portion of Buenlag (C35-044) |
|
Installation of 1-50kVA distribution transformer with secondary line revamp to solve undervoltage |
May 10, 2024 |
Fri |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Portion of Binday-Colisao (SF-B10) |
|
Reconducting and stringing of primary pole |
May 9, 2024 |
Thu |
1:30 pm – 3:30 pm |
2 hr |
Sta Barbara: |
Portion of Malanay (SB-M20W3M) |
|
Uprating of overloaded 25kVA distribution transformer to 50 kVA distribution transformer |
May 9, 2024 |
Thu |
10:00 am – 12:00 nn |
2 hr |
Calasiao: |
Portion of Bued (C32-089) |
|
Installation of 1-50kVA distribution transfomer with secondary line revamp to solve undervoltage. Also, to withdraw the existing 1-100kVA distribution transformer |
May 9, 2024 |
Thu |
1:30 pm – 4:00 pm |
2.5 hr |
Manaoag: |
Portion of Leleman (M-4842W21) |
|
Uprating of distribution transformer from 25kVA to 50 kVA distribution transformer |
May 9, 2024 |
Thu |
8:00 am – 4:00 pm |
8 hr |
Sta Barbara: |
Portion of Leet (SB-L1-25) |
|
Transfer of secondary pole to a new location and removal of the secondary line |
May 8, 2024 |
Wed |
1:00 pm – 5:00 pm |
4 hr |
Sta Barbara: |
Portion of Sitio Damang, Minien West (SB-DM14W11) |
|
Installation of 2 distribution transformer with secondary line revamp to solve overloading and low voltage |
May 8, 2024 |
Wed |
1:30 pm – 4:00 pm |
2.5 hr |
Dagupan City: |
Portion of Lucao (D24-152) |
|
Installation of distribution transformer at D24-147 and load split of secondary line at D24-148M |
May 8, 2024 |
Wed |
10:30 am – 12:00 nn |
1.5 hr |
Dagupan City: |
Portion of Perez Blvd.(D24-036) |
|
Replacement of oil leak at D24-036 |
May 8, 2024 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Manaoag: |
Portion of Lipit Norte (M-3561 to M-3566) |
|
Reconducting of existing secondary line and load splitting |
May 7, 2024 |
Tue |
10:00 am – 12:00 nn |
2 hr |
Sta Barbara: |
Portion of Tebag (SB-B2W17) |
|
Withdrawal of distribution transformer |
May 7, 2024 |
Tue |
12:00 nn – 2:00 pm |
2 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-314) |
|
Withdrawal of distribution transformer |
May 7, 2024 |
Tue |
1:00 pm – 2:30 pm |
1.5 hr |
Sta Barbara: |
Portion of Matic Matic and Butao (SB-266X5 and SB-B2W2W2) |
|
Uprating of overloaded distribution transformer |
2:30 pm – 4:00 pm |
1.5 hr |
May 7, 2024 |
Tue |
10:00 am – 11:00 am |
1 hr |
Manaoag: |
Portion of Pantal and Lipit-Norte (M-5029) |
|
Uprating of distribution transformer |
1:00 pm – 2:00 pm |
1 hr |
Manaoag: |
Portion of Pantal and Lipit-Norte (M-3554) |
|
2:00 pm – 4:00 pm |
2 hr |
Manaoag: |
Portion of Pantal and Lipit-Norte (M-3557 and M-3561W) |
|
Uprating and installation of distribution transformer |
May 7, 2024 |
Tue |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Malued (D27-038) |
|
Transfer of secondary line to new pole |
May 6, 2024 |
Mon |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Carael (D1-032) |
|
Relocation of 75kVA distribution transformer from D1-032 to D1-031. Installation of 1-25kVA distribution transformer and load splitting |
May 6, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Carael (D1-013) |
|
Reconfiguration of secondary leads of transformer |
May 4, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Baritao (M-5003) |
|
To isolate transformer at M-5005 and load split the secondary line at M-5003 |
May 4, 2024 |
Sat |
11:00 am – 2:00 pm |
3 hr |
Dagupan City: |
Portion of Lucao (D24-D12) |
|
Uprating of transformer from 25kVA to 50kVA distribution transformer |
May 4, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Lucao (D24-D8) |
|
Installation and load splitting of secondary line |
May 4, 2024 |
Sat |
1:00 pm – 3:00 pm |
2 hr |
Sta Barbara: |
Portion of Minien (SB-328W) |
|
To assist Philcantech pole erection and framing at Sta Barbara area |
May 4, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Sta Barbara: |
Portion of Tebag (SB-295MW) |
|
To assist Philcantech pole erection and framing at Sta Barbara area |
May 4, 2024 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Manaoag: |
Portion of Cabanbanan, Oraan West |
|
Relocation of primary poles due to DPWH road construction |
6:00 am – 9:00 am |
3 hr |
Sta Barbara: |
Portion of Matic-Matic (Core Shelter) |
|
Erection primary pole due to feeder expansion |
May 2, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Malued (D27-038W4M) |
|
Reconductoring of secondary line |
May 2, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Lucao (D24-D9) |
|
Reconductoring of secondary lineq |
April 30, 2024 |
Tue |
3:45 am – 4:00 am |
15 min |
San Jacinto: |
All areas |
Manaoag: |
All areas |
|
NGCP's emergency interruption of NGCP Mangaldan – San Jacinto 69kV line due to hotspot correction of NGCP 69kV Air Break Switch (ABS) at Guilig, Mangaldan |
5:30 am – 5:45 am |
15 min |
April 27, 2024 |
Sat |
5:30 am – 6:00 am |
30 min |
San Jacinto: |
All areas |
Manaoag: |
All areas |
|
NGCP's emergency power shifting of DECORP San Jacinto substation and CENPELCO Guilig substation from NGCP – San Manuel substation to NGCP – Balingueo substation via the DECORP-owned 69kV line due to overloading of NGCP – San Manuel – Calasiao 69kV line |
April 27, 2024 |
Sat |
8:30 am – 3:30 pm |
7 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-265) |
|
Installation of distribution transformer and reconductoring of existing secondary line |
April 26, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Sta Barbara: |
Portion of Banaoang (SB-249) |
|
Reconfigure P-2 assembly at SB-249 to improve work clearances due to the erection of a new pole adjacent to the existing transfomer pole |
April 25, 2024 |
Thu |
8:00 am – 4:00 pm |
8 hr |
Sta Barbara: |
Portion of Leet (SB-L1-25) |
|
To transfer secondary line to the new pole |
April 24, 2024 |
Wed |
10:00 am – 12:00 nn |
2 hr |
Calasiao: |
Portion of Poblacion West (C29-085M) |
|
To transfer load of 75kVA distribution transformer to 100kVA distribution transformer at C29-085M |
April 24, 2024 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of San Ramon (M-5535) |
|
Installation and uprating of transformer with secondary line revamp |
April 23, 2024 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Mamalingding (D12-199) |
|
Relocation of a 2-span secondary line and rerouting of the secondary line |
April 22, 2024 |
Mon |
9:00 am – 10:30 am |
1.5 hr |
Calasiao: |
Portion of Songkoy (C35-S11W10) |
|
Uprating of overloaded distribution transformer and oil leak. |
April 21, 2024 |
Sun |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Licsi (M-4016) |
|
Installation of distribution transformer and reconductoring of secondary line |
April 20, 2024 |
Sat |
5:45 am – 5:15 am |
15 min |
Calasiao: |
Portion of San Miguel (Mac Arthuhr Highway) and portion of Nalsian (Nalsian-Bacayao) |
|
Upgrading of line facilities due to the road elevation project by DPWH |
9:45 am – 10:00 am |
15 min |
Dagupan City: |
Portion of De Venecia Highway, Lasip Chico and Brgy. Malued |
|
5:00 am – 10:00 am |
5 hr |
Dagupan City: |
Lasip Grande and Pogo Grande |
|
April 20, 2024 |
Sat |
9:00 am – 1:00 pm |
4 hr |
Calasiao: |
Portion of Buenlag (C35-016) |
|
Installation of distribution transformer and relocation of secondary line to new pole |
April 20, 2024 |
Sat |
9:00 am – 3:00 pm |
6 hr |
Sta Barbara: |
Portion of Dalongue (SB-D23) |
|
Installation of distribution transformer and reconductoring of secondary line |
April 19, 2024 |
Fri |
10:00 am – 3:00 pm |
5 hr |
April 19, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Bolasi (SF-101W10W3 to SF-101W10W4W5) |
|
Secondary line maintenance |
April 18, 2024 |
Thu |
6:00 am – 12:00 nn |
6 hr |
San Carlos: |
Portion of Bolingit (Sitio Estanquero, SC-045) |
|
Relocation of 3 primary poles due to drainage construction at Brgy. Bolingit |
April 18, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Sta Barbara: |
Portion of Leet (Leet East) |
|
Upgrading of line facilities due to the new application of Torralba Ricemill |
April 15, 2024 |
Mon |
10:30 am – 12:00 nn |
1.5 hr |
Manaoag: |
Portion of Calaocan (M-3110) |
|
Replacement of an oil-leaked distribution transformer in Camp Tito Abat |
April 13, 2024 |
Sat |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Poriton of Amada-Tapuac (D24-S3W2W) |
|
Replacement of rotten pole at Amado St. |
April 13, 2024 |
Sat |
3:45 am – 4:00 am |
15 min |
Dagupan City: |
Barangay II (Nueva) - (Galvan St. and CSI Square), Herrero (from cor. A.B. Fernandez Ave. to cor. Perez Blvd.), Pantal (PMC and from Nable St. to Pantal Bridge) and Barangay I (T. Bugallon) - (A.B. Fernandez Ave., Star Plaza and Value Star Inn) |
|
Primary line maintenance |
April 12, 2024 – April 13, 2024 |
Fri – Sat |
10:00 pm – 4:00 am |
6 hr |
Dagupan City: |
Barangay II (Nueva) - (Galvan St. and CSI Square) |
|
Reconductoring of primary line due to the road construction project in Galvan St. |
April 12, 2024 |
Fri |
2:00 pm – 4:00 pm |
2 hr |
Sta Barbara: |
Portion of Minien West (SB-DM5XW2 to SB-DM5XW5) |
|
Secondary line maintenance |
April 12, 2024 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Cabanbanan (M-4055M to M-4055MW5M2) |
|
Secondary line maintenance |
April 12, 2024 |
Fri |
10:00 pm – 10:15 pm |
15 min |
Dagupan City: |
Barangay II (Nueva) - (Galvan St. and CSI Square), Herrero (from cor. A.B. Fernandez Ave. to cor. Perez Blvd.), Pantal (PMC and from Nable St. to Pantal Bridge) and Barangay I (T. Bugallon) - (A.B. Fernandez Ave., Star Plaza and Value Star Inn) |
|
Primary line maintenance |
April 12, 2024 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Cabanbanan (Alonzaga St.) |
|
April 12, 2024 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Sta. Maria St., Bonuan Boquig (from Lorenzo Store going to Bonuan Longos) |
|
Relocation of primary pole to lot boundary of Bonuan Boquig and Bonuan Longos |
April 11, 2024 |
Thu |
9:00 am – 5:00 pm |
8 hr |
Sta Barbara: |
Portion of Leet (Leet East) |
|
Primary line maintenance |
April 11, 2024 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Mayombo (Pag-ibig Subd., Arzadon Subd., and Villaflor Old Bldg.) |
|
April 11, 2024 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Mayombo (D20-F1) |
|
Secondary line maintenance |
April 8, 2024 |
Mon |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-008) |
|
Secondary line maintenance |
April 6, 2024 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Mayombo (D20-F12) |
|
Secondary line maintenance |
April 6, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Sta Barbara: |
Portion of Botao (SB-B16W4) |
|
Secondary line maintenance |
April 6, 2024 |
Sat |
5:30 am – 6:00 am |
30 min |
|
Primary line maintenance |
6:00 pm – 6:30 pm |
30 min |
April 4, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Mayombo (D20-F11 to D20-F13W5) |
|
Secondary line maintenance |
April 3, 2024 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Sta Barbara: |
Portion of Sonquil (SB-S38 to SB-S46) |
|
Secondary line maintenance |
April 2, 2024 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Mayombo (D20-F11 to D20-F13W5) |
|
Secondary line maintenance |
April 2, 2024 |
Tue |
9:00 am – 2:00 pm |
5 hr |
Manaoag: |
Portion of Cabanbanan (M-4055MW5) |
|
Secondary line maintenance |
April 2, 2024 |
Tue |
9:00 am – 3:30 pm |
6.5 hr |
Sta Barbara: |
Portion of Sonquil (SB-S38) |
|
Secondary line maintenance |
March 27, 2024 |
Wed |
10:30 am – 12:00 nn |
1.5 hr |
Manaoag: |
Portion of Babasit (M2007 to M-2012) and (M-2015 to M-2014) |
|
Secondary line maintenance |
9:00 am – 10:30 am |
1.5 hr |
March 22, 2024 |
Fri |
1:00 pm – 3:00 pm |
2 hr |
San Fabian: |
Portion of Lipit-Tomeeng (SF-BM28W9) |
|
Secondary line maintenance |
March 22, 2024 |
Fri |
10:00 am – 2:00 pm |
4 hr |
Sta Barbara: |
Portion of Banaoang (SB-221) |
|
Secondary line maintenance |
March 22, 2024 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Pogo Grande - from Emma's Cake Bakeshop to 113 Purok Sagur (D15-042) |
|
Primary line maintenance |
March 20, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Oraan West (MG-5757-2) |
|
Secondary line maintenance |
March 20, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Tuliao (SB-018X27) |
|
Secondary line maintenance |
March 19, 2024 |
Tue |
3:00 pm – 4:30 pm |
1.5 hr |
Dagupan City: |
Portion of Malued (D27-030) |
|
Secondary line maintenance |
March 19, 2024 |
Tue |
1:30 pm – 3:00 pm |
1.5 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-405) |
|
Secondary line maintenance |
March 19, 2024 |
Tue |
10:30 am – 12:00 nn |
1.5 hr |
Dagupan City: |
Portion of Perez Blvd. (D24-032) |
|
Secondary line maintenance |
March 18, 2024 |
Mon |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Lipit Tomeeng (SFB0446) |
|
Secondary line maintenance |
March 18, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. (D21-081M) |
|
Secondary line maintenance |
March 18, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Licsi (M-4022) |
|
Secondary line maintenance |
March 15, 2024 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Anonang (CSF-120 to CSF-120W6) |
|
Secondary line maintenance |
March 14, 2024 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Manaoag: |
Portion of Lipit Sur (Lipit-Pugaro) |
|
Primary line maintenance |
March 13, 2024 |
Wed |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Bonuan Gueset (Blue Beach Subdivision) |
|
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Nibaliw Narvarte (Sitio Sungyot) |
|
March 12, 2024 |
Tue |
11:00 am – 3:00 pm |
4 hr |
San Fabian: |
Portion of Bigbiga (SFB0173 to SFB0176) |
|
Secondary line maintenance |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Gumot (SFB0018 to SFB0036) |
|
March 9, 2024 |
Sat |
6:00 am – 12:00 nn |
6 hr |
San Fabian: |
Sobol and Tempra-Guilig |
|
Primary line maintenance |
11:00 am – 12:00 nn |
1 hr |
5:00 am – 12:00 nn |
7 hr |
San Fabian: |
Portion of Tocok, Bolasi,
Mabilao, Lipit-Tomeeng, Alacan, Tiblong, Rabon, Bigbiga,
Bolaoen, Inmalong Norte, Inmalong Sur, Ambalangan-Dalin (Sitio
Bisbisucol) and Gumot |
|
March 9, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Bolaoen (SFB008 to SFB002) |
|
Secondary line maintenance |
March 8, 2024 |
Fri |
10:00 am – 2:00 pm |
4 hr |
San Fabian: |
Portion of Bigbiga (SFB0190) |
|
Secondary line maintenance |
March 8, 2024 |
Fri |
8:30 am – 12:00 nn |
3.5 hr |
Sta Barbara: |
Portion of Minien West (Villa) (SB-BS1-26) |
|
Secondary line maintenance |
March 7, 2024 |
Thu |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Pogo Grande (D26-022) |
|
Secondary line maintenance |
March 7, 2024 |
Thu |
10:00 am – 12:00 am |
2 hr |
Dagupan City: |
Portion of Lasip Chico (D28-003) |
|
Secondary line maintenance |
March 7, 2024 |
Thu |
9:00 am – 11:00 am |
2 hr |
Manaoag: |
Portion of Nalsian (M-4041) |
|
Secondary line maintenance |
March 6, 2024 |
Wed |
1:30 pm – 3:00 pm |
1.5 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-109, D23-104W) |
|
Secondary line maintenance |
3:00 pm – 4:30 pm |
1.5 hr |
March 6, 2024 |
Wed |
10:00 am – 3:00 pm |
5 hr |
Manaoag: |
Portion of Sapang (M-3027-W15-M) |
|
Secondary line maintenance |
March 6, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Sta Barbara: |
Portion of Alibago (SB-057W50 to SB-057W52) |
|
Secondary line maintenance |
March 5, 2024 |
Tue |
9:30 am – 1:30 pm |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-004 to D23-008) and (D23-046MW6) |
|
Secondary line maintenance |
2:00 pm – 4:00 pm |
2 hr |
March 5, 2024 |
Tue |
1:30 pm – 3:00 pm |
1.5 hr |
Manaoag: |
Portion of Licsi (M-4024) |
|
Secondary line maintenance |
March 5, 2024 |
Tue |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Bonuan Blue Beach Subdivision, Bonuan Gueset (D23-357 to D23-104) |
|
Secondary line maintenance |
March 5, 2024 |
Tue |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Bonuan Gueset (Blue
Beach Subdivision) |
|
Primary line maintenance |
March 4, 2024 |
Mon |
10:00 am – 3:00 pm |
5 hr |
San Fabian: |
Portion of Tempra Guilig (SF-044) |
|
Secondary line maintenance |
10:00 am – 2:00 pm |
4 hr |
San Fabian: |
Portion of Bigbiga (SFB0173) |
|
March 2, 2024 |
Sat |
6:00 am – 6:15 am |
15 min |
Calasiao: |
Portion of San Miguel and Nalsian |
Dagupan City: |
Lasip Grande, Pogo Grande, Lasip
Chico, Pogo Chico, Malued, Burgos St., Zamora St., Zamora
Ext., Rivera St., Gomez St., Jovellanos St., Guilig St.,
Portion of A.B. Fernandez West and Perez Blvd. |
|
Primary line maintenance |
9:45 am – 10:00 am |
15 min |
6:00 am – 10:00 am |
4 hr |
Dagupan City: |
Bacayao Sur |
|
March 1, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
|
Primary line maintenance |
February 29, 2024 |
Thu |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of Lucao (D24-136) |
|
Secondary line maintenance |
10:00 am – 12:30 pm |
2.5 hr |
Dagupan City: |
Portion of Salapingao (D2-S7M
and D2-S7W5) |
|
1:00 pm – 5:00 pm |
4 hr |
February 29, 2024 |
Thu |
9:00 am – 2:00 pm |
5 hr |
San Fabian: |
Portion of Aramal (SF-ML13) |
|
Secondary line maintenance |
February 28, 2024 |
Wed |
8:30 am – 12:30 pm |
4 hr |
Calasiao: |
Portion of Quesban (C32-053MW to
C32-053W6) |
|
Secondary line maintenance |
February 27, 2024 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Banaoang (C33-010) |
|
Secondary line maintenance |
February 26, 2024 |
Mon |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Alibago (SB-019W14) |
|
Secondary line maintenance |
February 26, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. (D21-086) |
|
Secondary line maintenance |
February 26, 2024 |
Mon |
9:00 am – 11:00 pm |
2 hr |
Dagupan City: |
Portion of Bonuan Gueset (Blue
Beach Subdivision)(D23-104X2 to D23-102) |
|
Secondary line maintenance |
February 24, 2024 |
Sat |
1:00 pm – 5:00 pm |
4 hr |
Sta. Barbara: |
Portion of Poblacion Norte (SB-063) |
|
Secondary line maintenance |
February 24, 2024 |
Tue |
8:30 am – 4:30 pm |
7 hr |
Calasiao: |
Portion of Alibago (C32-057W73) |
|
Secondary line maintenance |
February 24, 2024 |
Sat |
5:30 am – 6:00 am |
30 min |
San Jacinto: |
All areas |
Manaoag |
All areas |
|
Shifting of feeders serving San Jacinto and
Manaoag areas from San Jacinto S/S to San Fabian S/S through
tie-feeders due to NGCP's prevetive maintenance of San
Manuel-Calasiao subtransmission line |
6:00 pm – 6:30 pm |
30 min |
San Jacinto: |
All areas |
Manaoag |
All areas |
|
Normalization of feeder loads at San Jacinto S/S |
February 23, 2024 |
Fri |
10:00 am – 3:00 pm |
5 hr |
Sta. Barbara: |
Portion of Tebag (SB-285W) |
|
Secondary line maintenance |
February 22, 2024 |
Thu |
8:30 am – 3:30 pm |
7 hr |
San Fabian: |
Portion of Cayanga (SF-001W4) |
|
Secondary line maintenance |
February 22, 2024 |
Thu |
8:30 am – 3:30 pm |
7 hr |
San Fabian: |
Portion of Angio (SF-512MY) |
|
Secondary line maintenance |
February 22, 2024 |
Thu |
8:30 am – 3:30 pm |
7 hr |
San Fabian: |
Portion of Angip (Angio Express Way) |
|
Primary line maintenance |
8:45 am – 9:00 am |
15 min |
San Fabian: |
Portion of Anonang |
|
February 21, 2024 |
Wed |
10:00 am – 2:00 pm |
4 hr |
Sta. Barbara: |
Portion of Payas (SB-BF81 to SB-BF81W2) |
|
Secondary line maintenance |
February 21, 2024 |
Wed |
6:00 am – 12:00 nn |
6 hr |
San Fabian: |
Longos-Amangonan-Parac-Parac |
|
Primary line maintenance |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Colisao and Portion of
Ambalangan-Dalin (Sitio Mamatao) |
|
February 17, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Sapang (M-3027 and M-2032) |
|
Secondary line maintenance |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Tapuac (D24-097) |
|
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Pugaro (D2-F3W2W3) |
|
February 16, 2024 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Calasiao: |
Portion of Longos (Sitio Cabaruan) |
|
Primary line maintenance |
9:00 am – 4:00 pm |
7 hr |
Manaoag: |
Portion of Calaocan (Camp Tito Abat) |
|
February 16, 2024 |
Fri |
8:30 am – 12:00 nn |
3.5 hr |
San Fabian: |
Portion of Cayanga (DSF233) |
|
Secondary line maintenance |
February 15, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Manaoag: |
Portion of Calaoacan (Camp Tito Abat) (M-3004) |
|
Primary line maintenance |
February 15, 2024 |
Thu |
1:30 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-045) |
|
Secondary line maintenance |
February 14, 2024 |
Wed |
9:30 am – 1:30 pm |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-005 to D23-005W4) |
|
Secondary line maintenance |
February 9, 2024 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Calasiao: |
Portion of San Vicente and Banaoang |
|
Primary line maintenance |
February 8, 2024 |
Thu |
9:00 am – 4:00 pm |
7 hr |
|
Primary line maintenance |
February 8, 2024 |
Thu |
6:00 am – 9:00 am |
3 hr |
Manaoag: |
Portion of Llamido St. Poblacion (M-1124) |
|
Secondary line maintenance |
February 3, 2024 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Poblacion Norte and Dalongue |
|
Primary line maintenance |
February 3, 2024 |
Sat |
6:00 am – 9:00 am |
3 hr |
Dagupan City: |
Portion of Arellano (D21-078W) |
|
Secondary line maintenance |
February 2, 2024 |
Fri |
8:00 am – 3:00 pm |
7 hr |
Dagupan City: |
Portion of Tapuac (D24-098) |
|
Secondary line maintenance |
February 1, 2024 |
Thu |
1:30 pm – 2:30 pm |
1 hr |
Sta. Barbara: |
Portion of Minien (SB-MS1-MW2) |
|
Secondary line maintenance |
11:00 am – 12:00 nn |
1 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB70) |
|
11:00 am – 12:00 nn |
1 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB70) |
|
January 31, 2024 |
Wed |
1:00 pm – 5:00 pm |
4 hr |
San Jacinto: |
Portion of Sto.Tomas (Sitio Macayug and Sitio Baybay) |
|
Primary line maintenance |
January 31, 2024 |
Wed |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of Tondaligan (D23-F8) |
|
Secondary line maintenance |
January 30, 2024 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
Calasiao: |
Portion of San Miguel (C29-073) |
|
Secondary line maintenance |
January 30, 2024 |
Tue |
8:30 am – 4:30 pm |
8 hr |
Dagupan City: |
Portion of Caranglaan (D19-B10) |
|
Secondary line maintenance |
January 29, 2024 |
Mon |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Colisao (SFB0307) |
|
Secondary line maintenance |
January 27, 2024 |
Sat |
8:00 am – 4:00 pm |
8 hr |
San Fabian: |
Portion of Cayanga (BSF-149) |
|
Secondary line maintenance |
January 27, 2024 |
Sat |
8:30 am – 2:30 pm |
6 hr |
Dagupan City: |
Mangin (D12-073) |
|
Secondary line maintenance |
January 26, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of Bolo (SJ-Y66X11 to SJ0033) |
|
Secondary line maintenance |
January 26, 2024 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Mangin (D12-073) |
|
Primary line maintenance |
January 25, 2024 |
Thu |
7:00 am – 7:30 pm |
30 min |
San Fabian: |
Longos-Amangonan-Parac-Parac |
|
Primary line maintenance |
11:30 am – 12:00 nn |
30 min |
7:00 am – 12:00 nn |
5 hr |
San Fabian: |
Portion of Longos-Proper |
|
7:00 am – 12:00 nn |
5 hr |
San Fabian: |
Portion of Longos-Proper |
|
January 25, 2024 |
Thu |
9:30 am – 3:30 pm |
6 hr |
San Jacinto: |
Portion of Sta.Maria (SJ-189M) |
|
Secondary line maintenance |
January 25, 2024 |
Thu |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Cayanga (BSF-149) |
|
Secondary line maintenance |
January 24, 2024 |
Wed |
4:00 am – 10:00 am |
6 hr |
Dagupan City: |
Portion of Arellano St. (D21-078) |
|
Secondary line maintenance |
January 24, 2024 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Lipit Norte (M-3706MW2 to M-3706MW3) |
|
Secondary line maintenance |
January 24, 2024 |
Wed |
1:00 pm – 5:00 pm |
4 hr |
San Carlos: |
Portion of Bolingit (SC-035W11) |
|
Secondary line maintenance |
January 24, 2024 |
Wed |
8:00 am – 5:00 pm |
9 hr |
Calasiao: |
Portion of San Miguel (C32-013X4) |
|
Secondary line maintenance |
January 23, 2024 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
Calasiao: |
Portion of San Miguel (C32-013X4) |
|
Secondary line maintenance |
January 22, 2024 |
Mon |
1:00 pm – 5:00 pm |
4 hr |
San Carlos: |
Portion of Bolingit (SC-035W11) |
|
Secondary line maintenance |
January 22, 2024 |
Mon |
1:00 pm – 5:00 pm |
4 hr |
Calasiao: |
Portion of Buenlag (C35-029) |
|
Secondary line maintenance |
January 21, 2024 |
Sun |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Caranglaan (D19-S4W to D19-S4) |
|
Secondary line maintenance |
January 21, 2024 |
Sun |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Songkoy (C35-S7W2 and C35-S7W7) |
|
Secondary line maintenance |
1:00 pm – 4:00 pm |
3 hr |
Calasiao: |
Portion of Songkoy (C35-S7W2 and C35-S7W7) |
|
January 20, 2024 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Arellano St. (DD-25 and DD-21) |
|
Secondary line maintenance |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Arellano St. (DD-25 and DD-21) |
|
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Arellano St. (DD-019 and DD-020) |
|
1:00 pm – 5:00 pm |
4 hr |
Dagupan City: |
Portion of Arellano St. (DD-019 and DD-020) |
|
January 20, 2024 |
Sat |
10:00 am – 12:00 nn |
2 hr |
Calasiao: |
Portion of San Vicente (C33-026W) |
|
Secondary line maintenance |
January 19, 2024 |
Fri |
9:00 am – 4:00 pm |
7 hr |
Dagupan: City: |
Portion of Arellano St. (D21-086) |
|
Secondary line maintenance |
9:00 am – 3:00 pm |
6 hr |
Dagupan: City: |
Portion of Arellano St. (DD-018) |
|
January 18, 2024 |
Thu |
4:00 am – 4:15 am |
15 min |
Dagupan: City: |
Portion of AB Fernandez Ave., Fernandez St., Rizal St., portion of Rivera St., AB Fernandez East, portion of M.H. Del Pilar and portion of Arellano (from Jollibee Junction to Bank of Makati) |
|
Primary line maintenance |
9:45 am – 10:00 am |
15 min |
4:00 am – 5:00 am |
1 hr |
Dagupan City: |
Portion of Pantal (Pantal-Guibang and corner De Venecia Highway Extension-Dawel), portion of Bonuan Gueset, Bonuan Binloc and Bonuan Boquig |
|
4:00 am – 10:00 am |
6 hr |
Dagupan City: |
Portion of Arellano St. (from Bank of Makati to Silverio's restaurant) |
|
January 17, 2024 |
Wed |
10:00 am – 11:00 am |
1 hr |
Manaoag: |
Bisal, Bucao, Babasit, Poblacion, Pugaro, Calaocan, Sapang, Pao, Lipit Sur and Lipit Norte |
|
Primary line maintenance |
January 17, 2024 |
Wed |
1:30 pm – 4:30 pm |
3 hr |
Dagupan City: |
Portion of Arellano St. (DD-031) |
|
Secondary line maintenance |
January 17, 2024 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Leet (SB-L2-35) |
|
Secondary line maintenance |
January 13, 2024 |
Sat |
4:00 am – 4:15 am |
15 min |
Dagupan City: |
Portion of AB Fernandez Ave., Fernandez St., Rizal St., portion of Rivera St., AB Fernandez East, portion of M.H. Del Pilar and portion of Arellano (from Jollibee Junction to Bank of Makati) |
|
Primary line maintenance |
9:45 am – 10:00 am |
15 min |
4:00 am – 5:00 am |
1 hr |
Dagupan City: |
Portion of Pantal (Pantal Guibang and corner De Venecia Highway Extension-Dawel), portion of Bonuan Gueset, Bonuan Binloc and Bonuan Boquig |
|
4:00 am – 10:00 am |
6 hr |
Dagupan City: |
Portion of Arellano St. (from Bank of Makati to Silverio's Restaurant, DD-021) |
|
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Binday (Lateral road going to Roheim Resort) and portion of Colisao (SF-B10W) |
|
January 12, 2024 |
Fri |
10:00 am – 4:00 pm |
6 hr |
Dagupan City: |
Portion of Arellano St. (DD-14) |
|
Secondary line maintenance |
January 12, 2024 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Arellano St. (DD-011) |
|
Secondary line maintenance |
January 11, 2024 |
Thu |
8:30 am – 4:30 pm |
8 hr |
Dagupan City: |
Portion of Salisay (D12-229 to D12-231) and (D12-230 to D12-231W4) |
|
Secondary line maintenance |
January 11, 2024 |
Thu |
4:00 am – 10:00 am |
6 hr |
Dagupan City: |
Portion of Arellano St. (from Asian United Bank to Solid North Bus Terminal, DD-010) |
|
Primary line maintenance |
4:00 am – 4:15 am |
15 min |
Dagupan City: |
Portion of AB Fernandez Ave., Fernandez St., Rizal St., portion of Rivera St., AB Fernandez East, portion of M.H. Del Pilar and portion of Arellano (from Jollibee Junction to Asian United Bank) |
|
9:45 am – 10:00 am |
15 min |
January 10, 2024 |
Wed |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Inmalog Norte (SF-IN9W2) |
|
Primary line maintenance |
January 5, 2024 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Poblacion (Manaoag National High School) and Pugaro |
|
Primary line maintenance |
January 4, 2024 |
Thu |
9:30 am – 12:00 nn |
2.5 hr |
Dagupan City: |
Portion of Rizal Extension (D24-012) and Salisay (D12-215MW5) |
|
Secondary line maintenance |
1:30 pm – 3:30 pm |
2 hr |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of Labney, Estaris (SJ-S33 to SJ-S48) |
|
January 3, 2024 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Banaoang (CD-020) |
|
Secondary line maintenance |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-249) |
|
December 29, 2023 |
Fri |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Caranglaan (D19-S4) |
|
Secondary line maintenance |
December 28, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Sagud Bhaley (SF-174W2) |
|
Secondary line maintenance |
December 22, 2023 |
Fri |
10:00 am – 2:00 am |
4 hr |
Dagupan City: |
Portion of Tapuac (D24-174W) |
|
Secondary line maintenance |
December 22, 2023 |
Fri |
5:00 am – 9:00 am |
4 hr |
Dagupan City: |
Portion of Arellano St. (DD-010) (Pag-asa Village and DITO Telecommunity Inc.) |
|
Primary line maintenance |
December 18, 2023 |
Mon |
8:00 am – 4:00 pm |
8 hr |
Calasiao: |
Portion of MerryLand Subdivision, Buenlag (C35-ML4 to C35-ML4W4) |
|
Secondary line maintenance |
December 16, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Macayug (SJ-M15W5) |
|
Secondary line maintenance |
December 15, 2023 |
Fri |
1:00 pm – 4:00 pm |
3 hr |
Calasiao: |
Portion of Bued (C32-161W) |
|
Secondary line maintenance |
December 15, 2023 |
Fri |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Portion of Bolaoen and Gumot |
|
Primary line maintenance |
December 14, 2023 |
Thu |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Arellano St. (DD-09 and D21-011) |
|
Secondary line maintenance |
5:00 am – 8:00 am |
3 hr |
Dagupan City: |
Portion of Arellano St. (D21-011) |
|
8:00 am – 11:00 am |
3 hr |
Dagupan City: |
Portion of Arellano St. (D21-003) |
|
December 14, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Pao (M-3324) |
|
Secondary line maintenance |
8:30 am – 4:30 pm |
8 hr |
San Fabian:  |
Portion of Bolaoen (SF-BL1W29) |
|
December 13, 2023 |
Wed |
11:00 am – 5:00 pm |
6 hr |
Dagupan City: |
Portion of Arellano St. (DD-007) |
|
Secondary line maintenance |
2:00 pm – 5:00 pm |
3 hr |
Dagupan City: |
Portion of Arellano St. (D21-002) |
|
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Buenlag (Green Ville
Subdivision) (C35-055M) |
|
December 11, 2023 |
Mon |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-401X12) |
|
Secondary line maintenance |
December 7, 2023 |
Thu |
8:30 am – 12:00 nn |
3.5 hr |
Manaoag: |
Portion of Baloking Poblacion (M-2054W3) |
|
Secondary line maintenance |
December 1, 2023 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano Bani (D22-001) |
|
Secondary line maintenance |
8:00 am – 4:00 pm |
8 hr |
Calasiao: |
Portion of Buenlag (Merryland C35-ML4 to C35-ML4W4) |
|
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB34), Tebag (SB-B2) and Matic-matic (SB-CS16W6) |
|
8:00 am – 5:00 pm |
9 hr |
Calasiao: |
Portion of San Miguel (C29-116W3) |
|
November 30, 2023 |
Thu |
8:00 am – 5:00 pm |
9 hr |
San Fabian: |
Portion of Lipit Tomeeng (SF-BM15M) |
|
Secondary line maintenance |
8:00 am – 5:00 pm |
9 hr |
Manaoag: |
Portion of Lipit Sur (M-3537) |
|
8:00 am – 5:00 pm |
9 hr |
San Jacinto: |
Portion of San Jose (SJ-095) |
|
1:00 pm – 5:00 pm |
4 hr |
Dagupan City: |
Portion of Sitio Calima, Pantal (D21-087X19) |
|
November 29, 2023 |
Wed |
8:00 am – 5:00 pm |
8 hr |
Sta. Barbara: |
Portion of Banzal (SB-LF9 to SB-LF6 and SB-LF27) |
|
Secondary line maintenance |
8:00 am – 5:00 pm |
8 hr |
Sta. Barbara: |
Portion of Leet (SB-LF60W31 and SB-L3-20) |
|
9:00 am – 3:00 pm |
6 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB34) |
|
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Baritao (M-5430W17 to M-5430W24) and (M-5430W12X18) |
|
7:00 am – 5:00 pm |
10 hr |
Dagupan City: |
Portion of Lasip Chico (CD-019X5), Old De Venecia Highway (CD-042-5), Lucao Dist. (D24-096), Tapuac (D24-077W), Pogo Chico (D24-012), Bolosan (D12-180M) |
|
November 25, 2023 |
Sat |
8:30 am – 4:30 pm |
8 hr |
|
Primary line maintenance |
1:30 pm – 4:30 pm |
3 hr |
Manaoag: |
Portion of Baritao (Sitio Sagor) |
|
November 24, 2023 |
Fri |
8:00 am – 5:00 pm |
8 hr |
Calasiao: |
Portion of San Miguel (C29-045-10 and C29-116W3), Gabon (C32-019X3), Talibaew (C34-019M), Mancup (C34-035) |
|
Secondary line maintenance |
November 24, 2023 |
Fri |
1:00 am – 1:15 am |
15 min |
Dagupan City: |
Portion of AB Fernandez Ave., Fernandez St., Rizal St., portion of Rivera St. and AB Fernandez East |
|
Primary line maintenance |
6:45 am – 7:00 am |
15 min |
1:00 am – 7:00 am |
6 hr |
Dagupan City: |
Portion of M.H. Del Pilar and portion of Arellano St. (from Jollibee Junction to Solid North Bus Terminal) |
|
November 23, 2023 |
Thu |
8:00 am – 5:00 pm |
8 hr |
Calasiao: |
Portion of Dinalaoan (C33-106), Malabago (C32-067), Songkoy (C34-C12), Buenlag (C35-032W7 to C35-032W12) |
|
Secondary line maintenance |
November 23, 2023 |
Thu |
9:00 am – 1:00 pm |
4 hr |
Manaoag: |
Portion of Pugaro (M-2477) |
|
Secondary line maintenance |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Pao (M-3307W9) |
|
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Inamotan (M-42W2) |
|
November 22, 2023 |
Fri |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Caranglaan (Villaflor Hospital), portion of Mayombo (BHF Mall and City Mall) |
|
Primary line maintenance |
6:00 am – 8:00 am |
2 hr |
Dagupan City: |
Portion of Arellano St. (Region 1 Medical Center, Nepo Mall and UDD) |
|
November 20, 2023 |
Mon |
1:00 pm – 4:30 pm |
3.5 hr |
Calasiao: |
Portion of Bued (CSB-76) |
|
Secondary line maintenance |
November 20, 2023 |
Mon |
9:00 am – 3:00 pm |
3 hr |
Dagupan City: |
Portion of Gomez St. (D15-023W) |
|
Secondary line maintenance |
November 18, 2023 |
Sat |
6:00 am – 10:00 am |
4 hr |
Dagupan City: |
Portion of Arellano St. (D21-078) |
|
Secondary line maintenance |
November 17, 2023 |
Fri |
1:00 am – 4:00 am |
3 hr |
Dagupan City: |
Portion of Arellano St. (DD-015) |
|
Secondary line maintenance |
6:00 am – 9:00 am |
3 hr |
Dagupan City: |
Portion of Arellano St. (DD-010) |
|
November 17, 2023 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Lipit-Tomeeng, portion of Inmalog Sur and portion of Ambalangan-Dalin (Sitio Mamatao and Bisbisucol) |
|
Primary line maintenance |
November 13, 2023 |
Mon |
10:00 am – 2:00 pm |
4 hr |
Calasiao: |
Portion of San Vicente (C33-025) |
|
Secondary line maintenance |
November 11, 2023 |
Sat |
10:00 am – 2:00 pm |
4 hr |
San Fabian: |
Portion of Sabangan (SF-243) |
|
Secondary line maintenance |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (D21-057) |
|
November 10, 2023 |
Fri |
8:30 am – 4:30 pm |
8 hr |
|
Primary line maintenance |
November 9, 2023 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Arellano St. (D21-087) |
|
Secondary line maintenance |
November 8, 2023 |
Wed |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (Zarate Subdivision) |
|
Primary line maintenance |
November 4, 2023 |
Sat |
8:00 am – 5:00 pm |
8 hr |
Dagupan City: |
Portion of Arellano St. (D21-077) |
|
Secondary line maintenance |
November 7, 2023 |
Tue |
9:30 am – 4:00 pm |
6.5 hr |
Dagupan City: |
Portion of Arellano St. (DD-018) |
|
Secondary line maintenance |
November 7, 2023 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Arellano St. (D21-078) |
|
Secondary line maintenance |
November 4, 2023 |
Sat |
8:30 am – 12:00 nn |
3.5 hr |
Dagupan City: |
Portion of Arellano St. (DD-014) |
|
Secondary line maintenance |
October 27, 2023 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Calmay (Calmay Ilocano) |
|
Primary line maintenance |
8:00 am – 12:00 nn |
4 hr |
San Jacinto: |
Portion of Lobong (Sitio Mambog and Sitio Tabayoyong) |
|
October 26, 2023 |
Thu |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (in front of PHINMA and 7-eleven and adjacent buildings) |
|
Primary line maintenance |
October 26, 2023 |
Thu |
8:00 am – 9:00 am |
1 hr |
Dagupan City: |
Portion of Pantal (D7-010Y10) |
|
Secondary line maintenance |
8:30 am – 10:30 am |
2 hr |
San Fabian: |
Portion of Sobol (SF-S8W5W2MM) |
|
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Sobol (SF-S28W3) |
|
October 25, 2023 |
Wed |
1:00 pm – 2:00 pm |
1 hr |
San Fabian: |
Portion of Poblacion (SF-413) |
|
Secondary line maintenance |
October 25, 2023 |
Wed |
10:30 am – 11:30 am |
1 hr |
Sta. Barbara: |
Portion of Banaoang (SB-221) |
|
Secondary line maintenance |
October 25, 2023 |
Wed |
9:15 am – 10:15 am |
1 hr |
Sta. Barbara: |
Portion of Dalongue (SB-D35) |
|
Secondary line maintenance |
October 25, 2023 |
Wed |
8:00 am – 9:00 am |
1 hr |
Calasiao: |
Portion of Bued (SMB-030M) |
|
Secondary line maintenance |
October 21, 2023 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Sta Barbara: |
Portion of Tuliao (SB-033MW2) |
|
Secondary line maintenance |
October 21, 2023 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (PHINMA-UPANG and UDD) |
|
Primary line maintenance |
October 20, 2023 |
Fri |
4:00 pm – 5:00 pm |
1 hr |
Sta Barbara: |
Portion of Leet (SB-L2-25) |
|
Secondary line maintenance |
October 20, 2023 |
Fri |
2:30 pm – 3:30 pm |
1 hr |
Sta Barbara: |
Portion of Matic-Matic (SB-CS16W6) |
|
Secondary line maintenance |
October 20, 2023 |
Fri |
1:30 pm – 2:00 pm |
1 hr |
Sta Barbara: |
Portion of Butao (SB-B32) |
|
Secondary line maintenance |
October 20, 2023 |
Fri |
10:30 am – 11:30 am |
1 hr |
Sta Barbara: |
Portion of Carusucan (SB-C24) |
|
Secondary line maintenance |
October 20, 2023 |
Fri |
9:15 am – 10:15 am |
1 hr |
Sta Barbara: |
Portion of Sonquil (SB-S38) |
|
Secondary line maintenance |
October 20, 2023 |
Fri |
8:00 am – 9:00 am |
1 hr |
Sta Barbara: |
Portion of Dalongue (SB-D35) |
|
Secondary line maintenance |
October 19, 2023 |
Thu |
2:30 pm – 3:30 pm |
1 hr |
Calasiao: |
Portion of Bued (SMB-030W) |
|
Secondary line maintenance |
October 19, 2023 |
Thu |
1:30 pm – 2:00 pm |
1 hr |
Dagupan City: |
Portion of Mamalingling (D12-198) |
|
Secondary line maintenance |
October 19, 2023 |
Thu |
1:30 pm – 2:00 pm |
1 hr |
Dagupan City: |
Portion of Mamalingling (D12-198) |
|
Secondary line maintenance |
October 19, 2023 |
Thu |
9:30 am – 10:30 am |
1 hr |
San Fabian: |
Portion of Poblacion (SF-026) |
|
Secondary line maintenance |
October 19, 2023 |
Thu |
8:00 am – 9:00 am |
1 hr |
San Fabian: |
Portion of Lekep-Butao (SF-LB45) |
|
Secondary line maintenance |
October 18, 2023 |
Wed |
2:30 pm – 3:30 pm |
1 hr |
Manaoag: |
Portion of Matulong (M-5948) |
|
Secondary line maintenance |
October 18, 2023 |
Wed |
1:00 pm – 2:00 pm |
1 hr |
Manaoag: |
Portion of Oraan Easat (M-5892) |
|
Secondary line maintenance |
October 18, 2023 |
Wed |
11:00 am – 12:00 nn |
1 hr |
Manaoag: |
Portion of Sta. Ines (M-4635) |
|
Secondary line maintenance |
October 18, 2023 |
Wed |
9:30 am – 10:30 am |
1 hr |
Manaoag: |
Portion of Tebuel (M-4120) |
|
Secondary line maintenance |
October 18, 2023 |
Wed |
8:00 am – 9:00 am |
1 hr |
Manaoag: |
Portion of Pao (M-3306) |
|
Secondary line maintenance |
October 18, 2023 |
Wed |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (from Estrella's Bldg. to Rioferio Road) |
|
Primary line maintenance |
October 17, 2023 |
Tue |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (Pag-Asa Village and Zarate Subd.) |
|
Primary line maintenance |
October 16, 2023 |
Mon |
1:00 pm – 5:00 pm |
4 hr |
Dagupan City: |
Portion of Rivera St. (D17-010) |
|
Secondary line maintenance |
October 14, 2023 |
Sat |
1:00 am – 1:15 am |
15 min |
Dagupan City: |
Portion of AB Fernandez Ave., Fernandez St., Rizal St. and portion of Rivera St. |
|
Primary line maintenance |
1:00 am – 3:00 am |
2 hr |
Dagupan City: |
Portion of Mayombo (Villaflor Hospital, City Mall and BHF Mall) |
|
1:00 am – 6:00 am |
5 hr |
Dagupan City: |
AB Fernandez East and portion of Arellano St. (R1MC Hospital and NEPO Mall) |
|
5:45 am – 6:00 am |
15 min |
Dagupan City: |
Portion of AB Fernanndez Ave., Fernandez St., Rizal St., portion of Rivera St., and portion of Mayombo (Villaflor Hospital, City Mall and BHF Mall) |
|
October 14, 2023 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Rivera St. (D17-008) |
|
Secondary line maintenance |
October 12, 2023 |
Thu |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Arellano St. |
|
Primary line maintenance |
October 11, 2023 |
Wed |
9:00 am – 5:00 pm |
7 hr |
Dagupan City: |
Portion of Arellano St. (D21-001) |
|
Secondary line maintenance |
October 11, 2023 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Tebuel (M-4006W7) |
|
Secondary line maintenance |
October 10, 2023 |
Tue |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Tapuac (D24-038x) |
|
Primary line maintenance |
October 8, 2023 |
Sun |
5:45 am – 6:00 am |
15 min |
Dagupan City: |
Brgy 1, Brgy 2, Brgy 4, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, Pogo Chico, portion of Lasip Grande, Pugaro Suit, Salapingao, Tapuac, portion of Perez Blvd., and De Venecia Hi-Way Extension |
|
Primary line maintenance |
October 7, 2023 |
Sat |
6:00 am – 6:15 am |
15 min |
Primary line maintenance |
September 30, 2023 |
Sat |
1:00 am – 10:00 am |
9 hr |
Dagupan City: |
Portion of Arellano St. (D21-002) |
|
Secondary line maintenance |
September 29, 2023 |
Fri |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Boquig, San Marino Subdivision (D22-006MW6) |
|
Secondary line maintenance |
September 28, 2023 |
Thu |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (Trinidad Subdivision and Reycal) |
|
Primary line maintenance |
September 27, 2023 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Nalsian(Sitio Borac) |
|
Primary line maintenance |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. (Sunrise Subdivision) |
|
9:00 am – 5:00 pm |
8 hr |
San Jacinto: |
Portion of Lobong (Sitio Mambog and Sitio Tabayoyong) |
|
September 23, 2023 |
Sat |
3:45 am – 4:00 am |
15 min |
|
69kV line maintenance |
8:45 am – 9:00 am |
15 min |
September 22, 2023 |
Fri |
9:00 am – 2:00 pm |
5 hr |
Manaoag: |
Portion of Nalsian-Borac (M-4413) |
|
Secondary line maintenance |
September 21, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. and Maramba Bankers Village |
|
Primary line maintenance |
September 20, 2023 |
Wed |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Arellano St. (D21-091) |
|
Secondary line maintenance |
September 19, 2023 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. (D21-087 and D22-022) |
|
Secondary line maintenance |
1:30 pm – 4:00 pm |
2.5 hr |
September 19, 2023 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Tebuel (M-4130 to M-4137) |
|
Secondary line maintenance |
September 16, 2023 |
Sat |
1:00 am – 1:15 am |
15 min |
Dagupan City: |
Portion of AB Fernandez Avenue and portion of Pantal (Pantal-Guibang to corner De Venecia Highway Extension-Dawel) |
|
Primary line maintenance |
7:45 am – 8:00 am |
15 min |
1:00 am – 2:00 am |
1 hr |
Dagupan City: |
Bonuan Gueset, Bonuan Boquig, and Bonuan Binloc |
|
7:00 am – 8:00 am |
1 hr |
1:00 am – 3:00 am |
2 hr |
Dagupan City: |
Caranglaan, Bacayao Norte and Mayombo |
|
7:45 am – 8:00 am |
15 min |
1:00 am – 8:00 am |
7 hr |
Dagupan City: |
AB Fernandez East and portion of Arellano St. |
|
7:00 am – 7:15 am |
15 min |
San Fabian: |
Poblacion, Lekep-Butao, Longos Central, Longos Proper, Longos-Amangonan-Parac-Parac Fabrica, Sagud-Bahley, Nibaliw Central, Nibaliw East, Nibaliw Magliba, Nibaliw Narvarte and Nibaliw Vidal |
|
September 15, 2023 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of Mambog West, Lobong (SJ-MB1 to SJ-MB18) |
|
Secondary line maintenance |
September 15, 2023 |
Fri |
9:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Ambuetel (C33-128 to C33-128W3W) |
|
Secondary line maintenance |
September 15, 2023 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of San Jose (Sitio Mambog) |
|
Secondary line maintenance |
September 15, 2023 |
Fri |
8:30 am – 12:30 pm |
4 hr |
Calasiao: |
Portion of Nalsian, Calasiao (C30-038 to C30-034) |
|
Secondary line maintenance |
September 14, 2023 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Calasiao: |
Portion of Nalsian, Calasiao (C30-032 to C30-030 and C30-032 to C30-034) |
|
Secondary line maintenance |
September 11, 2023 |
Mon |
1:30 pm – 4:00 pm |
2.5 hr |
Dagupan City: |
Portion of Arellano St. Pantal (D21-084) |
|
Secondary line maintenance |
September 7, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Lucao (D24-102) |
|
Secondary line maintenance |
September 7, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Leet (SB-L1-2) |
|
Primary line maintenance |
September 3, 2023 |
Sun |
5:30 pm – 6:00 pm |
30 min |
|
NGCP interruption |
6:00 am – 6:30 am |
30 min |
|
September 2, 2023 |
Sat |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Arellano (D21-080 to D21-083) |
|
Secondary line maintenance |
September 1, 2023 |
Fri |
1:00 pm – 4:00 pm |
3 hr |
August 31, 2023 |
Thu |
7:00 am – 12:00 nn |
5 hr |
San Fabian: |
Portion of Palapad (SF-FD8MW12) |
|
Secondary line maintenance |
August 31, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Sobol (SF-S8W3 to SF-S8W7) |
|
Secondary line maintenance |
August 30, 2023 |
Wed |
9:00 am – 11:00 am |
2 hr |
San Fabian: |
Portion of Bolasi (SF-105) |
|
Secondary line maintenance |
August 29, 2023 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Bolasi (SF-105) |
|
Secondary line maintenance |
August 29, 2023 |
Tue |
7:00 am – 10:00 am |
3 hr |
Dagupan City: |
Portion of Arellano (D21-079) |
|
Secondary line maintenance |
August 26, 2023 |
Sat |
7:00 am – 10:00 am |
3 hr |
Dagupan City: |
Portion of Arellano (D21-079) |
|
Secondary line maintenance |
August 25, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Balingueo (CSB-199) |
|
Secondary line maintenance |
August 24, 2023 |
Thu |
8:00 am – 3:00 pm |
7 hr |
Calasiao: |
Portion of Malabago (C34-L6W-C34-L6) |
|
Secondary line maintenance |
August 24, 2023 |
Thu |
10:00 am – 4:00 pm |
6 hr |
Sta. Barbara: |
Portion of Cablong (SB-CB16W11) |
|
Secondary line maintenance |
August 17, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Lipit Tomeeng (SF-BM15) |
|
Secondary line maintenance |
August 17, 2023 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Alacan |
|
Primary line maintenance |
August 16, 2023 |
Wed |
9:30 am – 11:00 am |
1.5 hr |
Dagupan City: |
Portion of Bonuan Catacdang (D22-032) |
|
Secondary line maintenance |
August 15, 2023 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Tebuel (M-4131M to M-4131MW2) |
|
Secondary line maintenance |
August 12, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Nibaliw Vidal (SF-191M) |
|
Secondary line maintenance |
August 10, 2023 |
Thu |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Tondaligan (D23-078) |
|
Secondary line maintenance |
August 10, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-032) |
|
Secondary line maintenance |
August 9, 2023 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Sagud Bahley (Dispo St.) |
|
Primary line maintenance |
August 8, 2023 |
Tue |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Longos (C34-L2) |
|
Primary line maintenance |
August 7, 2023 |
Mon |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-032) |
|
Secondary line maintenance |
August 6, 2023 |
Sun |
6:00 am – 8:00 am |
2 hr |
Manaoag: |
Portion of Pao (M-3307) |
|
Secondary line maintenance |
August 6, 2023 |
Sun |
6:00 am – 6:30 am |
30 min |
San Jacinto: |
All areas |
Manaoag: |
All areas |
|
Shifting the power source of DECORP San Jacinto Substation to NGCP Balingueo due to NGCP's upgrading projects at San Manuel Substation |
5:00 pm – 6:00 pm |
1 hr |
Shifting back the power source of DECORP San Jacinto Substation from NGCP Balingueo Substation to NGCP San Manuel Substation |
August 1, 2023 |
Tue |
9:00 am – 11:00 am |
2 hr |
Manaoag: |
Portion of Pantal (M-5024) |
|
Secondary line maintenance |
August 1, 2023 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Mamalingling (D12-198) |
|
Secondary line maintenance |
July 31, 2023 |
Mon |
1:00 pm – 3:00 pm |
2 hr |
Calasiao: |
Portion of Cabilocaan (C32-119W16 to C32-119W29) |
|
Secondary line maintenance |
July 30, 2023 |
Sun |
7:45 am – 8:00 am |
15 min |
Dagupan City: |
Caranglaan, Bacayao Norte, Bacayao Sur, Malued, Pogo Grande, Lasip Grande, Lucao, Mayombo, AB Fernandez East, Tebeng, Mangin, Tambac, Bolosan, Mamaling, Salisay, portion of Arellano St., portion of M.H. Del Pilar St. and portion of Herrero Peres |
|
NGCP interruption |
7:45 am – 8:00 am |
15 min |
July 29, 2023 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion of Mangin (D12-184W3) and portion of Bonuan Gueset (D22-006MW11W4) |
|
Primary line maintenance |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Palapad (SF-FD31 to SF-FD37) |
|
July 28, 2023 |
Fri |
1:00 pm – 3:00 pm |
2 hr |
Manaoag: |
Portion of Pantal (M-5024) |
|
Secondary line maintenance |
July 28, 2023 |
Fri |
9:00 am – 1:00 pm |
4 hr |
Manaoag: |
Portion of Baritao (M-5349) |
|
Secondary line maintenance |
July 26, 2023 |
Wed |
9:00 am – 2:00 pm |
5 hr |
Manaoag: |
Portion of Baritao (M-5349 to M-5354) |
|
Secondary line maintenance |
July 22, 2023 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Matic-Matic (SB-273 to SB-274M2W4) |
|
Secondary line maintenance |
July 22, 2023 |
Sat |
9:00 am – 1:30 pm |
4 hr |
Dagupan City: |
Portion of Arellano St. (D21-001 to D21-001M2) |
|
Secondary line maintenance |
July 22, 2023 |
Sat |
8:30 am – 11:30 am |
3 hr |
Manaoag: |
Portion of Baritao (Arabian) |
|
Primary line maintenance |
July 21, 2023 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Lomboy, Salapingao, and Pugaro Suit |
|
Primary line maintenance |
6:00 am – 6:30 am |
30 min |
|
Switching back San Fabian feeders to San Fabian Substation |
July 20, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of AB Fernandez Ave. (D4-010) |
|
Secondary line maintenance |
July 20, 2023 |
Thu |
9:00 am – 2:00 pm |
5 hr |
San Jacinto: |
Portion of San Jose (SJ-D14W7 to SJ-D14W13) |
|
Secondary line maintenance |
July 19, 2023 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of A.B. Fernandez Ave. (D4-011W) |
|
Secondary line maintenance |
July 18, 2023 |
Tue |
9:00 am – 1:00 pm |
4 hr |
San Jacinto: |
Portion of Labney (SJ-Y58W10 to SJ-Y44WW6) |
|
Secondary line maintenance |
July 15, 2023 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Arellano (BPI) |
|
Secondary line maintenance |
8:00 am – 11:00 am |
3 hr |
Dagupan City: |
Portion of Arellano St. (D21-022) |
|
July 15, 2023 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Sta. Barbara: |
Portion of Sonquil |
|
Primary line maintenance |
July 14, 2023 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Malued (D27-041X to
D27-41X6) |
|
Secondary line maintenance |
Sta. Barbara: |
Portion of Tuliao (SB-019W13 to
SB-019W14W) |
|
July 14, 2023 |
Fri |
6:00 am – 6:30 am |
0.5 hr |
|
69kV line maintenance and safety clearance precaution |
July 12, 2023 |
Wed |
8:00 am – 11:00 am |
3 hr |
San Fabian: |
Portion of Anonang |
|
Primary line maintenance |
July 12, 2023 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of San Miguel (C29-073) |
|
Primary line maintenance |
July 11, 2023 |
Tue |
10:00 am – 2:00 pm |
4 hr |
San Jacinto: |
Portion of Sta.Cruz (SJC0006 to SJC0073) |
|
Primary line maintenance |
July 11, 2023 |
Tue |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Catacdang (DSF-36) |
|
Secondary line maintenance |
July 10, 2023 |
Mon |
11:00 am – 3:00 pm |
4 hr |
Sta. Barbara: |
Portion of Balingueo (SB-154-53) |
|
Secondary line maintenance |
July 8, 2023 |
Sat |
8:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Leleman (M-4088W) |
|
Secondary line maintenance |
July 8, 2023 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion Arellano St. (D21-012) |
|
Primary line maintenance |
July 8, 2023 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Pantal (Pag-asa Village) |
|
Primary line maintenance |
Dagupan City: |
Portion of Malued (Fisheries) |
|
July 7, 2023 |
Fri |
9:00 am – 4:00 pm |
7 hr |
Dagupan City: |
Portion A.B Fernandez East (D11-040) |
|
Secondary line maintenance |
July 7, 2023 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Pantal (Pag-asa Village) |
|
Primary line maintenance |
July 6, 2023 |
Thu |
6:00 am – 9:00 am |
3 hr |
Dagupan City: |
Mamalingling |
|
Primary line maintenance |
July 5, 2023 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Manaoag: |
Portion of Pugaro (Sitio Ordonez) |
|
Primary line maintenance |
July 3, 2023 |
Mon |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Tuliao (SB-005 to SB-005W9) |
|
Secondary line maintenance |
July 1, 2023 |
Sat |
5:00 am – 6:00 am |
1 hr |
Calasiao: |
Portion of Calasiao (C30-012) |
|
Primary line maintenance |
11:00 am – 12:00 nn |
1 hr |
Calasiao: |
Portion of Poblacion (C30-022) |
|
July 1, 2023 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Calasiao: |
Portion of San Miguel (C29-X20) |
|
Secondary line maintenance |
July 1, 2023 |
Sat |
5:00 am – 5:15 am |
15 min |
|
Primary line maintenance |
11:45 am – 12:00 nn |
15 min |
5:00 am – 6:00 am |
1 hr |
Calasiao: |
Portion of Nalsian, portion of San Miguel, portion of Poblacion West, portion of Buenlag, Mancup, Lasip, Longos, Malabago, San Vicente, Dinalaoan, Ambuetel, Lumbang, Nagsaing, and Doyong |
San Carlos City: |
Cruz and Bolingit |
|
11:00 am – 12:00 nn |
1 hr |
5:00 am – 12:00 nn |
7 hr |
Calasiao: |
Portion of Poblacion East (from Centrum Fuel to Amco Convenience Store and Malong st.) |
|
June 30, 2023 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Malued (D27-041X4) |
|
Secondary line maintenance |
June 29, 2023 |
Thu |
10:00 am – 12:00 nn |
2 hr |
San Fabian: |
Portion of Bibisocol (SF-IB31 to SFB-0269) |
|
Primary line maintenance |
June 29, 2023 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Tuliao |
SB-011 (8:00 am – 10:00 am) |
CSB-83 (10:00 am – 12:00 nn) |
|
Secondary line maintenance |
June 28, 2023 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Pugaro (M-2407 to M-2411W3M) |
|
Secondary line maintenance |
June 26, 2023 |
Mon |
10:00 am – 3:00 pm |
5 hr |
Manaoag: |
Portion of Baritao (M-5519 to M-5523) |
|
Secondary line maintenance |
Manaoag: |
Portion of Aquino St., Poblacion (M-1557 to M-1556W2) |
|
June 22, 2023 |
Thu |
6:00 am – 12:00 nn |
6 hr |
San Fabian: |
Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line maintenance |
5:00 am – 5:15 am |
15 min |
Calasiao: |
Portion of Nalsian (Chowking to Ramos Bridge), portion of San Miguel, portion of Poblacion East, Portion of Poblacion West, Portion of Mancup (Mancup interior), Malabago, Nagsaing, Doyong, portion of San Vicente, Dinalaoan, Ambuetel and Lumbang |
San Carlos City : |
Cruz and Bolingit |
|
7:45 am – 8:00 am |
15 min |
5:00 am – 8:00 am |
3 hr |
|
June 21, 2023 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Calasiao: |
Portion of Poblacion East (C29-073) |
|
Secondary line maintenance |
10:00 am – 4:00 pm |
6 hr |
Dagupan City: |
Portion of Arellano (D21-087) |
|
June 21, 2023 |
Wed |
10:00 am – 11:00 am |
1 hr |
Dagupan City: |
Portion of Lasip Chico (D28-010M) |
|
Secondary line maintenance |
11:00 am – 12:00 nn |
1 hr |
Dagupan City: |
Portion of Malued (D27-034W5) |
|
1:00 pm – 2:00 pm |
1 hr |
Dagupan City: |
Portion of Pogo Grande (D26-027) |
|
2:00 pm – 3:00 pm |
1 hr |
Calasiao: |
Portion of Banaoang (CD-043MW3) |
|
3:00 pm – 5:00 pm |
2 hr |
Calasiao: |
Portion of Banaoang (C33-001W) |
|
June 21, 2023 |
Wed |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Caranglaan (D19-023) |
|
Secondary line maintenance |
June 20, 2023 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Bued (C32-164MW7 to C32-164MW13) |
|
Secondary line maintenance |
1:00 pm – 3:00 pm |
2 hr |
San Jacinto: |
Portion of San Maria (SJ-265M2W) |
|
Secondary line maintenance |
3:00 pm – 4:00 pm |
1 hr |
San Jacinto: |
Portion of Nalsian (M-4032) |
|
Secondary line maintenance |
10:00 am – 11:00 am |
1 hr |
San Jacinto: |
Portion of San Roque (SJ-236) |
|
Secondary line maintenance |
9:00 am – 10:00 am |
1 hr |
San Jacinto: |
Portion of Lobong (SJ-D66) |
|
Secondary line maintenance |
June 20, 2023 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Lucao (D24-166W8) |
|
Secondary line maintenance |
June 19, 2023 |
Mon |
1:00 pm – 4:00 pm |
3 hr |
Sta. Barbara: |
Portion of Malanay (SB-M27W4) |
|
Secondary line maintenance |
June 17, 2023 |
Sat |
8:00 am – 12:00 nn |
4 hr |
San Jacinto: |
Portion of Labney, Bolo and Sta. Cruz |
|
Primary line maintenance |
June 16, 2023 |
Fri |
10:00 am – 5:00 pm |
6 hr |
Dagupan City: |
Portion of Bonuan Area and De Venecia D23-216 (10AM–12NN);D23-230 (1PM–2PM);D23-104W26 (2PM–3PM);D22-059 (2:30PM–4PM);D28-010M (4PM–5PM |
|
Secondary line maintenance |
June 16, 2023 |
Fri |
8:30 am – 12:00 nn |
3.5 hr |
Manaoag: |
Portion of Babasit (M-2034 to M-2034X4) |
|
Secondary line maintenance |
June 15, 2023 |
Thu |
8:30 am – 3:30 pm |
7 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-029) |
|
Secondary line maintenance |
June 14, 2023 |
Wed |
10:30 am – 12:00 nn |
1.5 hr |
Dagupan City: |
Portion of Pantal (D7-010Y2) |
|
Secondary line maintenance |
June 14, 2023 |
Wed |
10:00 am – 1:00 pm |
3 hr |
Manaoag: |
Portion of Inamotan, Baguinay, Matulong and Parian, (Manaoag) and portion of San Jose (facing Leet), (Urdaneta City) |
|
Primary line maintenance |
June 10, 2023 |
Sat |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Sta. Maria, Bonuan Boquig (D23-278W3 to D23-279) |
|
Secondary line maintenance |
June 9, 2023 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Bued (C32-166) |
|
Secondary line maintenance |
June 9, 2023 |
Fri |
2:00 am – 5:00 am |
3 hr |
Sta. Barbara: |
Portion of Erfe (One Manaoag Solar) |
69kV line maintenance |
|
6:00 am – 10:00 am |
4 hr |
Calasiao: |
Portion of San Vicente and Banaoang |
|
Primary line maintenance |
June 8, 2023 |
Thu |
10:00 am – 4:00 pm |
6 hr |
Sta. Barbara: |
Portion of Malanay (SB-M31) |
|
Secondary line maintenance |
June 8, 2023 |
Thu |
9:30 am – 11:30 am |
2 hr |
Dagupan City: |
Portion of Zamora Street (D15-049) |
|
Secondary line maintenance |
June 7, 2023 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Matic-matic (SB-273) |
|
Secondary line maintenance |
June 6, 2023 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-278) |
|
Secondary line maintenance |
June 5, 2023 |
Mon |
10:30 am – 4:00 pm |
5.5 hr |
Sta. Barbara: |
Portion of Malanay (SB-M31) |
|
Secondary line maintenance |
June 3, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Bengal (SB-BF14W6) |
|
Secondary line maintenance |
May 31, 2023 |
Wed |
8:30 am – 12:00 nn |
3.5 hr |
Dagupan City: |
Portion of De Venecia-Lucao (CD-040) |
|
Secondary line maintenance |
May 30, 2023 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-030) |
|
Secondary line maintenance |
May 26, 2023 |
Fri |
5:00 am – 6:00 am |
1 hr |
Calasiao: |
Portion of San Miguel (Robinson
Mall, Monarch Hotel, Toyota, AMA, Yamaha, City De Luxe, BDO,
PAMMA, Home Ideas, Caltex, Shell, Sea Oil and Sikap Executive Homes) |
|
Primary line maintenance |
May 24, 2023 |
Wed |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Leet (SB-LF60W9W5 to SB-LF60W9W3) |
|
Secondary line maintenance |
May 22, 2023 |
Mon |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Leet (SB-LF66 to SB-LFW66W13) |
|
Secondary line maintenance |
May 19, 2023 |
Fri |
5:00 am – 12:00 nn |
7 hr |
Sta. Barbara: |
Portion of Leet (SB-LF60W16) |
|
Secondary line maintenance |
May 19, 2023 |
Fri |
5:00 am – 10:00 am |
5 hr |
Sta. Barbara: |
Portion of Nilombot, Banzal and Erfe |
|
Primary line maintenance |
10:00 am – 12:00 nn |
2 hr |
Sta. Barbara: |
Portion of Erfe |
|
May 18, 2023 |
Thu |
8:30 am – 12:00 nn |
3.5 hr |
San Fabian: |
Portion of Bigbiga (Near
Baranggay Hall) |
|
Primary line maintenance |
May 15, 2023 |
Mon |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of San Roque (SJ-188) |
|
Secondary line maintenance |
May 13, 2023 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Lucao (Millora) |
|
Primary line maintenance |
May 12, 2023 |
Fri |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Lipit Tommeng |
|
Primary line maintenance |
May 11, 2023 |
Thu |
1:00 pm – 3:00 pm |
2 hr |
San Fabian: |
Portion of Tiblong (SF-149-19) |
|
Secondary line maintenance |
May 11, 2023 |
Thu |
10:00 am – 12:00 nn |
2 hr |
Sta. Barbara: |
Portion of Tebag (SB-288) |
|
Secondary line maintenance |
May 11, 2023 |
Thu |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Baguinay (M-5899W3) |
|
Secondary line maintenance |
May 11, 2023 |
Thu |
9:00 am – 10:00 am |
1 hr |
San Fabian: |
Portion of Rabon (SFB0180W2) |
|
Secondary line maintenance |
May 10, 2023 |
Wed |
1:30 pm – 3:30 pm |
2 hr |
Calasiao: |
Portion of Songkoy (C35-S3) |
|
Secondary line maintenance |
May 9, 2023 |
Tue |
3:00 pm – 4:00 pm |
1 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-199W4) |
|
Secondary line maintenance |
May 9, 2023 |
Tue |
2:00 pm – 3:00 pm |
1 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-206M) |
|
Secondary line maintenance |
May 9, 2023 |
Tue |
1:00 pm – 2:00 pm |
1 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-334) |
|
Secondary line maintenance |
May 9, 2023 |
Tue |
11:00 am – 12:00 nn |
1 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-259M2) |
|
Secondary line maintenance |
May 9, 2023 |
Tue |
10:00 am – 11:00 am |
1 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-181) |
|
Secondary line maintenance |
May 9, 2023 |
Tue |
10:00 am – 12:00 nn |
2 hr |
Manaoag: |
Portion of Babasit (M-2029) |
|
Secondary line maintenance |
May 6, 2023 |
Sat |
8:30 am – 12:00 nn |
3.5 hr |
San Fabian: |
Portion of Bolaoen (Bolaoen Centro) |
|
Primary line maintenance |
May 5, 2023 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Sta. Barbara: |
Portion of Tuliao (SB-037W4) |
|
Secondary line maintenance |
May 5, 2023 |
Fri |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Nibaliw Navarte
(Sitio Sungyot) |
|
Primary line maintenance |
May 4, 2023 |
Thu |
8:00 am – 8:30 pm |
30 min |
San Jacinto: |
Portion of Sitio Capaoay,
Poblacion (SJ-109) |
|
Secondary line maintenance |
May 4, 2023 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Jacinto: |
Portion of Lobong (Sitio Mambog) |
|
Primary line maintenance |
April 28, 2023 |
Fri |
1:00 am – 5:00 pm |
4 hr |
San Fabian: |
Portion of Aramal (SF-ML41M to SF-ML43) |
|
Secondary line maintenance |
April 28, 2023 |
Fri |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Galvan St.(D16-015) |
|
Secondary line maintenance |
April 22, 2023 |
Sat |
5:00 am – 5:15 am |
15 min |
Dagupan City: |
Portion of Pantal
(Pantal-Guibang and corner De Venecia Highway
Extension-Dawel) |
|
Primary line maintenance |
11:45 am – 12:00 nn |
5:00 am – 6:00 am |
1 hr |
Dagupan City: |
Portion of Bonuan Gueset, Bonuan
Binloc and Bonuan Boquig |
|
11:00 am – 12:00 nn |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Arellano St. (Triple
M Foodhouse to corner Arellano-Dawel) and portion of Bonuan
Gueset (San Marino Subdivision to Bombo Radyo) |
|
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Lucao (Sitio Domorog) |
|
April 21, 2023 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Lipit Tomeeng |
|
Primary line maintenance |
April 20, 2023 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Ambalangan-Dalin
(Bisbisocol and Mamatao) |
|
Primary line maintenance |
April 19, 2023 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bolosan (D12-178M to D12-183) |
|
Secondary line maintenance |
April 18, 2023 |
Tue |
8:30 am – 2:30 pm |
6 hr |
Dagupan City: |
Portion of Bolosan (D12-183M) |
|
Secondary line maintenance |
1:30 pm – 3:30 pm |
2 hr |
Dagupan City: |
Portion of Bolosan (D12-184) |
|
April 15, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset
(D23-021 to D23-021WX2) |
|
Secondary line maintenance |
April 15, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. (Sunrise Subdivision) |
|
Primary line maintenance |
April 14, 2023 |
Fri |
8:00 am – 4:00 pm |
8 hr |
Dagupan City: |
Portion of Bonuan Binloc (DSF-175) |
|
Primary line maintenance |
April 13, 2023 |
Thu |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bolosan (D12-177 to D12-178M) |
|
Secondary line maintenance |
April 12, 2023 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. (Silverio's Restaurant) |
|
Secondary line maintenance |
April 5, 2023 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bolosan (D12-176) |
|
Secondary line maintenance |
April 5, 2023 |
Wed |
10:00 am – 4:00 pm |
6 hr |
San Fabian: |
Portion of Cabaruan (SF-512MY10) |
|
Secondary line maintenance |
April 5, 2023 |
Wed |
11:00 am – 12:00 nn |
1 hr |
Sta. Barbara: |
Portion of Malanay (SB-M22W10) |
|
Secondary line maintenance |
April 5, 2023 |
Wed |
9:00 am – 11:00 am |
2 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-378W3) |
|
Secondary line maintenance |
April 4, 2023 |
Tue |
9:00 am – 12:00 nn |
3 hr |
|
Primary line maintenance |
April 4, 2023 |
Tue |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Lasip Chico |
|
Primary line maintenance |
April 4, 2023 |
Tue |
8:00 am – 3:00 pm |
7 hr |
Dagupan City: |
Portion of Lasip Chico (D28-006) |
|
Secondary line maintenance |
April 1, 2023 |
Sat |
9:30 am – 3:30 pm |
6 hr |
Dagupan City: |
Portion of Pugaro Suit |
|
Primary line maintenance |
March 30, 2023 |
Thu |
10:00 am – 2:00 pm |
4 hr |
San Fabian: |
Portion of Inmalog Norte (SFB0234) |
|
Secondary line maintenance |
March 30, 2023 |
Thu |
9:30 am – 12:00 nn |
2.5 hr |
Dagupan City: |
Portion of Tondaligan (D23-123) |
|
Secondary line maintenance |
March 30, 2023 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Lucao (Sitio Domorog) |
|
Primary line maintenance |
March 29, 2023 |
Wed |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Pugaro Suit (D2-F21) |
|
Secondary line maintenance |
March 28, 2023 |
Tue |
10:00 am – 12:00 pm |
2 hr |
Manaoag: |
Portion of Cabanbanan (M-4067M) |
|
Primary line maintenance |
March 28, 2023 |
Tue |
10:00 am – 4:00 pm |
6 hr |
Manaoag: |
Portion of Cabanbanan (M-4076) |
|
Secondary line maintenance |
March 25, 2023 |
Sat |
10:00 am – 12:00 nn |
2 hr |
San Fabian: |
Portion of Bolaoen (SF-BS19 to SF-BS24) |
|
Secondary line maintenance |
March 25, 2023 |
Sat |
6:00 am – 3:00 pm |
9 hr |
Dagupan City: |
Portion of Lucao (Sitio Dumorog) |
|
Primary line maintenance |
March 24, 2023 |
Fri |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Brgy I, Brgy II, Brgy IV, Bonuan Binloc, Bonuan Boquig, Bonuan Geueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, portion of Lasip Grande, Pugaro Suit, Salapingao, Tapuac, portion of Perez Blvd., and De Venecia Hi-way Extension |
|
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to replacement of defective Oil Circuit Breaker at NGCP Labrador Substation |
March 23, 2023 |
Thu |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Lucao (D24-156) |
|
Secondary line maintenance |
March 22, 2023 |
Wed |
6:00 am – 12:30 nn |
6 hr |
Dagupan City: |
Portion of Lucao (Nel-Ars Subdivision) |
|
Primary line maintenance |
March 18, 2023 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (Sition Calamiong) |
|
Primary line maintenance |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Inmalog Sur and portion of Lipit Tomeeng |
|
March 17, 2023 |
Fri |
4:00 am – 5:30 am |
1.5 hr |
Sta. Barbara: |
Portion of Erfe (One Manaoag Solar) |
|
69kV line maintenance |
March 16, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Malued(D27-030M) |
|
Secondary line maintenance |
March 16, 2023 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Patayak and Cablong |
|
Primary line maintenance |
March 15, 2023 |
Wed |
10:00 am – 12:00 nn |
2 hr |
Manaoag: |
Portion of Baloking (M-2054W3) |
|
Secondary line maintenance |
March 15, 2023 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Nilombot (SB-F63 to SB-F58W6) |
|
Secondary line maintenance |
March 15, 2023 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Bigbiga and Gumot (SFB0008 to SFB0015M) |
|
Secondary line maintenance |
March 13, 2023 |
Mon |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Cablong (SB-CB13MX to SB-CB13MW2W5) |
|
Secondary line maintenance |
March 11, 2023 |
Sat |
9:00 am – 4:00 pm |
7 hr |
Sta. Barbara: |
Portion of Leet (SB-L3-20 to SB-L3-30) |
|
Secondary line maintenance |
March 11, 2023 |
Sat |
6:00 am – 7:00 am |
1 hr |
San Fabian: |
Sobol, portion of Tempra-Guilig, and portion of Tocok |
|
Primary line maintenance |
10:00 am – 11:00 am |
6:00 am – 11:00 am |
5 hr |
San Fabian: |
Bolasi, Mabilao, Alacan, Tiblong, Rabon, Lipit-Tomeeng, portion of Ambalangan-Dalin (Bisbisucol and Mamatao), Inmalog Norte, Inmalog Sur, Bigbiga, Gumot and Bolaoen |
|
March 9, 2023 |
Thu |
9:00 am – 4:00 pm |
5 hr |
San Fabian: |
Portion of Rabon |
|
March 8, 2023 |
Wed |
10:00 am – 4:00 pm |
6 hr |
Sta. Barbara: |
Portion of Leet (SB-L3-20 to SB-L3-30) |
|
Secondary line maintenance |
March 8, 2023 |
Wed |
6:00 am – 8:00 am |
2 hr |
|
Maintenance of NGCP San Manuel-Calasiao 69kV line |
March 7, 2023 |
Tue |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Brgy. I, Brgy. II, Brgy IV,
Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael,
Herrero, Lomboy, Portion of Lucao, Pantal, Poblacion Oeste,
portion of Pogo Chico, portion of Lasip Grande, Pugaro Suit,
Salapingao, Tapuac, portion of Perez Blvd. and De Venecia Hi-way
Extension |
|
Shifting the power source of DECORP Dagupan
Substation from NGCP Labrador Substation to NGCP Balingueo due
to relacement of defective Oil Circuit Breaker at NGCP Labrador
Substation |
March 6, 2023 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-156) |
|
Secondary line maintenance |
Mar 3, 2023 |
Fri |
5:00 am – 6:00 am |
1 hr |
Calasiao: |
San Miguel, Nalsian, portion of Poblacion (Jones St., Mamaradlo St., F. Sison St., and Bonifacio St.), Banaoang, San Vicente, Dinalaoan and Ambuetel |
|
Primary line maintenance |
5:00 am – 11:00 am |
6 hr |
Calasiao: |
Portion of Poblacion (Malong St.) |
|
6:00 am – 11:00 am |
5 hr |
Dagupan City: |
Portion of Pantal (Zarate Subdivision) |
|
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Gabon (Tamayo Road) |
|
Feb 28, 2023 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Ambalangan Dalin (SF-FL72) |
|
Secondary line maintenance |
Feb 24, 2023 |
Fri |
1:30 pm – 4:30 pm |
3 hr |
Dagupan City: |
Portion of Lasip Chico (CD-019X4 to CD-019X4W2) |
|
Secondary line maintenance |
Feb 24, 2023 |
Fri |
11:00 am – 4:00 pm |
5 hr |
Dagupan City: |
Portion of Caranglaan (D19-074 to D19-074W5) |
|
Secondary line maintenance |
Feb 20, 2023 |
Mon |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Buenlag (C35-024M) |
|
Secondary line maintenance |
Feb 18, 2023 |
Sat |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Mabilao (SF-126W17) |
|
Secondary line maintenance |
Feb 15, 2023 |
Wed |
10:00 am – 3:00 pm |
5 hr |
San Fabian: |
Portion of Aramal (SF-ML33 to SF-ML33W5) |
|
Secondary line maintenance |
Feb 15, 2023 |
Wed |
9:00 am – 2:00 pm |
5 hr |
San Jacinto:  |
Portion of Lobong (SJ-Y22 to SJ-Y26) |
|
Secondary line maintenance |
Feb 15, 2023 |
Wed |
5:45 am – 6:00 am |
15 min |
Dagupan City:  |
Caranglaan, Bacayao Norte,
Bacayao Sur, Malued, Pogo Grande, Lasip Grande, portion of
Lucao, Mayombo, portion of A.B. Fernandez East, Tebeng,
Mangin, Tambac, Bolosan, Mamalingling, Salisay, portion of
Arellano, portion of M.H. Del Pilar St., portion of Herrero
and portion of Perez Blvd. |
|
Shifting the power source of DECORP Bacayao
Substation and San Fabian Substation from NGCP Balingueo
Substation to NGCP Labrador Substation due to NGCP's APMT of
100MVA Power Transformer and correction of various defects of
power equipment at Balingueo Substation |
6:00 pm – 6:30 pm |
30 min |
Shifting back the power source of DECORP
Bacayao Substation and San Fabian Substation from NGCP
Labrador Substation to NGCP Balingueo Substation |
Feb 14, 2023 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Bolosan (D12-141W2) |
|
Secondary line maintenance |
Feb 11, 2023 |
Sat |
9:00 am – 2:00 pm |
5 hr |
San Jacinto: |
Portion of Lobong (SJ-Y18) |
|
Secondary line maintenance |
Feb 10, 2023 |
Fri |
9:00 am – 2 :00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-189W4M) |
|
Secondary line maintenance |
Feb 10, 2023 |
Fri |
7:00 am – 4:00 pm |
9 hr |
Dagupan City: |
Portion of Salapingao (D2-S21) |
|
Primary line maintenance |
Feb 10, 2023 |
Fri |
7:00 am – 4:00 pm |
9 hr |
Dagupan City: |
Portion of Pugaro Suit |
|
Primary line maintenance |
Feb 8, 2023 |
Wed |
1:00 pm – 4:00 pm |
3 hr |
Sta. Barbara: |
Portion of Matic-Matic (SB-262) |
|
Secondary line maintenance |
Feb 7, 2023 |
Tue |
1:00 pm – 4:00 pm |
3 hr |
Sta. Barbara: |
Portion of Dalongue (SB-D27W3M to SB-D27W9) |
|
Secondary line maintenance |
Feb 4, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Gabon (Tamayo Rd.) |
|
Primary line maintenance |
Feb 3, 2023 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Baritao (Arabian Rd.) |
|
Primary line maintenance |
Feb 2, 2023 |
Thu |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of Bonuan Binloc (D23-479 to D23-486) |
|
Secondary line maintenance |
Feb 1, 2023 |
Wed |
10:30 am – 12:00 nn |
1.5 hr |
Calasiao: |
Portion of Talibaew (C32-029X3) |
|
Secondary line maintenance |
Feb 1, 2023 |
Wed |
9:00 am – 1:00 pm |
4 hr |
San Fabian: |
Portion of Aramal (SF-ML33 to SF-ML37) |
|
Secondary line maintenance |
Jan 26, 2023 |
Thu |
10:00 am – 3:00 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Boquig (D23-147) |
|
Secondary line maintenance |
Jan 25, 2023 |
Wed |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Aramal (Sitio Lubang) |
|
Primary line maintenance |
Jan 25, 2023 |
Wed |
7:00 am – 9:00 am |
2 hr |
Manaoag: |
Portion of Poblacion (M-1219M) |
|
Secondary line maintenance |
Jan 24, 2023 |
Tue |
1:30 pm – 3:00 am |
1 hr |
Calasiao: |
Portion of Talibaew (C34-026M2) |
|
Secondary line maintenance |
Jan 24, 2023 |
Tue |
10:00 am – 12:00 nn |
2 hr |
Calasiao: |
Portion of Macabito
(C35-095MW3) |
|
Primary line maintenance |
Jan 24, 2023 |
Tue |
9:00 am – 10:00 am |
1 hr |
Manaoag: |
Portion of Pao (M-3341) |
|
Secondary line maintenance |
Jan 24, 2023 |
Tue |
8:00 am – 10:00 am |
2 hr |
Dagupan City: |
Portion of Perez Blvd. (D24-004) |
|
Secondary line maintenance |
Jan 21, 2023 |
Sat |
6:00 am – 6:30 am |
30 min |
|
Shifting the power source of DECORP San
Jacinto Substation from NGCP San Manuel Substation to NGCP
Balingueo Substation to implement APMT of 100MVA Power
Transformer at NGCP San Manuel Substation and correction of
defects along San Manuel-Calasiao 69kV line |
5:30 pm – 6:00 pm |
30 min |
Shifting back the power source of DECORP San
Jacinto Substation from NGCP Balingueo Substation to NGCP San
Manuel Substation |
Jan 20, 2023 |
Fri |
1:30 pm – 3:30 pm |
2 hr |
San Fabian: |
Portion of Rabon (SFB-0104) |
|
Primary line maintenance |
Jan 20, 2023 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Lucao (D24-D3 and D24-D5) |
|
Primary line maintenance |
Jan 20, 2023 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Rabon and Bigbiga |
|
Primary line maintenance |
6:00 am – 10:00 am |
4 hr |
Dagupan City: |
Portion of (Lucao Arco,
Lucao-Cabaruan and Gaudencio Siapno Rd.) |
|
Jan 19, 2023 |
Thu |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Aramal (Sitio Lubag) |
|
Primary line maintenance |
Jan 17, 2023 |
Tue |
10:00 am – 12:00 nn |
2 hr |
Sta. Barbara: |
Portion of Malanay (SB-M22W14) |
|
Secondary line maintenance |
Jan 17, 2023 |
Tue |
2:00 pm – 4:00 pm |
2 hr |
Sta. Barbara: |
Portion of Dalongue (SB-D10) |
|
Secondary line maintenance |
Jan 16, 2023 |
Mon |
10:00 am – 12:00 nn |
2 hr |
Calasiao: |
Portion of Mancup (C34-036) |
|
Secondary line maintenance |
Jan 14, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Maningding (SB-192M) |
|
Secondary line maintenance |
Jan 14, 2023 |
Sat |
6:00 am – 12:00 nn |
6 hr |
|
Primary line maintenance |
Jan 13, 2023 |
Fri |
5:00 am – 5:15 am |
15 min |
Calasiao: |
Banaoang, San Vicente, Dinalaoan
and Ambuetel |
|
Primary line maintenance |
7:45 am – 8:00 am |
5:00 am – 8:00 am |
3 hr |
Calasiao: |
San Miguel, Nalsian and portion
Poblacion (Jones St., Malong St., Mamaradlo St., F. Sison St.,
and Bonifacio St.) |
|
Jan 12, 2023 |
Thu |
1:00 pm – 3:00 pm |
2 hr |
Manaoag: |
Portion of Pao (M-3341 to M-3353) and (M-3349 to M-3349W6) |
|
Secondary line maintenance |
Jan 11, 2023 |
Wed |
10:00 am – 12:00 nn |
2 hr |
San Fabian: |
Portion of Bolasi (SF-097W7W3) |
|
Secondary line maintenance |
Jan 10, 2023 |
Tue |
1:00 pm – 3:00 pm |
2 hr |
San Fabian: |
Portion of Lipit Tomeeng (SFB-0493) |
|
Secondary line maintenance |
Jan 10, 2023 |
Tue |
9:00 am – 3:00 pm |
6 hr |
Manaoag: |
Portion of Baritao (M-5466 and
M-5463 to M-5472) |
|
Secondary line maintenance |
Jan 10, 2023 |
Tue |
6:00 am – 7:00 am |
1 hr |
Dagupan City: |
Portion of Caranglaan (Villaflor
Hospital), portion of Mayombo (BHF Mall and City Mall) and
portion of Arellano St. (Region 1 Medical Center and Nepo Mall) |
Calasiao: |
Portion of De Venecia Highway
(Chowking to Ramos Bridge), portion of San Miguel,
portion of Poblacion (Savemore, NLPDC, Fiesta Mall,
Public Market, Police Station and Municipal Hall),
Lasip, portion of Mancup (Mancup Interior), Malabago,
Longos, Nagsaing and Doyong |
San Carlos City: |
Cruz and Bolingit |
|
Primary line maintenance |
Jan 9, 2023 |
Mon |
10:00 am – 1:00 pm |
3 hr |
Calasiao: |
Portion of Mancup (C34-036M to C34-036MW3) |
|
Secondary line maintenance |
Jan 7, 2023 |
Sat |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Lekep Butao (SF-LB23
to SF-LB23W11) |
|
Secondary line maintenance |
Jan 7, 2023 |
Sat |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Inmalog Norte and
portion of Bigbiga |
|
Primary line maintenance |
Dec 22, 2022 |
Thu |
10:00 am – 2:00 pm |
4 hr |
Calasiao: |
Portion of Doyong
(C32-098W20) |
|
Secondary line maintenance |
Dec 21, 2022 |
Wed |
1:30 pm – 3:30 pm |
2 hr |
Sta. Barbara: |
Portion of Patayak (SB-CB63) |
|
Secondary line maintenance |
Dec 20, 2022 |
Wed |
10:00 am – 12:00 nn |
2 hr |
Manaoag: |
Portion of Poblacion (M-1125) |
|
Secondary line maintenance |
Dec 16, 2022 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Rizal St. (Lenox
Hotel, Sterling Bank and Marilao Medical and Diagnostic Clinic) |
|
Primary line maintenance |
Dec 14, 2022 |
Wed |
2:00 pm – 5:00 pm |
3 hr |
Calasiao: |
McArthur Highway, San Miguel (C29-050) |
|
Secondary line maintenance |
Dec 10, 2022 |
Sat |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Calmay - Calmay
Elementary School (D1-048) |
|
Secondary line maintenance |
Dec 10, 2022 |
Sat |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Malued (D27-028) |
|
Secondary line maintenance |
Dec 10, 2022 |
Sat |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Arellano St. (D21-076
to D21-077) |
|
Secondary line maintenance |
Dec 9, 2022 |
Fri |
9:30 am – 3:30 pm |
6 hr |
Sta. Barbara: |
Portion of Poblacion (SB-114) |
|
Secondary line maintenance |
Dec 9, 2022 |
Fri |
8:30 am – 12:30 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (D23-008) |
|
Secondary line maintenance |
Dec 8, 2022 |
Thu |
6:00 am – 12:00 nn |
6 hr |
|
Primary line maintenance |
Dec 7, 2022 |
Wed |
1:30 pm – 3:30 pm |
2 hr |
Sta. Barbara: |
Portion of Poblacion Norte (CSB-127) |
|
Secondary line maintenance |
Dec 7, 2022 |
Wed |
11:00 am – 12:00 nn |
1 hr |
San Fabian: |
Portion of Alacan (SFB-0316) |
|
Secondary line maintenance |
Dec 7, 2022 |
Wed |
11:00 am – 12:00 nn |
1 hr |
San Fabian: |
Portion of Angio (SF-512MX3) |
|
Secondary line maintenance |
Dec 7, 2022 |
Wed |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Aramal (SF-ML33) |
|
Secondary line maintenance |
Dec 5, 2022 |
Mon |
10:00 am – 2:00 pm |
4 hr |
Dagupan City: |
Portion of Mangin (D12-102W2 to D12-102W6) |
|
Secondary line maintenance |
Dec 5, 2022 |
Mon |
10:00 am – 1:00 pm |
3 hr |
Dagupan City: |
Portion of Pantal (D8-F5 to D8-F5W) |
|
Secondary line maintenance |
Dec 2, 2022 |
Fri |
8:30 am – 1:30 pm |
5 hr |
Dagupan City: |
Portion of Bolosan (D12-141W6) |
|
Secondary line maintenance |
Dec 1, 2022 |
Thu |
8:30 am – 1:30 pm |
5 hr |
Dagupan City: |
Portion of Bolosan (D12-133 to D12-137) |
|
Secondary line maintenance |
Dec 1, 2022 |
Thu |
9:00 am – 2:00 pm |
5 hr |
Calasiao: |
Portion of Cabilocaan (C32-119W to C32-119W29) |
|
Secondary line maintenance |
Dec 1, 2022 |
Thu |
6:00 am – 10:00 am |
4 hr |
Dagupan City: |
Portion of Mangin |
|
Primary line maintenance |
Nov 29, 2022 |
Tue |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Cabilocaan (C32-119W) |
|
Primary line maintenance |
Nov 29, 2022 |
Tue |
4:00 am – 5:00 am |
1 hr |
Sta. Barbara: |
OMS SOLAR PLANT (ONLY) at Erfe |
|
Primary line maintenance |
Nov 26, 2022 |
Sat |
9:00 am – 11:00 am |
2 hr |
Calasiao: |
Portion of Nalsian (CL-14MW3) |
|
Secondary line maintenance |
Nov 26, 2022 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of AB Fernandez Ave. (Dagupan Fish Market, Philippine National Bank and Dagupan City Hall) |
|
Primary line maintenance |
Nov 25, 2022 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Sitio Sabangan, Bonuan Gueset (D22-035) |
|
Secondary line maintenance |
Nov 24, 2022 |
Thu |
1:00 pm – 4:30 pm |
3.5 hr |
Calasiao: |
Portion of Bued (C32-102 to C32-102X3) |
|
Secondary line maintenance |
Nov 23, 2022 |
Wed |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Lucao (Millora) |
|
Primary line maintenance |
Nov 22, 2022 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of MacArthur Highway, San Miguel, Calasiao (C29-054) |
|
Secondary line maintenance |
Nov 22, 2022 |
Tue |
9:00 am – 2:00 pm |
5 hr |
Calasiao: |
Portion of Cabilocaan (C32-119W) |
|
Secondary line maintenance |
Nov 19, 2022 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Arellano St. (Dior Village) |
|
Primary line maintenance |
7:00 am – 12:00 nn |
5 hr |
San Fabian: |
Portion of Ambalangan Dalin (Sitio Tandagan) |
|
Nov 18, 2022 |
Fri |
6:00 am – 10:00 am |
4 hr |
Dagupan City: |
Portion of Bacayao Sur (Sitio Tocok) |
|
Nov 16, 2022 |
Wed |
9:30 am – 10:30 am |
1 hr |
San Fabian: |
Portion of Tandagan (SFB0586) |
|
Secondary line maintenance |
Nov 16, 2022 |
Wed |
4:00 am – 4:15 am |
15 min |
Dagupan City: |
Caranglaan, Bacayao Norte, Bacayao Sur, Malued, Pogo Grande, Lasip Grande, portion of Lucao, Mayombo, portion of A.B. Fernandez East, Tebeng, Mangin, Tambac, Bolosan, Mamalingling, Salisay, portion of Arellano St., portion of M.H. Del Pillar St., Herrero and portion of Perez Blvd. |
San Carlos City: |
Cruz and Bolingit |
|
Shifting the power source of DECORP Bacayao Substation and San Fabian Substation from NGCP Balingueo Substation to NGCP Labrador Substation due to NGCP's correction of critical hotspot at Balingueo Substation |
9:00 am – 9:15 am |
15 min |
Shifting back the power source of DECORP Bacayao Substation and San Fabian Substation from NGCP Labrador Substation to NGCP Balingueo Substation |
Nov 15, 2022 |
Tue |
9:00 am – 4:00 pm |
7 hr |
Calasiao: |
Portion of Longos (C34-L62W to C34-L69W5) |
|
Secondary line maintenance |
Nov 14, 2022 |
Mon |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Palapad (SF-FD25) |
|
Secondary line maintenance |
Nov 12, 2022 |
Sat |
6:00 am – 11:00 am |
5 hr |
Calasiao: |
Portion of Nalsian (Chowking to Ramos Bridge) |
|
Primary line maintenance |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Rabon and portion of Bigbiga |
|
Nov 11, 2022 |
Fri |
9:00 am – 3:00 pm |
6 hr |
San Jacinto: |
Portion of Labney (SJ-Y47 to SJ-Y52) |
|
Secondary line maintenance |
Nov 10, 2022 |
Thu |
9:00 am – 4:00 pm |
6 hr |
Dagupan City: |
Portion of Bolosan |
|
Secondary line maintenance |
Nov 9, 2022 |
Wed |
9:00 am – 4:00 pm |
6 hr |
Dagupan City: |
Portion of Bolosan |
|
Secondary line maintenance |
Nov 6, 2022 |
Sun |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Brgy. I, Brgy. II, Brgy. IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, portion of Lasip Grande, Pugaro Suit, Salapingao, Tapuac, portion of Perez Blvd. and De Venecia Hi-way Extension |
|
Shifting back the power source of DECORP Dagupan Substation from NGCP Balingueo Substation to NGCP Labrador Substation |
Nov 5, 2022 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Bonuan Boquig |
|
Primary line maintenance |
6:00 am – 10:00 am |
4 hr |
Dagupan City: |
Portion of Bonuan Blvd.(Cheltrum Gas Station and Arzadon Estate Subd.) |
|
6:00 am – 11:00 am |
5 hr |
Calasiao: |
Portion of Nalsian (Chowking to Ramos Bridge) |
|
Nov 4, 2022 |
Fri |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Brgy. I, Brgy. II, Brgy. IV, Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, portion of Lasip Grande, Pugaro Suit, Salapingao, Tapuac, portion of Perez Blvd. and De Venecia Hi-way Extension
|
|
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to power transformer and power equipment maintenance at NGCP Labrador Substation |
Oct 28, 2022 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Manaoag:  |
Portion of Bucao (M-2236) |
|
Secondary line maintenance |
Oct 27, 2022 |
Thu |
7:00 am – 3:30 pm |
8.5 hr |
San Fabian:  |
Portion of Palapad (SF-FD31 to SF-FD47) |
|
Secondary line maintenance |
Oct 27, 2022 |
Thu |
7:00 am – 3:30 pm |
8.5 hr |
San Fabian:  |
Portion of Palapad (SF-FD31 to SF-FD47) |
|
Secondary line maintenance |
Oct 27, 2022 |
Thu |
6:00 am – 12:00 nn |
6 hr |
San Fabian:  |
Palapad and portion of
Ambalangan Dalin |
|
Primary line extension |
Oct 24, 2022 |
Mon |
6:00 am – 6:15 am |
15 min |
Dagupan: City: |
Brgy. I (Torres Bugallon ), Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, portion of Lasip Grande, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St., Fernandez St., Galvan St.. portion of Perez Blvd. and De Venecia Hi-way Extension |
|
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to APMT and correction of defects of power equipment at Labrador Substation |
Oct 23, 2022 |
Sun |
5:45 am – 6:00 am |
Shifting back the power source of DECORP Substation from NGCP Balingueo Substation to NGCP Labrador Substation |
Oct 22, 2022 |
Sat |
9:00 am – 3:00 pm |
6 hr |
San Jacinto: |
Portion of Labney (near
Elementary School) |
|
Secondary line maintenance |
Oct 22, 2022 |
Sat |
5:00 am – 6:00 am |
1 hr |
San Fabian: |
Portion of Tempra-Guilig, portion of Poblacion, portion of Cayanga, Sagud Bahley, Longos-Amangonan-Parac-Parac Fabrica, Nibaliw Central, Nibaliw East, Nibaliw Magliba, Nibaliw Narvarte, Nibaliw Vidal, Angio, Cabaruan, Anonang, Aramal, Binday, Colisao, Palapad and Ambalangan-Dalin |
|
Shifting the power source of DECORP San Jacinto Substation from NGCP San Manuel Substation to DECORP San Fabian Substation due to upgrading projects at NGCP San Manuel Substation, Installation of LBS at Sapang-Guilig, MG 69kV line and correction of defects along San Manuel-Calasiao 69kV line |
6:30 pm – 7:00 pm |
30 min |
|
Shifting back the power source of DECORP San Jacinto Substation from DECORP San Fabian Substation to NGCP San Manuel Substation |
Oct 21, 2022 |
Fri |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Bacayao Sur, Lasip Grande, and Pogo Grande |
|
Primary line maintenance |
11:45 am – 12:00 nn |
6:00 am – 12:00 nn |
6 hr |
Calasiao: |
Portion of Nalsian (Nalsian-Bacayao) |
Dagupan City: |
Portion of De Venecia Hi-way (from Ancar Motors up to Sphere Car and Auto Accessories), Lasip Chico and Malued |
|
Oct 20, 2022 |
Thu |
9:00 am – 1:00 pm |
4 hr |
Calasiao: |
Portion of Quesban |
|
Secondary line maintenance |
Oct 19, 2022 |
Wed |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Malued (Gaudencio Siapno Rd.) |
|
Primary line maintenance |
Oct 13, 2022 |
Thu |
6:00 am – 11:00 am |
5 hr |
Dagupan City: |
Portion of Bolosan (Arjie Bryan D. Co and Zuellig Pharma Corporation) |
|
Primary line maintenance |
Oct 8, 2022 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Lucao (Dagupan - Binmaley Hi-way, Sitio Domorog and Green Meadow Homes Subd.) |
|
Primary line maintenance |
Oct 6, 2022 |
Thu |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Pogo Chico (Callejon St.) |
|
Oct 1, 2022 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Calasiao: |
Portion of Nalsian (Nalsian-Bacayao) |
|
Primary line maintenance |
Sep 17, 2022 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Bolosan (Bolosan Hi Way) and Mamalingling |
|
Primary line maintenance |
Sep 10, 2022 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Caranglaan, Tebeng,
Mangin and portion of A.B. Fernandez East |
|
Primary line maintenance |
11:45 am – 12:00 nn |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Portion of Tambac, Bolosan,
Salisay and Mamalingling |
|
Sep 9, 2022 |
Fri |
6:00 am – 11:00 am |
5 hr |
Dagupan City:  |
Portion of Bolosan
(Castro-Sarmienta Village) |
|
Primary line maintenance |
Sep 3, 2022 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Manaoag: |
Portion of Sapang (Coastal area) |
|
Primary line maintenance |
Aug 27, 2022 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Herrero and portion of Perez Blvd. (from corner Galvan St. to corner Del Pillar St.) |
|
Primary line maintenance |
10:45 am – 11:00 am |
15 min |
Dagupan City: |
Portion of Herrero, portion of Pogo Chico (Perez Blvd., Zamora St., Zamora Ext., Rizal Ext. and Guilig St.), portion of Brgy IV (Gomez St. and Burgos St.) and portion of Brgy II (Rivera St., portion of Galvan St., and portion of A.B. Fernandez West) |
|
Aug 13, 2022 |
Fri |
5:00 am – 6:00 am |
1 hr |
Calasiao: |
Portion of Mancup (from Power Fill Gasoline Station to Star Fuel Gasoline Station), portion of Buenlag (Woodside Park Subd. and Ridge Town Meadows Subd.) and portion of Malabago (Sitio Antagey) |
|
Primary line maintenance |
5:00 am – 8:00 am |
3 hr |
Calasiao: |
Portion of San Miguel (PNR site and portion of Sitio Parongking) and Talibaew |
|
11:00 am – 12:00 nn |
1 hr |
Calasiao: |
Portion of Mancup (from Power Fill Gasoline Station to Star Fuel Gasoline Station), portion of San Miguel (PNR site and portion of Sitio Parongking), Talibaew, portion of Buenlag (Woodside Park Subd. and Ridge Town Meadows Subd.) and portion of Malabago (Sitio Antagey) |
|
5:00 am – 12:00 nn |
7 hr |
Calasiao: |
Portion of Mancup (after Centrum Fuel Gasoline station to Tiger Ville Subd.) |
|
Aug 5, 2022 |
Fri |
8:30 am – 4:00 pm |
7.5 hr |
San Fabian: |
Portion of Bolaoen and Gumot |
|
Primary line maintenance |
Aug 3, 2022 |
Wed |
9:00 am – 12:00 nn |
3 hr |
|
Primary line maintenance |
Jul 27, 2022 |
Wed |
6:00 am – 11:00 am |
5 hr |
Manaoag: |
Portion of Calaocan (Camp Tito Abat) |
|
Primary line maintenance |
Jul 23, 2022 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Sta. Barbara: |
Portion of Nilombot, Banzal, Erfe and portion of Leet. |
|
Primary line maintenance |
Jul 22, 2022 |
Fri |
5:00 am – 6:00 am |
1 hr |
Manaoag: |
Portion of Babasit, portion of Poblacion (Soriano St., Tiong St., Galaban St. and Aquino St.) Baritao, San Ramon, Mermer, Pantal, Licsi, Tebuel, Nalsian, Cabanbanan, Oraan East, Oraan West, Lelemaan, Inamotan, Baguinay, Matolong and Parian |
|
Primary line maintenance |
9:00 am – 10:00 am |
5:00 am – 10:00 am |
5 hr |
Manaoag: |
Portion of Poblacion (Castro St.) |
|
Jul 20, 2022 |
Wed |
6:00 am – 1:00 am |
5 hr |
Manaoag: |
Portion of Calaocan (Camp Tito Abat) |
|
Primary line maintenance |
Jul 15, 2022 |
Fri |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Bolasi (Lateral Rd. going to PTA) |
|
Primary line maintenance |
Jul 14, 2022 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Longos Proper |
|
Primary line maintenance |
9:00 am – 12:00 nn |
3 hr |
|
Jul 13, 2022 |
Wed |
8:00 am – 11:00 am |
3 hr |
Dagupan City: |
Portion of De Venecia Hi Way (Lateral Rd. going to Claveria Rd. |
|
Primary line maintenance |
8:00 am – 12:00 nn |
4 hr |
Sta, Barbara: |
Portion of Banaoang and portion of Leet (Leet West) |
|
Jul 9, 2022 |
Sat |
5:00 am – 6:00 am |
1 hr |
San Fabian: |
Portion of Poblacion (Caballero St., Osmena St. and Rizal St.) Lekep-Botao, Longos Proper and Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line maintenance |
10:00 am – 11:00 am |
1 hr |
5:00 am – 11:00 am |
6 hr |
San Fabian: |
Portion of Poblacion (Alvear St., Sevidal St. and Erfe St.) |
|
Jul 6, 2022 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Bonuan Binloc |
|
Primary line maintenance |
Jul 2, 2022 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Manaoag: |
Portion of Bubasit and portion of Pugaro |
|
Primary line maintenance |
Jun 28, 2022 |
Tue |
9:00 am – 15:00 pm |
6 hr |
|
Jun 24, 2022 |
Fri |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Ambalangan Dalin |
|
Primary line maintenance |
1:30 pm – 4:30 pm |
3 hr |
Sta Barbara: |
Portion of Tebag West (Tebag-Botao Rd.) and Botao |
|
Jun 18, 2022 |
Sat |
8:30 am – 12:00 nn |
3.5 hr |
San Fabian: |
Portion of Rabon and portion of Bigbiga |
|
Primary line maintenance |
1:30 pm – 3:30 pm |
2 hr |
San Fabian: |
Portion of Inmalog Norte and portion of Bigbiga |
|
Jun 11, 2022 |
Sat |
8:00 am – 12:00 nn |
4 hr |
|
Primary line maintenance |
Jun 1, 2022 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Bonuan Binloc |
|
Primary line maintenance |
May 25, 2022 |
Wed |
9:00 am – 2:00 pm |
5 hr |
Dagupan City: |
Portion of Malued (Claveria Road) |
|
Primary line maintenance |
May 21, 2022 |
Sat |
4:00 am – 4:15 am |
15 min |
Dagupan City: |
Caranglaan, Bacayao Norte, Mayombo, AB Fernandez East, Tebeng, Mangin, Tambac, Bolosan, Mamalingling, Salisay, portion of Arellano, M.H. Del Pillar St., Herrero, portion of Perez Blvd., Lasip Grande, Pogo Grande, Malued, Lasip Chico, Bacayao Sur and portion of De Venecia Highway |
San Carlos City: |
Cruz and Bolingit |
|
Shifting the power source of DECORP Bacayao Substation and San Fabian Substation from NGCP Balingueo Substation to NGCP Labrador Substation due to DPWH bridge widening project |
9:00 am – 9:15 am |
15 min |
Shifting back the power source of DECORP Bacayao Substation and San Fabian Substation from NGCP Labrador Substation to NGCP Balingueo Substation |
May 21, 2022 |
Sat |
4:15 am – 5:00 am |
45 min |
Sta Barbara: |
Sonquil, Bengal, Payas, Carusucan, Patayak and Cablong |
|
Primary line maintenance |
9:15 am – 10:00 am |
45 min |
4:15 am – 10:00 am |
5.75 hr |
Sta Barbara: |
Portion of Sapang, portion of Maronong and portion of Balingueo |
|
May 18, 2022 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Calaocan, Sapang, Pao, Lipit Sur, Lipit Norte and Pugaro (Lipit Pugaro) |
|
Primary line maintenance |
April 8, 2022 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Ambalangan Dalin (Sitio Bisbisucol and Sitio Mamatao) |
|
Primary line maintenance |
March 26, 2022 |
Sat |
6:00 am – 6:30 am |
30 min |
|
Shifting the power source of DECORP San Jacinto Substation from NGCP San Manuel Substation to NGCP Balingueo Substation due to NGCP's upgrading projects, installation of load break switch (LBS) at Sapang – Guilig 69 kV line and correction of defects at San Manuel – Sapang – Urdaneta 69kV line |
March 26, 2022 |
Sat |
5:30 pm – 6:00 pm |
30 min |
|
Shifting back power source of DECORP San Jacinto Substation from NGCP Balingueo Substation to NGCP San Manuel Substation |
March 5, 2022 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Caranglaan(PNR Site) and portion of Mayombo(Sition Puelay) |
Sta. Barbara: |
Portion of Poblacion |
|
Primary line maintenance |
March 4, 2022 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Palapad |
|
Primary line maintenance |
March 3, 2022 |
Thu |
8:30 am – 11:30 am |
3 hr |
San Fabian: |
Portion of Cabaruan |
|
Primary line maintenance |
February 26, 2022 |
Sat |
5:45 am – 6:00 am |
15 min |
Dagupan City: |
Caranglaan, Bacayao Norte, Bacayao Sur, Malued, Pogo Grande, Lasip Grande, portion of Lucao, Mayombo, portion of AB Fernandez East, Tebeng, Mangin, Tambac, Bolosan, Mamalingling, Salisay, portion of Arellano, portion of M.H. Del Pillar st., Herrero and portion of Perez Blvd. |
San Carlos City: |
Cruz and Bolingit |
|
Shifting the power source of DECORP Bacayao Substation and San Fabian Substation from NGCP Balingueo Substation to NGCP Labrador Substation due to NGCP's Annual Preventive Maintenance of 100MVA Power Transformer and correction of power equipment defects at Balingueo Substation. |
February 26, 2022 |
Sat |
6:00 pm – 6:30 pm |
30 min |
Shifting back the power source of DECORP Bacayao Substation and San Fabian Substation from NGCP Labrador Substation to NGCP Balingueo Substation |
February 26, 2022 |
Sat |
10:00 am – 11:00 am |
1 hr |
Sta Barbara: |
Ventinilla, Maningding, Primicias, Nilombot, Banzal and Erfe |
|
Primary line maintenance |
February 26, 2022 |
Sat |
6:00 am – 11:00 am |
5 hr |
Sta Barbara: |
Banaoang, Maticmatic, Tebag East, Tebag West, Minien East, Minien West, Botao and Leet |
|
Primary line maintenance |
February 19, 2022 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Manaoag: |
Portion of Lipit Norte (Sitio Dilan) |
|
Primary line maintenance |
1:00 pm – 4:00 pm |
3 hr |
San Fabian |
Portion of Rabon |
|
Primary line maintenance |
February 12, 2022 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Tambac, AB Fernandez East, Bolosan, Mamalingling and Salisay |
|
Primary line maintenance |
8:45 am – 9:00 am |
15 min |
Dagupan City: |
Portion of Tambac, AB Fernandez East, Bolosan, Mamalingling, Salisay, AB Fernandez Ave., Fernandez St., Rizal St., portion of Arellano and portion of M.H. Del Pilar St. |
|
Primary line maintenance |
6:00 am – 9:00 am |
3 hr |
Dagupan City:  |
Portion of Caralanglaan (PRN Site), Tebeng and Mangin |
|
Primary line maintenance |
February 10, 2022 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Inmalog Norte and Inmalog Sur |
|
Primary line maintenance |
February 6 , 2022 |
Sun |
6:00 am – 6:30 am |
30 min |
|
Shifting the power source of DECORP San Jacinto Substation from NGCP San Manuel Substation to NGCP Balingueo Substation due to NGCP's Annual Preventive Maintenance of 100MVA Power Transformer at San Manuel Substation and correction of various defects at San Manuel - Sapang - Urdaneta 69kV line |
February 6, 2022 |
Sun |
5:30 pm – 6:00 pm |
30 min |
|
Shifting back the power source of DECORP San Jacinto Substation from NGCP Balingueo Substation to NGCP San Manuel Substation |
February 4, 2022 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Macayug (Sitio Boquig) |
|
Primary line maintenance |
February 2, 2022 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Gabon (Tamayo Rd.) |
|
Primary line maintenance |
January 30, 2022 |
Sun |
6:00 am – 6:30 am |
30 min |
|
Shifting the power source of DECORP San Jacinto Substation from NGCP San Manuel Substation to NGCP Balingueo Substation due to NGCP's Annual Preventive Maintenance of 100MVA Power Transformer at San Manuel Substation and correction of various defects at San Manuel - Sapang - Urdaneta 69kV line |
January 30, 2022 |
Sun |
5:30 pm – 6:00 pm |
30 min |
|
Shifting back the power source of DECORP San Jacinto Substation from NGCP Balingueo Substation to NGCP San Manuel Substation |
January 29, 2022 |
Sat |
6:00 am – 9:00 am |
3 hr |
Dagupan City: |
Portion of Bonuan Boquig (Pasiliao St., San Gabriel St., Bisal St., Sta. Maria St. and Sitio Watak) |
|
Primary line maintenance |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Tapuac (Greenfields Subdivision) |
|
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Inmalog Norte and portion of Bigbiga |
|
January 25, 2022 |
Tue |
7:00 am – 10:00 am |
3 hr |
Sta Barbara: |
Portion of Leet |
|
Primary line maintenance |
January 22, 2022 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Sta Barbara: |
Portion of Tebag West (Lateral road going to Tebag Elementary School) |
|
Primary line maintenance |
January 20, 2022 |
Thu |
7:00 am – 12:00 nn |
5 hr |
Sta Barbara: |
Portion of Ventinilla (Lateral road beside old Municipal Hall) |
|
Primary line maintenance |
January 19, 2022 |
Wed |
7:00 am – 12:00 nn |
5 hr |
Sta Barbara: |
Portion of Leet and portion of Banaoang (Lateral road going to Leet-Banaoang Bridge) |
|
Primary line maintenance |
January 15, 2022 |
Sat |
8:00 am – 11:00 am |
3 hr |
San Fabian: |
Portion of Nibaliw Vidal (Coastal Area) |
|
Primary line maintenance |
9:00 am – 5:00 pm |
8 hr |
San Fabian: |
Portion of Inmalog Norte and portion of Bigbiga |
|
January 13, 2022 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Leet (Phase III) |
|
Primary line maintenance |
January 12, 2022 |
Wed |
9:00 am – 3:00 pm |
6 hr |
Calasiao: |
Portion of Buenlag (Sitio Walang) |
|
Primary line maintenance |
December 24, 2021 |
Fri |
6:00 am – 6:30 am |
30 min |
Dagupan City: |
Brgy. I (Torres Bugallon), Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St., Fernandez St., Galvan St., portion of Perez Blvd., and De Venecia Highway Extension |
|
Shifting back the power source of DECORP Dagupan Substation from NGCP Balingueo Substation to NGCP Labrador Substation |
December 23, 2021 |
Thu |
6:00 am – 6:30 am |
30 min |
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to Annual Preventive Maintenance of 100MVA Power Transformer and correction of defects of power equipment at NGCP Labrador Substation |
December 20, 2021 |
Mon |
6:00 am – 6:30 am |
30 min |
Dagupan City: |
Brgy. I (Torres Bugallon), Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St., Fernandez St., Galvan St., portion of Perez Blvd., and De Venecia Highway Extension |
|
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to Annual Preventive Maintenance of 100MVA Power Transformer and correction of defects of power equipment at NGCP Labrador Substation |
December 19, 2021 |
Sun |
6:00 am – 6:30 am |
30 min |
Shifting back the power source of DECORP Dagupan Substation from NGCP Balingueo Substation to NGCP Labrador Substation |
December 14, 2021 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Lucao (Nel-Ars Subdivision) |
|
Primary line maintenance |
December 11, 2021 |
Sat |
6:00 am – 6:30 am |
30 min |
|
Shifting the power source of DECORP San Jacinto Substation from NGCP San Manuel Substation to NGCP Balingueo Substation due to implementation of various upgrading projects in NGCP's San Manuel Substation |
December 11, 2021 |
Sat |
5:30 pm – 6:00 pm |
30 min |
Shifting back the power source of DECORP San Jacinto Substation from NGCP Balingueo Substation to NGCP San Manuel Substation |
December 11, 2021 |
Sat |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Inmalog Norte and portion of Bigbiga |
|
Primary line maintenance |
December 9, 2021 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (Bagong Barrio) |
|
Primary line maintenance |
December 4, 2021 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Portion of Bonuan Gueset
(Maligaya St.) |
|
Primary line maintenance |
November 28, 2021 |
Sun |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
Brgy. I (Torres Bugallon), Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St., Fernandez St., Galvan St., portion of Perez Blvd., and De Venecia Highway Extension |
|
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to Annual Preventive Maintenance of T3 Power Equipment and Secondary Devices |
November 28, 2021 |
Sun |
6:00 pm – 6:30 pm |
30 min |
Shifting back the power source of DECORP Dagupan Substation from NGCP Balingueo Substation to NGCP Labrador Substation |
November 26, 2021 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Inmalog Norte and portion of Bigbiga |
|
Primary line maintenance |
November 25, 2021 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Lepet-Tomeeng |
|
Primary line maintenance |
November 23, 2021 |
Tue |
6:00 am – 10:00 am |
4 hr |
|
Primary line maintenance |
November 20, 2021 |
Sat |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Bacayao Norte (Bayanihan Subdivision) |
|
Primary line maintenance |
November 17, 2021 |
Wed |
5:00 am – 6:00 am |
1 hr |
San Fabian: |
Portion of Cayanga, Longos, Longos-Amangonan-Parac-Parac Fabrica and Longos Proper |
|
Primary line maintenance |
12:00 nn – 1:00 pm |
1 hr |
November 13, 2021 |
Sat |
5:00 am – 6:00 am |
1 hr |
San Fabian: |
Portion of Cayanga, Longos, Longos-Amangonan-Parac-Parac Fabrica and Longos Proper |
|
Primary line maintenance |
12:00 nn – 1:00 pm |
1 hr |
7:00 am – 12:00 nn |
5 hr |
Calasiao: |
Portion of Buenlag (Merryland Subdivision) |
|
9:00 am – 5:00 pm |
8 hr |
San Fabian: |
Portion of Inmalog Norte and portion of Bigbiga |
|
November 11, 2021 |
Thu |
2:00 am – 3:00 am |
1 hr |
Calasiao: |
Portion of Nalsian (Sitio Nalsian-Bacayao) |
Dagupan City: |
Portion of AB Fernandez West, Lucao, Bacayao Sur, Malued, Lasip Grande, Pogo Grande, Lasip Chico and Pogo Chico |
|
Primary line maintenance |
7:00 am – 8:00 am |
1 hr |
2:00 am – 8:00 am |
6 hr |
Dagupan City: |
Portion of De Venecia Highway |
|
November 6, 2021 |
Sat |
2:00 am – 3:00 am |
1 hr |
Calasiao: |
Portion of Buenlag (Woodside Park Subd. and Ridge Town Meadows Subd.) and portion of Malabago (Sitio Antagey) |
|
Primary line maintenance |
6:00 am – 7:00 am |
1 hr |
2:00 am – 7:00 am |
5 hr |
Calasiao: |
Portion of San Miguel (PNR site and portion of Sitio Parongking), Talibaew and Mancup. |
|
November 4, 2021 |
Thu |
4:00 am – 8:00 am |
4 hr |
San Fabian: |
Portion of Tiblong, Bigbiga and Rabon |
|
Primary line maintenance |
October 30, 2021 |
Sat |
5:00 am – 12:00 nn |
7 hr |
Sta. Barbara: |
Portion of Maningding (Maningding Old Road) |
|
Primary line maintenance |
October 23, 2021 |
Sat |
4:00 am – 4:45 am |
45 min |
San Carlos City: |
Cruz and Bolingit |
|
Maintenance of 69 kV metering of DECORP Bacayao Substation |
7:15 am – 8:00 am |
45 min |
October 16, 2021 |
Sat |
6:00 am – 12:00 nn |
6 hr |
Sta. Barbara: |
Portion of Primicias, Nilombot, Banzal and Erfe |
|
Primary line maintenance |
October 9, 2021 |
Sat |
6:00 am – 7:00 am |
1 hr |
|
Shifting the power source of DECORP San Jacinto Substation from NGCP San Manuel Substation to NGCP Balingueo Substation due to upgrading project at San Manuel Substation |
October 9, 2021 |
Sat |
9:30 am – 10:00 am |
30 min |
|
Shifting back the power source of San Jacinto Substation from NGCP Balingueo Substation to NGCP San Manuel Substation |
October 9, 2021 |
Sat |
6:00 am – 11:00 am |
5 hr |
Manaoag: |
Portion of Lipit Norte (Sitio Dilan) |
|
Primary line maintenance |
October 8, 2021 |
Fri |
4:00 am – 5:00 am |
1 hr |
San Fabian: |
Poblacion, Cayanga, Longos, Longos proper and portion of Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line maintenance |
7:00 am – 8:00 am |
1 hr |
4:00 am – 8:00 am |
4 hr |
San Fabian: |
Portion of Porblacion (Pinlac St.), portion of Cayanga (PNR site and lateral road going to Public Market) and Lekep-Botao |
|
October 2, 2021 |
Sat |
7:00 am – 10:00 am |
3 hr |
Sta. Barbara: |
Portion of Primicias |
|
Primary line maintenance |
September 25, 2021 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan. City: |
Brgy. I (Torres Bugallon), Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St., Fernandez St., Galvan St., portion of Perez Blvd., and De Venecia Highway Extension |
|
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to reconfiguration of 69kV pole structure at Naguilayan, Binmaley |
September 25, 2021 |
Sat |
11:45 am – 12:00 nn |
15 min |
Shifting back the power source of DECORP Dagupan Substation from NGCP Balingueo Substation to NGCP Labrador Substation |
September 16, 2021 |
Thu |
8:00 am – 10:00 am |
2 hr |
Sta. Barbara: |
Portion of Leet (BANERLE Rd) |
|
Construction of 69kV line |
10:00 am – 12:00 nn |
2 hr |
Sta. Barbara: |
Portion of Leet (Phase III) |
|
September 10, 2021 |
Fri |
9:00 am – 3:00 pm |
6 hr |
Dagupan City: |
Portion of Bonuan Boquig (Sitio Palatong) |
|
Primary line maintenance |
September 4, 2021 |
Sat |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Palapad |
|
Primary line maintenance |
10:00 am – 12:00 nn |
2 hr |
San Jacinto: |
Portion of Labney (Sitio Inabaan) |
|
10:00 am – 3:00 pm |
5 hr |
San Jacinto: |
Portion of Bolo (Sitio Calomboyan) |
|
September 3, 2021 |
Fri |
1:30 pm – 4:30 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Boquig (Pasilio St., San Gabriel St., Sta. Maria St., Bisal St., Bonuan Longos and Sitio Watak) |
|
Primary line maintenance |
August 22, 2021 |
Sun |
5:30 am – 6:00 am |
30 min |
Dagupan City: |
Brgy. I (Torres Bugallon), Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St., Fernandez St., Galvan St., portion of Perez Blvd., and De Venecia Highway Extension |
|
Shifting the power source of DECORP Dagupan Substation from NGCP Labrador Substation to NGCP Balingueo Substation due to NGCP's hotspot correction |
August 22, 2021 |
Sun |
8:00 am – 8:30 am |
30 min |
Shifting back the power source of DECORP Dagupan Substation from NGCP Balingueo Substation to NGCP Labrador Substation |
August 21, 2021 |
Sat |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Inmalog Sur and portion of Inmalog Norte |
|
Primary line maintenance |
August 20, 2021 |
Fri |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Gomot and Bolaoen |
|
Primary line maintenance |
August 13, 2021 |
Fri |
8:45 am – 9:00 am |
15 min |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line maintenance |
August 7, 2021 |
Sat |
6:30 am – 7:00 am |
30 min |
|
Scheduled interruption of National Grid Corporation of the Philippines for the opening of ABS at Binalonan I S/S for the tapping of new Power Circuit Breaker to 69kV line and retrieval of the existing 69kV Power Fuse |
August 6, 2021 |
Fri |
8:45 am – 9:00 am |
15 min |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line maintenance |
July 31, 2021 |
Sat |
6:30 am – 7:00 am |
30 min |
|
Upgrading of 69kV line protection of Urdaneta I Substation by the National Grid Corporation of the Philippines |
3:45 pm – 4:00 pm |
15 min |
July 31, 2021 |
Sat |
5:00 am – 8:00 am |
3 hr |
Sta. Barbara: |
Malanay, Gueguesangen, Tuliao and Alibago |
Calasiao: |
Portion of Bued, Cabilocaan, Ambonao, and portion of San Miguel |
|
Primary line maintenance |
9:00 am – 3:00 pm |
6 hr |
San Carlos City: |
Portion of Bolingit (Palaris Housing) |
|
July 29, 2021 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Rabon |
|
Primary line maintenance |
July 24, 2021 |
Sat |
5:00 am – 6:00 am |
1 hr |
Sta. Barbara: |
Poblacion Norte, Poblacion Sur, Maningding and Dalongue |
|
Primary line maintenance |
7:45 am – 8:00 am |
15 min |
5:00 am – 8:00 am |
3 hr |
Sta. Barbara: |
Malanay, Gueguesangen, Tuliao and Alibago |
Calasiao: |
Portion of Bued, Cabilocaan, portion of Ambonao and portion of San Miguel |
|
July 23, 2021 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Rabon |
|
Primary line maintenance |
July 22, 2021 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Awal, San Jacinto |
|
Primary line maintenance |
Santa Barbara: |
Portion of Minien West (Villa Lopez and Camella Heights Subdivision) |
|
1:30 pm – 4:30 pm |
3 hr |
Dagupan City: |
Portion of Carael (Sitio Talaib and Sitio Tocok) |
|
July 16, 2021 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Arellano St. (Dior Village) |
|
Primary line maintenance |
July 15, 2021 |
Thu |
1:30 pm – 4:30 pm |
3 hr |
San Fabian: |
Portion of Lekep-Botao |
|
Primary line maintenance |
July 14, 2021 |
Wed |
8:30 am – 12:00 nn |
3.5 hr |
Dagupan City: |
Portion of Arellano St. (Sunrise Subdivision) |
|
Primary line maintenance |
9:00 am – 9:30 am |
30 min |
San Fabian: |
Portion of Tempra-Guilig, Poblacion, Cayanga, Longos, Longos Proper, Longos-Amangonan-Parac-Parac Fabrica, Lekep-Botao, Sagud Bahley, Nibaliw Central, Nibaliw East, Nibaliw Magliba, Nibaliw Narvarte, Nibaliw Vidal, Angio, Aramal, Anonang, Binday, Colisao, Palapad, and Ambalangan-Dalin. |
|
July 3, 2021 |
Sat |
6:00 am – 6:15 am |
15 min |
San Jacinto: |
All areas |
Manaoag: |
All areas |
San Fabian: |
Poblacion, Tempra-Guilig, Lekep-Butao, Cayanga, Sagud-Bahley, Nibaliw Central, Nibaliw East, Nibaliw Magliba, Nibaliw Narvarte, Nibaliw Vidal, Longos, Longos Proper, Longos-Amangonan-Parac-Parac Fabrica, Cabaruan, Anonang, Anglo, Aramal, Binday, Palapad and Colisao. |
|
Primary line maintenance |
5:00 pm – 6:00 pm |
1 hr |
San Jacinto: |
All areas |
Manaoag: |
All areas |
|
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Portion of Bolaoan |
|
July 2, 2021 |
Fri |
4:00 am – 4:15 am |
15 min |
San Fabian: |
Cabaruan, Anonang, Angio, Aramal, Binday, Palapad and Colisao |
|
Primary line maintenance |
9:45 am – 10:00 am |
15 min |
4:00 am – 5:00 am |
1 hr |
San Fabian: |
Poblacion, Lekep-Butao, Cayanga, Sagud-Bahley, Nibaliw Central, Nibaliw East, Nibaliw Magliba, Nibaliw Narvarte, Nibaliw Vidal, Longos, Longos Proper and Longos-Amangonan-Parac-Parac Fabrica |
|
9:00 am – 10:00 am |
1 hr |
9:00 am – 9:15 am |
15 min |
Dagupan City: |
Portion of Bonuan Boquig |
|
4:00 am – 10:00 am |
6 hr |
San Fabian: |
Portion of Poblacion (Espejo St., Rizal St., Erfe St., Sison St., and Caballero St.) and portion of Tempra Guilig |
|
July 1, 2021 |
Thu |
5:00 am – 5:15 am |
15 min |
|
Primary line maintenance |
7:45 am – 8:00 am |
15 min |
5:15 am – 7:45 am |
2.5 hr |
San Fabian: |
Portion of Tempra-Guilig, Sobol, Bolasi, Tocok, Mabilao, Alacan, Tiblong, Rabon, Lipit-Tomeeng, Inmalog Sur, Inmalog Norte, Bigbiga, Gomot and Bolaoen |
|
June 26, 2021 |
Sat |
6:00 am – 12:00 nn |
6 hr |
San Jacinto: |
Portion of Lobong, Labney, Bolo and Sta. Cruz |
|
Primary line maintenance |
8:45 am – 9:15 am |
30 min |
|
June 24,2021 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Mabilao |
|
Primary line maintenance |
June 19, 2021 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Santa Barbara: |
Portion of Nilombot (Sitio Kaging) |
|
Primary line maintenance |
June 18, 2021 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Manaoag: |
Portion of Cabanbanan (Castillo St.) and Oraan East |
|
Primary line maintenance |
June 17, 2021 |
Thu |
6:00 am – 11:00 am |
5 hr |
Manaoag: |
Portion of Poblacion (Llamido St. and Mendoza St.)
|
|
Primary line maintenance |
June 10, 2021 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Rabon |
|
Primary line maintenance |
June 3, 2021 |
Thu |
8:30 am – 11:30 am |
3 hr |
Sta. Barbara: |
Portion of Leet (BANERLE Rd.) |
|
Construction of 69kV line |
May 29, 2021 |
Sat |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Leet (Phase III) |
|
Construction of 69kV line |
May 27, 2021 |
Thu |
6:00 am – 7:00 am |
1 hr |
|
PANELCO III to implement tapping at Binalonan Substation and energization of its new Binalonan – Pozorrubio 69 kV Line – NGCP |
May 22, 2021 |
Sat |
6:45 am – 7:00 am |
15 min |
Dagupan City: |
Portion of De Venecia Highway Ext., portion of Arellano St., Bonuan Gueset, Bonuan Boquig and Bonuan Binloc |
|
Primary line revamp |
May 20, 2021 |
Thu |
5:00 am – 9:00 am |
4 hr |
San Jacinto: |
Portion of Macayug (Sitio Kamanggaan) |
|
Primary line revamp |
May 18, 2021 |
Tue |
5:00 am – 5:15 am |
15 min |
San Fabian: |
Cabaruan, Angio, portion of Tempra-Guilig, portion of Poblacion, Nibaliw East, Cayanga, Sagud Bahley, Nibaliw Narvarte, Nibaliw Central and Nibaliw Vidal |
|
Primary line revamp |
6:45 am – 7:00 am |
5:00 am – 7:00 am |
2 hr |
San Fabian: |
Sobol, Tocok, Bolasi, Mabilao, Alacan, Tiblong, Rabon, Lipit Tomeeng, Inmalog Sur, Inmalog Norte, Bigbiga, and Bolaoen |
|
May 16, 2021 |
Sun |
7:00 am – 8:00 am |
1 hr |
San Fabian: |
All areas |
San Jacinto: |
All areas |
Manaoag: |
All areas |
|
To implement NGCP's real-time monitoring and control equipment project at Binalonan substation |
4:00 pm – 5:00 pm |
1 hr |
May 14, 2021 |
Fri |
5:00 am – 9:00 am |
4 hr |
Dagupan City: |
Portion of Calmay, Lomboy, Salapingao, and Pugaro Suit |
|
Primary line revamp |
May 12, 2021 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Lipit Tomeeng |
|
Primary line extension |
May 8, 2021 |
Sat |
5:00 am – 11:00 am |
6 hr |
Calasiao: |
Portion of Talibaew (Sitio Katuray and Sitio Binco) |
|
Primary line revamp |
May 5, 2021 |
Wed |
Primary line revamp |
May 4, 2021 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Alibago |
|
Primary line revamp |
April 30, 2021 |
Fri |
5:00 am – 10:00 am |
5 hr |
San Fabian: |
Longos Proper and portion of Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line revamp |
April 28, 2021 |
Wed |
1:00 am – 1:15 am |
15 min |
Dagupan City: |
Portion of Arellano St., Bonuan Gueset, Bonuan Boquig, and Bonuan Binloc |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line revamp |
7:45 am – 8:00 am |
15 min |
1:00 am – 8:00 am |
7 hr |
Dagupan City: |
Portion of De Venecia Highway Ext. (Pantal side) and portion of Pantal (Patalan and Sitio Guibang) |
|
April 27, 2021 |
Tue |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Nibaliw Narvarte (Sitio Sungyot) |
|
Primary line extension |
April 24, 2021 |
Sat |
1:00 am – 1:15 am |
15 min |
Dagupan City: |
Portion of De Venecia Highway Ext., and portion of Pantal (Sitio Guibang) |
|
Primary line revamp |
1:00 am – 2:00 am |
1 hr |
Dagupan City: |
Bonuan Gueset, Bonuan Boquig, Bonuan Binloc, Nepo Mall, BHF Mall, City Mall-Mayombo, R1MC & Villaflor Hospitals |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac Fabrica |
Calasiao: |
Portion of San Miguel (Cardozo Rice Mill) |
|
7:00 am – 8:00 am |
1 hr |
Dagupan City: |
Bonuan Gueset, Bonuan Boquig, and Bonuan Binloc |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac Fabrica |
|
7:00 am – 7:15 am |
15 min |
San Fabian: |
Portion of Cayanga, Longos, Longos Proper and Longos-Amangonan-Parac-Parac Fabrica |
|
7:45 am – 8:00 am |
15 min |
Dagupan City: |
Portion of De Venecia Highway Ext., and portion of Pantal (Sitio Guibang) |
|
1:00 am – 8:00 am |
7 hr |
Dagupan City: |
Portion of Arellano St. (from Colegio de Dagupan old bldg. to Silverios Restaurant) |
|
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Carael (Sitio Talaib and Sitio Tocok) |
|
April 22, 2021 |
Thu |
1:00 am – 2:00 am |
1 hr |
Dagupan City: |
Portion of De Venecia Highway Ext., portion of Pantal (Sitio Guibang), portion of Arellano St., Bonuan Gueset, Bonuan Boquig, and Bonuan Binloc |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac Fabrica |
|
Primary line revamp |
7:00 am – 8:00 am |
1 hr |
7:00 am – 7:15 am |
15 min |
San Fabian: |
Portion of Cayanga, Longos, Longos Proper, and Longos-Amangonan-Parac-Parac Fabrica |
|
1:00 am – 8:00 am |
7 hr |
Dagupan City: |
Portion of Bonuan Gueset (from Tanap bridge to Bartolome Ceralde St. |
|
April 16, 2021 |
Fri |
4:00 am – 7:00 am |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (Las Vegas St. and Sabangan) |
|
Pole erection of 69kV |
March 27, 2021 |
Sat |
6:00 am – 6:30 am |
30 min |
Manaoag: |
Portion of Pao, Lipit Sur and Lipit Norte |
|
Primary line revamp |
9:30 am – 10:00 am |
30 min |
6:00 am – 10:00 am |
4 hr |
Manaoag: |
Portion of Lipit Norte (Sitio Dilan) |
|
March 24, 2021 |
Wed |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Lipit Tomeeng |
|
Primary line extension |
1:30 pm – 3:30 pm |
2 hr |
San Jacinto: |
Portion of San Vicente (Sitio Lumbaan) |
|
Primary line revamp |
March 20, 2021 |
Sat |
8:00 am – 8:15 am |
15 min |
|
Shifting the power source of DECORP
San Jacinto Substation from NGCP San Manuel Substation to NGCP
Balingueo Substation due to PANELCO III's erection of tapping pole of 69kV line at Binalonan
Substation I going to Pozzorubio Substation and replacement of 69kV lightning arrester at Binalonan Substation II |
1:45 pm – 2:00 pm |
15 min |
Shifting back the power source of DECORP
San Jacinto Substation from NGCP Balingueo Substation to NGCP
San Manuel Substation |
March 12, 2021 |
Fri |
2:00 am – 2:15 am |
15 min |
Dagupan City: |
Herrero St., Nable St., portion of Pantal and portion of A.B. Fernandez Ave. |
|
Primary line revamp |
6:45 am – 7:00 am |
2:00 am – 7:00 am |
5 hr |
Dagupan City: |
Galvan St., Nueva St. and portion of Fernandez St. |
|
March 6, 2021 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Pantal (Sitio Guilbang), portion of De Venecia Highway Extension, portion of Arellano St.,
Bonuan Gueset, Bonuan Binloc and Bonuan Boquig |
|
Primary line revamp |
6:00 am – 9:00 am |
3 hr |
Calasiao:  |
Portion of Bued (Rusela Heights Subdivision) |
|
March 5, 2021 |
Fri |
8:30 am – 2:30 pm |
6 hr |
Dagupan City: |
Portion of Arellano St. (Lateral road beside Alimango) |
|
Primary line extension |
February 27, 2021 |
Sat |
12:00 mn – 12:30 am |
30 min |
San Carlos City: |
All areas |
|
Maintenance of 69 kV metering of Bacayao Substation |
7:30 am – 8:00 am |
30 min |
February 25, 2021 |
Thu |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Pantal (Sitio Guibang), portion
of De Venecia Highway Extension, portion of Arellano St.,
Bonuan Gueset, Bonuan Boquig, and Bonuan Binloc |
|
Primary line load splitting |
6:00 am – 6:15 am |
15 min |
Calasiao: |
Malabago, Longos, Doyong and Nagsaing |
|
Primary line extension |
7:45 am – 8:00 am |
15 min |
6:00 am – 8:00 am |
2 hr |
San Carlos City: |
Cruz and Bolingit |
|
February 20, 2021 |
Sat |
5:00 am – 9:00 am |
4 hr |
Dagupan City: |
Bonuan Boquig |
|
Primary line revamp |
8:30 am – 2:30 pm |
6 hr |
Calasiao:  |
Portion of Bued (Rusela Heights Subdivision) |
|
Primary line extension |
February 19, 2021 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of Sta. Cruz and Bolo |
|
Primary line extension |
February 6, 2021 |
Sat |
6:00 am – 4:00 pm |
10 hr |
San Fabian: |
Portion of Longos Parac-Parac, portion of Longos Central and Longos Proper |
|
Primary line extension |
8:30 am – 4:30 pm |
8 hr |
San. Fabian:  |
Portion of Colisao and portion of Ambalangan Dalin |
|
February 5, 2021 |
Fri |
9:00 am – 4:00 pm |
7 hr |
|
Primary line extension |
January 30, 2021 |
Sat |
4:00 am – 4:15 am |
15 min |
Sta. Barbara: |
Portion of Ventinilla and Maningding |
|
Relocation of primary poles due to DPWH road
widening project |
8:45 am – 9:00 am |
15 min |
4:00 am – 9:00 am |
5 hr |
Sta. Barbara:  |
Banaoang, Primicias, portion of Nilombot,
Banzal, Erfe, Leet, Maticmatic, Botao, Tebag West, Tebag East,
Minien West and Minien East |
|
January 24, 2021 |
Sun |
6:00 am – 6:15 am |
15 min |
|
Shifting the power source of DECORP
San Jacinto Substation from NGCP San Manuel Substation to NGCP
Balingueo Substation due to NGCP's Annual Preventive Maintenance of 100MVA
Power Transformer at San Manuel Substation |
5:45 pm – 6:00 pm |
15 min |
Shifting back the power source of DECORP
San Jacinto Substation from NGCP Balingueo Substation to NGCP
San Manuel Substation due to NGCP's Annual Preventive Maintenance of 100MVA
Power Transformer at San Manuel Substation |
January 23, 2021 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Leet (Leet West) |
|
Primary line revamp |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Portion of Ambalangan Dalin |
|
Primary line extension |
January 21, 2021 |
Thu |
8:30 am – 1:30 pm |
5 hr |
Dagupan City: |
Portion of Bonuan Binloc (Palmas Verdes Subdivision) |
|
Primary line extension |
January 16, 2021 |
Sat |
4:00 am – 5:00 am |
1 hr |
Dagupan City: |
Caranglaan, Bacayao Norte, Mayombo, portion of Pantal (Sitio Guilbang), De Venecia
Highway Extension, Bonuan Gueset, Bonuan Binloc, and Bonuan Boquig |
|
Primary line revamp |
7:00 am – 8:00 am |
1 hr |
4:00 am – 8:00 am |
4 hr |
Dagupan City:  |
Portion of M.H. Del Pilar Street and portion of Arellano Street |
|
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Ambalangan Dalin |
|
Primary line extension |
January 15, 2021 |
Fri |
3:00 am – 4:00 am |
1 hr |
Dagupan City: |
Caranglaan, Bacayao Norte, Mayombo, portion of Pantal (Sitio Guilbang), De Venecia
Highway Extension, Bonuan Gueset, Bonuan Binloc, and Bonuan Boquig |
|
Primary line revamp |
6:00 am – 7:00 am |
1 hr |
3:00 am – 7:00 am |
4 hr |
Dagupan City:  |
Portion of M.H. Del Pilar Street and portion of Arellano Street |
|
January 9, 2021 |
Sat |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Ambalangan Dalin |
|
Primary line extension |
6:00 am – 11:00 am |
5 hr |
Manaoag: |
Portion of Caloocan (Camp Tito Abat Gate 2) |
|
Primary line revamp |
January 8, 2021 |
Fri |
9:00 am – 5:00 pm |
8 hr |
San Jacinto: |
Portion of Sta. Cruz and portion of Bolo |
|
Primary line extension |
December 12, 2020 |
Sat |
8:30 am – 4:30 pm |
8 hr |
San Fabian: |
Portion of Colisao and portion of
Ambalangan Dalin |
|
Primary line extension |
December 9, 2020 |
Wed |
5:00 am – 5:45 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon), Brgy. II
(Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig,
Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of
Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro
Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St.,
Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., portion of Perez Blvd., and De
Venecia Highway Extension |
|
Shifting back the power source of DECORP Dagupan
Substation from NGCP Balingueo Substation to NGCP Labrador
Substation due to NGCP's Annual Preventive Maintenance of
100MVA Power Transformer at Labrador Substation |
December 8, 2020 |
Tue |
5:00 am – 5:45 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon), Brgy. II
(Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig,
Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of
Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro
Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St.,
Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., portion of Perez Blvd., and De
Venecia Highway Extension |
|
Shifting the power source of DECORP Dagupan
Substation from NGCP Labrador Substation to NGCP Balingueo
Substation due to NGCP's Annual Preventive Maintenance of
100MVA Power Transformer at Labrador Substation |
December 5, 2020 |
Thu |
5:00 am – 9:00 am |
4 hr |
Calasiao: |
Buenlag, Songkoy and Macabito |
|
Primary line revamp |
November 26, 2020 |
Thu |
8:30 am – 4:30 pm |
8 hr |
Manaoag: |
Portion of Calaocan (Camp Tito Abat) |
|
Primary line extension |
November 20, 2020 |
Fri |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion of Bolo (Sitio Molo and Sitio Bakiruan) |
|
Primary line extension |
November 18, 2020 |
Wed |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Portion Bolo (Sitio Bolo) |
|
Primary line extension |
November 5, 2020 |
Thu |
9:00 am – 4:00 pm |
7 hr |
San Jacinto: |
Sta. Cruz and Bolo |
|
Primary line extension |
October 26, 2020 |
Mon |
9:00 am – 12:00 nn |
3 hr |
|
Primary line revamp |
October 23, 2020 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Nalsian (Nalsian Bacayao) |
|
Primary line revamp |
October 21, 2020 |
Wed |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Lipit-Tomeeng, Inmalog Sur, Inmalog Norte, portion of Bigbiga,
and portion of Ambalngan Dalin. |
|
Primary line extension |
12:00 nn – 4:00 pm |
4 hr |
San Fabian: |
Portion of Inmalog Sur and Inmalog Norte |
|
October 16, 2020 |
Fri |
7:00 am – 12:00 nn |
5 hr |
Manaoag: |
Portion of Calaocan, Sapang, Lipit Sur, and Lipit Norte |
|
Primary line revamp |
October 15, 2020 |
Thu |
8:00 am – 4:00 pm |
8 hr |
San Fabian: |
Portion of Lipit-Tomeeng, Inmalog Sur, Inmalog Norte, portion of Bigbiga,
and portion of Ambalangan Dalin |
|
Primary line extension |
October 10, 2020 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Calasiao: |
Portion of Doyong and Nagsaing |
|
Primary line revamp |
October 9, 2020 |
Fri |
7:00 am – 7:15 am |
15 min |
Calasiao:  |
Portion of San Miguel, Poblacion West,
Nalsian, portion of San Vicente, and Banaoang |
|
Primary line revamp |
7:00 am – 12:00 nn |
5 hr |
Calasiao: |
Portion of San Vicente, Dinalaoan,
Lumbang, and Ambuetel |
|
11:45 am – 12:00 nn |
15 min |
Calasiao: |
Portion of San Miguel, Poblacion West,
Nalsian, portion of San Vicente, and Banaoang |
|
October 8, 2020 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Bacayao Norte |
|
Primary line revamp |
October 7, 2020 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara: |
Portion of Maningding |
|
Primary line revamp |
October 3, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Poblacion West (Del Carmen Subdivision) |
|
Primary line revamp |
October 2, 2020 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Binloc (Sitio America) |
|
Primary line revamp |
September 26, 2020 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Sta. Barbara: |
Portion of Maningding, portion of
Ventenilla, Primicias, Nilombot, Banzal, Erfe, Banaoang,
Matic-Matic, Butao, Tebag, Leet, Minien West, and Minien
East |
|
Primary line revamp |
September 24, 2020 |
Thu |
7:00 am – 7:15 am |
15 min |
Dagupan City: |
Portion of Arellano St., portion of Pantal
(Pantal-Guibang), portion of De Venecia Highway Extension,
Bonuan Gueset, Bonuan Boquig, and Bonuan Binloc |
|
Primary line extension |
7:00 pm – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Caranglaan (Sanggunian Village) |
|
Primary line revamp |
September 17, 2020 |
Thu |
7:00 am – 7:15 am |
15 min |
Dagupan City: |
Portion of Arellano St., Bonuan Gueset, Bonuan Boquig, and Bonuan Binloc |
|
Primary line extension |
4:00 pm – 4:15 pm |
15 min |
September 9, 2020 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara:  |
Portion of Ventinilla and portion of Poblacion |
|
Primary line revamp |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Bolo and Sta. Cruz |
|
Primary line extension |
12:00 nn – 5:00 pm |
5 hr |
San Jacinto: |
Portion of Bolo and Sta. Cruz |
|
September 8, 2020 |
Tue |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Labney |
|
Primary line revamp |
September 4, 2020 |
Fri |
9:00 am – 5:00 pm |
8 hr |
San Jacinto: |
Portion of Bolo |
|
Primary line extension |
August 29, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Aramal, Binday, Colisao, Ambalangan Dalin, and Palapad |
|
Upgrading of insulation |
August 28, 2020 |
Fri |
9:00 am – 9:15 am |
15 min |
|
NGCP to implement disconnect switch
opening/closing in Mangaldan for the installation of surge
arrester at CENPELCO Guilig substation |
3:45 pm – 4:00 pm |
15 min |
9:00 am – 12:00 nn |
3 hr |
Manaoag:  |
Portion of Lipit (Lipit-Pugaro) |
|
Tree trimming |
August 26, 2020 |
Wed |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Inmalog Sur and portion of Inmalog
Norte |
|
Primary line extension |
August 19, 2020 |
Wed |
9:00 am – 11:00 am |
2 hr |
San Fabian: |
Portion of Bigbiga and portion of Inmalog
Norte |
|
Primary line revamp |
August 18, 2020 |
Tue |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Inmalog Sur and portion of
Inmalog Norte |
|
Primary line extension |
August 14, 2020 |
Fri |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Tocok |
|
Primary line revamp |
August 12, 2020 |
Wed |
8:00 am – 11:00 am |
3 hr |
San Fabian: |
Portion of Cayanga and portion of
Longos-Amangonan-Parac-Parac |
|
Primary line revamp |
August 11, 2020 |
Tue |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Sta. Cruz and Bolo |
|
Primary line extension |
12:00 pm – 5:00 pm |
5 hr |
San Jacinto: |
Portion of Bolo |
|
August 8, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Banaoang (Sitio Calit) |
|
Primary line revamp |
1:00 pm – 4:00 pm |
3 hr |
San Fabian: |
Colisao and portion of Ambalangan Dalin (Sitio Tandagan) |
|
August 7, 2020 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Ambalangan Dalin (Sitio
Bisbisocol and Sitio Mamatao) |
|
Primary line revamp |
August 6, 2020 |
Thu |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Lomboy, Salapingao, and Pugaro-Suit |
|
Primary line revamp |
August 1, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Cayanga (Cayanga old road) |
|
Primary line revamp |
July 31, 2020 |
Fri |
1:00 pm – 3:00 pm |
2 hr |
San Fabian: |
Portion of Longos-Amangonan-Parac-Parac
(Sitio Parac-Parac) |
|
Primary line revamp |
July 29, 2020 |
Wed |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of Sto. Tomas (Sitio Macayug and
Sitio Baybay) |
|
Primary line revamp |
July 24, 2020 |
Fri |
5:45 am – 6:00 am |
15 min |
San Fabian:  |
All areas |
|
NGCP scheduled interruption due to
replacement of broken insulators |
6:00 am – 7:00 am |
1 hr |
|
7:00 am – 7:15 am |
15 min |
Dagupan City: |
Portion of Bonuan Gueset, portion of
Bonuan Boquig, and Bonuan Binloc |
|
July 24, 2020 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (Maligaya street) |
|
Primary line revamp |
8:30 am – 4:30 pm |
8 hr |
Dagupan City: |
Portion of Lucao (Sitio Lucao-Cabaruan) |
|
July 22, 2020 |
Wed |
9:00 am – 11:00 am |
2 hr |
Sta. Barbara: |
Portion of Nilombot (Sitio Malcan) |
|
Primary line revamp |
July 21, 2020 |
Tue |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Bonuan Boquig (Ayusip road) |
|
Primary line revamp |
9:00 am – 11:00 am |
2 hr |
Sta. Barbara: |
Portion of Payas (Sitio Payas III) |
|
July 18, 2020 |
Sat |
8:00 am – 8:15 am |
15 min |
Dagupan City: |
Portion of Bonuan Binloc (Palmas Verdes
Subdivision to Boundary Arch of Dagupan - San Fabian) |
|
Primary line extension |
July 17, 2020 |
Fri |
1:00 pm – 3:00 pm |
2 hr |
Dagupan City: |
Portion of Bonuan Binloc (Palmas Verdes
Subdivision) |
|
Primary line revamp |
July 16, 2020 |
Thu |
6:00 am – 9:00 am |
3 hr |
San Fabian: |
Longos Proper and portion of Longos
Amangonan-Parac-Parac |
|
Primary line revamp |
July 15, 2020 |
Wed |
6:00 am – 3:00 pm |
9 hr |
Dagupan City: |
Portion of Bonuan Binloc (from Palmas
Verdes Subdivision to boundary Arch of Dagupan - San
Fabian) |
|
Primary line extension |
2:45 pm – 3:00 pm |
15 min |
Dagupan City: |
Portion of Bonuan Gueset, portion of
Bonuan Boquig, and Bonuan Binloc (from Barangay Boundary Arch
to Boundary Arch of Dagupan - San Fabian) |
|
July 14, 2020 |
Tue |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (Bonuan Blue
Beach Subdivision) |
|
Primary line revamp |
July 11, 2020 |
Sat |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Portion of Bonuan Boquig, and Portion of
Bonuan Binloc (from Mount Zion to Boundary Arch of Dagupan -
San Fabian) |
|
Primary line extension |
2:45 pm – 3:00 pm |
15 min |
6:00 am – 3:00 pm |
9 hr |
Dagupan City:  |
Portion of Bonuan Gueset and Portion of Bonuan Boquig (from Barangay Boundary
Arch to Mount Zion) |
|
July 11, 2020 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Manaoag: |
Portion of Babasit (Babasit-Pugaro and Babasit-San Juan) |
|
Primary line revamp |
July 8, 2020 |
Wed |
6:00 am – 9:00 am |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset and Bonuan Binloc
( from Barangay Boundary Arch to Mount Zion and Leisure Coast
to Boundary Arch of Dagupan - San Fabian) |
|
Primary line extension |
2:45 pm – 3:00 pm |
15 min |
6:00 am – 3:00 pm |
9 hr |
Dagupan City: |
Portion of Bonuan Binloc ( from Mount Zion
to Palmas Verdes Subdivision) |
|
July 4, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Manaoag: |
Poblacion (Castro Street) |
|
Primary line revamp |
June 27, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Gueguesangen |
|
Relocation of primary poles affected by road and drainage construction
by DPWH |
June 24, 2020 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset (Sitio Calamiong) |
|
Primary line revamp |
June 19, 2020 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Inmalog Sur and portion of Ambalangan Dalin ( Sitio Bisbisocol
and Sitio Mamatao) |
|
Primary line revamp |
June 12, 2020 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Mac Arthur Highway, San Miguel (BIR Regional Office
and Petron Gas Station) |
|
Primary line revamp |
June 11, 2020 |
Thu |
8:30 am – 12:00 nn |
3.5 hr |
Manaoag: |
Portion of Baritao (Sitio Sagur) |
|
Upgrading of insulation |
9:00 am – 11:00 nn |
2 hr |
San Fabian: |
Portion of Inmalog Sur |
|
Primary line revamp |
June 9, 2020 |
Tue |
5:30 am – 5:45 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon), Brgy. II
(Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig,
Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of
Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro
Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St.,
Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., portion of Perez Blvd., and De
Venecia Highway Extension |
|
Shifting the power source of DECORP
Dagupan Substation from NGCP Labrador Substation to NGCP
Balingueo Substation due to NGCP's correction of critical
hotspot at Labrador Substation |
9:00 am – 9:15 am |
15 min |
Shifting back the power source of DECORP
Dagupan Substation from NGCP Balingueo Substation to NGCP
Labrador Substation due to NGCP's correction of critical
hotspot at Labrador Substation |
June 6, 2020 |
Sat |
8:00 am – 8:10 am |
10 min |
Calasiao: |
Mac Arthur Highway, Jones St., Bonifacio
St., portion of San Miguel, portion of Nalsian, portion of
Poblacion West, Dinalaoan, Lumbang and Ambuetel |
|
Primary line revamp |
11:50 am – 12:00 nn |
10 min |
8:00 am – 12:00 nn |
4 hr |
Calasiao:  |
Portion of San Vicente and Banaoang |
|
June 4, 2020 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Bolo and Sta. Cruz |
|
Primary line revamp |
9:00 am – 12:00 nn |
3 hr |
San Fabian: |
Portion of Alacan |
|
May 30, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Gabon (Tamayo Road) |
|
Primary line revamp |
May 29, 2020 |
Fri |
9:00 am – 11:30 am |
2.5 hr |
Sta. Barbara:  |
Portion of Balingueo (Bliss) |
|
Primary line revamp |
May 28, 2020 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Songkoy (Mendoza Road) |
|
Tree trimming |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Poblacion East (Pandayan) |
|
Primary line revamp |
May 22, 2020 |
Fri |
6:00 am – 6:30 am |
30 min |
San Jacinto: |
Casibong, Imelda, Guibel, Magsaysay,
Macayug, Bagong Pag-Asa, San Roque, San Vicente, Santa Maria
and Santo Tomas |
Manaoag: |
Baguinay, Baritao, Cabanbanan, Inamotan,
Lelemaan, Licsi, Matulong, Mermer, Nalsian, Oraan East, Oraan
West, Pantal, Parian, San Ramon, Santa Ines, and Tebuel |
|
To facilitate replacement of disconnect
switch ( critical hotspot ) and temporary relocation of 69KV
line due to erection of steel poles and stringing of new tie
lines - NGCP San Manuel
To replace 3 units of 69 KV lightning
arresters at DECORP San Jacinto Substation |
10:00 am – 10:30 am |
30 min |
10:00 am – 10:10 am |
10 min |
Dagupan City: |
Portion of Bonuan Gueset and Bonuan Binloc |
|
6:00 am – 10:30 am |
4.5 hr |
San Jacinto: |
Awal, Bolo, Portion of Capaoay, Labney,
Lobong, Portion of Guillermo, San Jose, San Juan, and
Sta. Cruz |
Manaoag: |
Babasit, Bisal, Bucao, Calaocan, Lipit
Norte, Lipit Sur, Pao, Poblacion, Pugaro and Sapang |
|
5:30 pm – 6:00 pm |
30 min |
|
April 16, 2020 |
Thu |
9:00 am – 10:00 am |
1 hr |
Dagupan City:  |
Portion of Pugaro Suit (Sitio Pugaro and Sitio Buer) |
|
Primary line reconfiguration |
March 20, 2020 |
Fri |
6:00 am – 7:00 am |
1 hr |
|
Emergency corrective works inside NGCP
San Manuel Substation
|
March 13, 2020 |
Fri |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Carael, Calmay, Lomboy, Salapingao, Pugaro
Suit, and portion of De Venecia Highway Extension |
|
Primary line revamp and upgrading of insulation |
9:45 am – 10:00 am |
15 min |
6:00 am – 10:00 am |
4 hr |
Dagupan City:  |
Portion of Lucao (from Pan De Manila
Bakeshop to Nel Ars Subdivision), portion of De Venecia
Highway, and portion of Tapuac (from La Marea Academy to
corner Tapuac - De Venecia Highway) |
|
March 12, 2020 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Calasiao:  |
Portion of Poblacion East (Pandayan) |
|
Primary line extension |
March 5, 2020 |
Thu |
9:00 am – 4:00 pm |
7 hr |
|
Primary line extension |
February 27, 2020 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Manaoag:  |
San Ramon and Mermer |
|
Primary line extension |
February 26, 2020 |
Wed |
6:30 am – 6:45 am |
15 min |
Dagupan City: |
Caranglaan - Tebeng Road, Tebeng, Mangin,
Tambac, Bolosan, Salisay, Mamalingling, A.B. Fernandez East,
Caranglaan, Bacayao Norte, Mayombo, M.H. Del Pilar St.,
Arellano St., Bacayao Sur, Lasip Grande, Pogo Grande, portion
of Pogo Chico, portion of De Venecia Highway, Lasip Chico,
Malued, portion of Lucao, Perez Market Site, portion of Perez
Boulevard, Rizal St., Extension, Villaflor Hospital, City
Mall, BHF Mall, R1MC Hospital, and NEPO Mall |
San Carlos: |
Cruz and Bolingit |
|
Shifting the power source of DECORP Calasiao
Substation from NGCP Balingueo Substation to NGCP Labrador
Substation due to line preventive maintenance of Balingueo -
Calasiao 69 kv line |
7:45 am – 8:00 am |
15 min |
Normalization the power source of DECORP
Calasiao Substation to NGCP Balingueo Substation |
6:30 am – 8:30 am |
2 hr |
Sta. Barbara: |
Cablong and Patayak |
|
Request interruption of CENPELCO for erection
of their 69 kv poles |
6:30 am – 3:30 pm |
9 hr |
|
February 22, 2020 |
Sat |
7:00 am – 8:00 am |
1 hr |
Dagupan City:  |
Portion of Poblacion Oeste and Tapuac |
|
Primary line revamp |
7:00 am – 3:00 pm |
7 hr |
Dagupan City: |
Lateral Road in between WH Auto Supply and
DCNHS in Tapuac |
|
February 21, 2020 |
Fri |
7:00 am – 11:00 am |
4 hr |
San Carlos City:  |
Cruz and Bolingit |
|
Primary line revamp due to DPWH
Malabago Bridge widening project |
10:45 am – 11:00 am |
15 min |
Calasiao: |
Nagsaing, Malabago, and Longos |
|
February 19, 2020 |
Wed |
5:45 am – 6:00 am |
15 min |
Dagupan City: |
Caranglaan - Tebeng Road, Tebeng, Mangin,
Tamabac, Bolosan, Salisay, Mamalingling, A.B. Fernandez East,
Caranglaan, Bacayao Norte, Mayombo, M.H. Pilar St., Portion of
Arellano, Bacayao Sur, Lasip Grande, Pogo Grande, Portion of
Pogo Chico, Portion of De Venecia Highway, Lasip Chico,
Malued, Portion of Lucao, Perez Market site, Portion of Perez
Blvd., Rizal St. Extension, Villaflor Hospital, City Hall, BHF
Mall, R1MC Hospital, and NEPO Mall |
San Carlos City: |
All areas |
|
Shifting the power source of DECORP
Calasiao Substation from NGCP Labrador Substation to NGCP
Balingueo Substation due to NGCP's Annual Preventive
Maintenance of 100 MVA Power Transformer at Balingueo
Substation |
5:45 pm – 6:00 pm |
15 min |
Shifting the power source of DECORP
Calasiao Substation from NGCP Balingueo Substation to NGCP
Labrador Substation due to NGCP's Annual Preventive
Maintenance of 100 MVA Power Transformer at Balingueo
Substation |
February 15, 2020 |
Sat |
8:00 am – 3:00 pm |
7 hr |
San Fabian:  |
Portion of Bolaoen and Gomot |
|
Primary line revamp |
February 14, 2020 |
Fri |
8:00 am – 12:00 nn |
4 hr |
San Fabian:  |
Portion of Lipit Tomeeng and portion of
Inmalong Sur |
|
Primary line revamp |
January 30, 2020 |
Thu |
8:00 am – 12:00 nn |
4 hr |
San Jacinto:  |
Portion of Lobong, Labney, Sta. Cruz, and Bolo |
|
Primary line revamp |
January 25, 2020 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Calasiao: |
Portion of San Miguel (PNR site and portion of Sitio
Parongking), Talibaew, and Mancup |
|
Primary line revamp |
January 18, 2020 |
Sat |
8:30 am – 12:00 nn |
3.5 hr |
Sta. Barbara: |
Patayak and Cablong |
|
Primary line revamp |
January 16, 2020 |
Thu |
9:00 am – 3:00 pm |
6 hr |
San Fabian: |
Portion of Alacan |
|
Primary line extension |
January 15, 2020 |
Wed |
6:00 am – 6:30 am |
0.5 hr |
|
Annual preventive maintenance of 100MVA Power Transformer -
NGCP San Manuel Substation |
4:30 pm – 5:00 pm |
0.5 hr |
January 11, 2020 |
Sat |
8:30 am – 11:30 am |
3 hr |
|
Primary line revamp |
January 10, 2020 |
Fri |
9:00 am – 11:00 am |
2 hr |
Dagupan City: |
Pugaro Suit |
|
Primary line revamp |
January 4, 2020 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (Sitio Calamiong) |
|
Primary line revamp |
December 21, 2019 |
Sat |
7:00 am – 12:00 nn |
5 hr |
San Fabian: |
Portion of Bigbiga |
|
Primary line revamp |
December 19, 2019 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion of Inamotan (Sitio Barrientos) |
|
Primary line extension |
December 6, 2019 |
Fri |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Bigbiga |
|
Primary line revamp |
December 2, 2019 |
Mon |
2:00 am – 6:00 am |
4 hr |
Dagupan City: |
Portion of A.B Fernandez West, Burgos St., portion of
Rivera St., portion of Galvan St., Zamora St., Jovellanos St., Gomez St., Guilig St.,
portion of Perez Blvd., and Zamora St. Extension |
|
Primary line revamp |
November 24, 2019 |
Sun |
8:00 am – 10:00 am |
2 hr |
San Fabian: |
Portion of Mabilao (Mabilao BLISS), Lipit
Tomeeng, and Inmalog Sur |
|
Primary line revamp |
November 23, 2019 |
Sat |
8:00 am – 9:00 am |
1 hr |
San Fabian: |
Binday and Colisao |
|
Primary line revamp |
November 22, 2019 |
Fri |
4:00 am – 6:00 am |
2 hr |
Dagupan City: |
Portion of A.B. Fernandez West, Burgos
St., portion of Rivera St., portion of Galvan St., Zamora St.,
Jovellanos St., Gomez St., Guilig St., portion of Perez
Boulevard, and Zamora St. Extension |
|
Primary line revamp |
November 15, 2019 |
Fri |
6:00 am – 7:00 am |
1 hr |
San Fabian:  |
All areas |
San Jacinto:  |
All areas |
|
Annual preventive maintenance of
100 MVA Power Transformer - NGCP San Manuel Substation |
6:00 am – 12:00 nn |
6 hr |
Manaoag: |
Portion of Babasit, portion of Poblacion,
Baguinay, Baritao, Cabanbanan, Inamotan, Lelemaan, Licsi,
Matulong, Mermer, Nalsian, Oraan East, Oraan West, Pantal,
Parian, San Ramon, Sta. Ines, and Tebuel |
|
12:00 nn – 6:30 pm |
6.5 hr |
San Jacinto: |
Portion of Guibel, Awai, Bolo, Capaoay, Casibong, Guibel,
Labney, Magsaysay, Lobong, Bagong Pag-Asa, San Guillermo, San Jose, and San Juan |
|
6:00 pm – 6:30 pm |
30 min |
San Fabian:  |
All areas |
San Jacinto:  |
All areas |
|
November 9, 2019 |
Sat |
8:00 am – 11:00 am |
3 hr |
Calasiao: |
Portion of Malabago (PNR site) and
portion of Doyong (Sitio Camanggaan) |
|
Primary line revamp |
October 31, 2019 |
Thu |
6:00 am – 6:15 am |
15 min |
San Fabian: |
Cabaruan, Anonang, Angio, Aramal, Binday,
Palapad, Colisao, Ambalangan Dalin, Lekep-Butao, Poblacion,
Sagud Bahley, Nibaliw East, Nibaliw Center, Nibaliw Narvarte,
and Cayanga |
|
Primary line revamp |
11:45 am – 12:00 nn |
15 min |
6:00 am – 12:00 nn |
6 hr |
San Fabian:  |
Portion of Cayanga, Longos Central, Longos Proper,
and Longos Amangonan |
|
October 26, 2019 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Calasiao: |
Portion of San Miguel (PNR Site),
Talibaew, Mancup, and portion of Buenlag |
|
Relocation of primary pole due to DPWH
Villamil bridge widening project in Brgy. Talibaew, Calasiao |
October 24, 2019 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Pogo Chico |
|
Primary line revamp |
October 23, 2019 |
Wed |
7:00 am – 11:00 am |
4 hr |
Dagupan City: |
Lomboy, Salapingao, and Pugaro Suit |
|
Primary line revamp |
October 18, 2019 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Sta. Barbara: |
Malanay, portion of Nilombot and
Gueguesangen |
|
Rerouting of primary line due to Malanay
Bridge Widening Project by the DPWH |
October 17, 2019 |
Thu |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Tapuac (Krystaville Subdivision) |
|
Primary line revamp |
10:00 am – 12:00 nn |
2 hr |
Sta. Barbara: |
Banzal, Erfe and portion of Leet |
|
Primary line extension |
October 11, 2019 |
Fri |
6:00 am – 12:00 nn |
6 hr |
|
Primary line revamp |
October 9, 2019 |
Wed |
6:30 am – 6:45 am |
15 min |
Dagupan City:  |
Brgy. I ( Torres Bugallon ), Brgy. II (
Nueva), Brgy. IV ( Zamora ), Bonuan Binloc, Bonuan Boquig,
Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of
Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro
Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St.,
Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., portion of Perez Blvd., and De
Venecia Highway Extension |
|
Shifting back the power source of DECORP
Dagupan Substation from NGCP Balingueo Substation to NGCP
Labrador Substation due to NGCP's Annual Preventive
Maintenance of 100 MVA Power Transformer at Labrador Substation |
October 8, 2019 |
Tue |
6:30 am – 6:45 am |
15 min |
Dagupan City:  |
Brgy. I ( Torres Bugallon ), Brgy. II (
Nueva), Brgy. IV ( Zamora ), Bonuan Binloc, Bonuan Boquig,
Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, portion of
Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico, Pugaro
Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St.,
Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., portion of Perez Blvd., and De
Venecia Highway Extension |
|
Shifting the power source of DECORP Dagupan
Substation from NGCP Labrador Substation to NGCP Balingueo
Substation due to NGCP's Annual Preventive Maintenance of 100
MVA Power Transformer at Labrador Substation |
October 4, 2019 |
Fri |
6:00 am – 12:00 nn |
6 hr |
Calasiao:  |
Portion of Bued, Quesban, Gabon, and
portion of San Miguel |
Sta. Barbara:  |
Portion of Alibago |
|
Primary line revamp |
September 7, 2019 |
Sat |
7:00 am – 3:00 pm |
8 hr |
San Fabian:  |
Portion of Alacan (From Brgy. Hall going
to Alacan Elem. School) |
|
Primary line revamp |
August 31, 2019 |
Sat |
7:00 am – 12:00 nn |
5 hr |
San Fabian:  |
Portion of Tocok (Alpha Ville Subdivision) |
|
Primary line revamp |
August 24, 2019 |
Sat |
7:00 am – 3:30 pm |
8.5 hr |
Sta. Barbara:  |
Portion of Ventinilla (Primicias
Road) and portion of Maningding (Callejon going to hanging bridge) |
|
Primary line revamp |
August 10, 2019 |
Sat |
6:00 am – 6:15 am |
15 min |
Sta. Barbara: |
Poblacion Norte, Poblacion Sur,
Dalongue, Maningding, Ventinilla, Primicias, Banaoang,
Nilombot, Banzal, Erfe, Leet, Maticmatic, Tebag West, Tebag
East, Botao, Minien West, and Minien East |
|
Primary line revamp |
10:45 am – 11:00 am |
15 min |
6:00 am – 11:00 am |
5 hr |
Calasiao: |
Portion of Bued, Portion of Ambonao, and Cabilocaan |
Sta. Barbara:  |
Tuliao, Portion of Alibago, Malanay, and Gueguesangen |
|
August 7, 2019 |
Wed |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon),
Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc,
Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero,
Lomboy, portion of Lucao, Pantal, Poblacion Oeste,
portion of Pogo Chico, Pugaro Suit, Salapingao,
Tapuac, A.B Fernandez Ave., Burgos St., Jovellanos
St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., portion of Perez Blvd.,
and De Venecia Highway Extension |
|
Relocation of 69 KV pole |
August 6, 2019 |
Tue |
6:00 am – 6:15 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon),
Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc,
Bonuan Boquig, Bonuan Gueset, Herrero, portion of
Lucao, Pantal, Poblacion Oeste, portion of Pogo Chico,
Tapuac, A.B Fernandez Ave., Burgos St., Jovellanos
St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., portion of Perez Blvd., and
De Venecia Highway Extension |
|
Relocation of 69 KV pole |
6:00 am – 7:00 am |
1 hr |
Dagupan City:  |
Portion of Poblacion Oeste
(Babaliwan), Calmay, Carael, Lomboy, Pugaro Suit and Salapingao |
|
10:00 am – 11:00 am |
1 hr |
August 3, 2019 |
Sat |
6:00 am – 10:00 am |
4 hr |
Manaoag:  |
Pugaro and portion of
Poblacion |
|
Primary line revamp |
8:00 am – 3:00 pm |
7 hr |
Dagupan City: |
Portion of Arellano St. (Rioferio Road) |
|
August 2, 2019 |
Fri |
8:30 am – 12:00 nn |
3.5 hr |
San Fabian:  |
Lekep Butao |
|
Relocation of primary pole |
August 1, 2019 |
Thu |
8:30 am – 11:00 am |
2.5 hr |
Calasiao:  |
Quesban and portion of Alibago |
|
Primary line revamp |
July 27, 2019 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City:  |
Portion of Arellano (Rioferio Road) |
|
Primary line revamp |
July 23, 2019 |
Tue |
7:00 am – 12:00 nn |
5 hr |
Calasiao:  |
Portion of Nalsian (Nalsian
Bacayao) |
|
Primary line revamp |
July 19, 2019 |
Fri |
7:00 am – 12:00 nn |
5 hr |
Manaoag: |
Portion of Sapang and Portion of Pugaro (Sitio Pallang and and Sitio Ordonez) |
|
Upgrading of insulation |
July 18, 2019 |
Thu |
7:00 am – 12:00 nn |
5 hr |
|
Upgrading of insulation |
July 17, 2019 |
Wed |
4:00 am – 6:00 am |
2 hr |
Dagupan City: |
Portion of AB Fernandez West, Burgos St., Portion of Rivera St., Gomez St.,
Guilig St., Callejon St., Zamora St., Zamora Extension St., Jovellanos St., Portion of Galvan St.,
and Portion of Perez Boulevard |
|
Replacement of rotten cross arm |
July 13, 2019 |
Thu |
8:00 am – 3:30 pm |
7.5 hr |
Calasiao: |
Portion of Quesban |
Sta. Barbara: |
Portion of Alibago |
|
Primary line revamp |
July 11, 2019 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Manaoag: |
Portion Babasit (Babasit Pugaro Road) |
|
Replacement of broken insulators |
July 11, 2019 |
Thu |
7:00 am – 12:00 nn |
5 hr |
San Fabian: |
Longos Amangonan, Longos Central, Including Sitio Parac Parac and Sitio Patalan |
|
Relocation of poles due to DPWH road widening project |
July 6, 2019 |
at |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Carael (Sitio Tocok and Sitio Talaib) |
|
Upgrading of insulation |
July 5, 2019 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Pantal (Sitio Guibang) |
|
Primary line revamp |
July 2, 2019 |
Tue |
6:00 am – 6:10 am |
10 min |
Dagupan City: |
Portion of Bonuan Binloc |
|
NGCP - To facilitate correction of hotspot of
Air Break Switch in Manaoag |
8:00 am – 8:10 am |
10 min |
6:00 am – 8:00 am |
2 hr |
Manaoag: |
Babasit, Bisal, Bucao, Poblacion, Pugaro,
Calaocan, Sapang, Pao, Lipit Sur, Lipit Norte, Baritao, San
Ramon, Mermer, Pantal, and Tebuel |
|
6:00 am – 10:00 am |
4 hr |
Manaoag: |
Licsi, Nalsian, Cabanbanan, Oraan west,
Oraan East, Sta. Ines, Lelemaan, Inamotan, Baguinay, Matulong,
and Parian |
|
Primary line Revamp |
June 29, 2019 |
Sat |
6:00 am – 6:10 am |
10 min |
Calasiao: |
Portion of San Miguel and portion
of Nalsian (Nalsian-Bacayao) |
Dagupan City: |
Bacayao Sur, De Venecia Highway,
Lasip Chico, Malued, Gaudencio Siapno Road, and portion
of Lucao (Lucao-Cabaruan) |
|
Primary line revamp |
11:50 am – 12:00 nn |
10 min |
6:00 am – 7:00 am |
1 hr |
Dagupan City: |
Portion of A.B. Fernandez West,
Burgos St.,portion of Zamora St., Jovellanos St.,
Rivera St. ,Gomez St., Guilig St., and portion of
Perez Boulevard |
|
11:00 am – 12:00 nn |
1 hr |
6:00 am – 12:00 nn |
6 hr |
Dagupan City: |
Lasip Grande, Pugo Chico, Pogo
Grande and Zamora St. Extension |
|
June 27, 2019 |
Thu |
8:30 am – 12:00 nn |
3.5 hr |
Calasiao: |
Portion of Buenlag (Sitio Lasip
and Sitio Walang) |
|
Primary line revamp |
June 21, 2019 |
Fri |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Bonuan Boquig |
|
Primary line revamp |
June 20, 2019 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Caranglaan (St. Michael
Subdivision) |
|
Primary line revamp |
June 18, 2019 |
Tue |
8:30 am – 4:30 pm |
8 hr |
Calasiao:  |
Portion of Quesban (Near Alibago,
Sta. Barbara boundary) |
Sta. Barbara:  |
Alibago |
|
Primary line revamp |
June 14, 2019 |
Fri |
7:00 am – 7:10 am |
10 min |
Dagupan City: |
Portion of De Venecia Highway, Portion of
De Venecia Highway Extension, Gaudencio Siapno Road, Portion
of Lucao, Lasip Chico, Portion of Tapuac, Calmay, Carael,
Lomboy, Salapingao, and Pugaro Suit |
Calasiao: |
Portion of San Miguel and Portion of
Nalsian (Nalsian-Bacayao) |
|
Primary line revamp |
11:50 am – 12:00 nn |
10 min |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Bacayao Sur, Lasip Grande, Pogo Grande, and Malued |
|
June 13, 2019 |
Thu |
9:00 am – 1:00 pm |
4 hr |
|
Primary line revamp |
June 7, 2019 |
Fri |
8:00 am – 12:00 nn |
4 hr |
|
Primary line revamp |
8:00 am – 4:00 pm |
8 hr |
Sta. Barbara: |
Portion of Alibago |
|
June 6, 2019 |
Thu |
8:30 am – 11:30 pm |
3 hr |
Calasiao:  |
Portion of Nalsian (Nalsian Bacayao) |
|
Upgrading of insulation |
June 1, 2019 |
Sat |
8:00 am – 4:00 pm |
8 hr |
San Fabian:  |
Portion of Tocok (Sitio Sapdaan,
Sitio Torres, and Sitio Cabanlig) |
|
Primary line revamp |
May 30, 2019 |
Thu |
9:00 am – 12:00 nn |
3 hr |
San Fabian:  |
Sevidal Street |
|
Replacement of rotten crossarm |
May 30, 2019 |
Thu |
6:30 am – 7:30 am |
1 hr |
Dagupan City:  |
Caranglaan - Tebeng Rd., Tebeng,
Mangin, Bolosan, Salisay, Mamalingling, Tambac, and
portion of A.B. Fernandez East. |
|
Primary line revamp |
May 25, 2019 |
Sat |
8:30 am – 12:00 nn |
3.5 hr |
Dagupan City:  |
Portion of De Venecia Highway
(Claveria Road) |
|
Primary line revamp |
May 23, 2019 |
Thu |
8:30 am – 3:30 pm |
7 hr |
San Fabian:  |
Portion of Tocok (Sitio Sapdaan,
Sitio Torres, and Sitio Cabanlig) |
|
Primary line revamp |
May 18, 2019 |
Sat |
7:00 am – 12:00 nn |
5 hr |
San Jacinto:  |
Portion of Lobong and Labney |
|
Primary line revamp |
May 17, 2019 |
Fri |
8:30 am – 11:30 am |
3 hr |
Calasiao: |
Portion of Macabito (Sitio Lasip) |
|
Primary line revamp |
9:00 am – 12:00 nn |
3 hr |
Dagupan City: |
Portion of Malued (Tamayo Road) |
|
May 4, 2019 |
Sat |
7:00 am – 7:15 am |
15 min |
Sta. Barbara: |
Payas, Carusucan, Cablong, Patayak,
Sonquil, Balingueo, and portion of Maronong (Sitio Bengal) |
|
Primary line revamp due to DPWH road
widening project |
10:45 am – 11:00 am |
15 min |
7:00 am – 11:00 nn |
4 hr |
Sta. Barbara: |
Sapang and Maronong |
|
April 17, 2019 |
Wed |
8:00 am – 12:00 nn |
4 hr |
Dagupan City:  |
Mangin |
|
Upgrading of insulation |
April 12, 2019 |
Fri |
12:00 nn – 3:00 pm |
3 hr |
San Fabian:  |
All areas |
San Jacinto:  |
All areas |
|
Possible NGCP manual load dropping due to grid
generation deficiency |
April 12, 2019 |
Fri |
6:30 am – 6:45 am |
15 min |
Dagupan City:  |
Brgy. I (Torres Bugallon), Brgy. II
(Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig,
Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of
Lucao, Pantal, Poblacion Oeste, Portion of Pogo Chico, Pugaro
Suit, Salapingao, Tapuac, A.B. Fernandez Ave., Burgos St.,
Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St.,
Fernandez St., Galvan St., Portion of Perez Blvd., and De
Venecia Highway Extension. |
|
Preventive maintenance of 69 KV line along
Labrador - Binmaley Segment |
April 11, 2019 |
Thu |
6:30 am – 6:45 am |
15 min |
Dagupan City:  |
Brgy. I (Torres Bugallon), Brgy. II (Nueva), Brgy. IV (Zamora),
Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao,
Pantal, Poblacion Oeste, Portion of Pogo Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez
Ave., Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal St., Fernandez St.,
Galvan St., Portion of Perez Blvd., and De Venecia Highway Extension. |
|
Preventive maintenance of 69 KV line along Labrador - Binmaley Segment |
April 8, 2019 |
Mon |
6:00 pm – 7:00 pm |
1 hr |
San Fabian:  |
All areas |
San Jacinto:  |
All areas |
|
NGCP Shifting back of power source of
DECORP's San Jacinto Substation from Balingueo Substation to
San Manuel Substation |
April 5, 2019 |
Fri |
7:00 am – 11:00 am |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (Bonuan
Tondaligan) |
|
Hotspot correction and upgrading
of insulation |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Bonuan Gueset
(Capt. Bartolome Ceralde St.) |
|
April 4, 2019 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Cabilocaan and portion
of Ambonao (Sitio Cruz) |
|
Primary line revamp |
1:30 pm – 3:30 pm |
2 hr |
Calasiao: |
Portion of Nalsian (Sitio Nalsian
- Bacayao) |
|
March 30, 2019 |
Sat |
6:00 am – 6:10 am |
10 min |
Calasiao: |
Portion of San Vicente, Dinalaoan,
Lumbang, Ambuetel and Nagsaing |
|
Relocation of primary poles due to DPWH
constuction of Malabago Bridge |
11:50 am – 12:00 nn |
10 min |
6:00 am – 12:00 nn |
6 hr |
Calasiao: |
Malabago, Longos, and Doyong |
San Carlos City: |
Cruz and Bolingit |
|
March 28, 2019 |
Thu |
1:00 pm – 4:00 pm |
3 hr |
Manaoag:  |
Portion of Lipit Norte (Sitio Palawan, Sitio Daya, and Sitio Malicdem) |
|
Primary line revamp |
March 28, 2019 |
Thu |
7:00 am – 12:00 nn |
5 hr |
Sta. Barbara:  |
Malanay and Gueguesangen |
|
Relocation of primary poles due to DPWH
construction of Malanay Bridge |
March 27, 2019 |
Wed |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara:  |
Portion of Tuliao (Rusela Heights
Subdivision Phase II) |
|
Primary line revamp |
March 22, 2019 |
Fri |
8:00 am – 12:00 nn |
4 hr |
Manaoag:  |
Portion of Cabanbanan (Sitio Alonzaga) |
|
Primary line revamp |
March 9, 2019 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Sta. Barbara:  |
Sonquil |
|
Primary line revamp |
March 8, 2019 |
Fri |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara:  |
Portion of Leet |
|
Primary line revamp |
March 2, 2019 |
Sat |
7:00 am – 11:00 am |
4 hr |
Dagupan City:  |
Salisay, Portion of Bolosan, Portion of Mangin |
|
Replacement of rotten primary poles |
March 2, 2019 |
Sat |
7:00 am – 12:00 nn |
5 hr |
San Fabian:  |
Lekep Butao |
|
Primary line revamp |
February 28, 2019 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Calasiao: |
Portion of Banaoang (Sitio Calit) |
|
Primary line extension |
1:00 pm – 5:00 pm |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (Sitio Calamiong) |
|
Primary line revamp |
February 23, 2019 |
Sat |
6:00 am – 12:00 nn |
6 hr |
San Fabian:  |
Palapad, Portion of Colisao and Ambalangan Dalin |
|
Primary line revamp |
February 20, 2019 |
Wed |
6:30 am – 6:45 am |
15 min |
San Carlos: |
Cruz and Bolingit |
|
NGCP Balingueo Substation Power Transformer
Maintenance |
6:00 pm – 6:15 pm |
15 min |
6:30 am – 3:00 pm |
8.5 hr |
Sta. Barbara: |
Balingueo and Portion of Maronong |
|
Primary line revamp |
2:45 pm – 3:00 pm |
15 min |
Sta. Barbara: |
Payas, Carusucan, Patayak and Cablong |
|
9:00 am – 5:00 pm |
8 hr |
Sta. Barbara: |
Tuliao - Russela Heights Subdivision Phase 2 |
|
Primary line extension |
February 16, 2019 |
Sat |
5:00 am – 5:10 am |
10 min |
Dagupan City: |
Nueva St., Portion of Fernandez St., Galvan St., Mayombo Insider, Perez Market site, Rizal St. Extension, Perez Boulevard (from Magic Technohub to Five Star bus station), and SM Center Dagupan. |
|
To give way for the construction of new health station of Brgy. Pantal. |
11:50 am – 12:00 nn |
10 min |
5:00 am – 12:00 nn |
7 hr |
Dagupan City: |
Herrero St., BDO Regional office, Assada Center, Nable St., and Pantal. |
|
February 9, 2019 |
Fri |
8:00 am – 12:00 nn |
4 hr |
|
Primary line revamp |
February 8, 2019 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Dagupan City:  |
Mangin |
|
Primary line revamp |
February 7, 2019 |
Thu |
9:00 am – 12:00 nn |
3 hr |
Sta. Barbara:  |
Carusucan |
|
Primary line extension |
January 31, 2019 |
Thu |
8:30 am – 5:00 pm |
8.5 hr |
Manaoag:  |
Portion of Cabanbanan and Oraan East |
|
Primary line conversion |
January 26, 2019 |
Sat |
5:00 am – 9:00 am |
4 hr |
Dagupan City:  |
Portion of A.B Fernandez Ave. (From Asada Building to corner Herrero St. - A.B Fernandez Ave.) |
|
Primary line extension |
January 24, 2019 |
Thu |
8:30 am – 3:30 pm |
7 hr |
San Jacinto:  |
Portion of Lobong and Labney |
|
Primary line revamp |
January 22, 2019 |
Sat |
6:00 am – 7:00 am |
1 hr |
|
NGCP shifting back of power source
of DECORP San Jacinto Substation from Balingueo Substation to
San Manuel Substation |
6:30 am – 6:45 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon),
Brgy. IV (Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan
Gueset, Calmay, Carael, Herrero, Lomboy, Portion of Lucao,
Pantal, Poblacion Oeste, Pogo Chico, Pugaro Suit, Salapingao,
Tapuac, A.B. Fernandez Ave, Burgos St., Jovellanos St., Rivera
St., Gomez St., Zamora St., Rizal St., Fernandez St., Galvan
St., Portion of Perez Blvd., and De Venecia Highway Extension. |
|
Shifting back of power source of DECORP
Dagupan Substation from Balingueo Substation to Labrador
Substation |
January 19, 2019 |
Sat |
8:00 am – 12:00 nn |
4 hr |
San Fabian:  |
Mabilao, Alacan, Tiblong and Rabon |
|
Relocation of primary poles due to DPWH construction of Alacan bridge in Alacan |
January 18, 2019 |
Fri |
9:00 am – 5:00 pm |
8 hr |
San Jacinto:  |
Portion of Labney (Sitio Inabaan) |
|
Primary line conversion |
January 17, 2019 |
Thu |
1:00 pm – 5:00 pm |
4 hr |
Dagupan City:  |
Portion of Bonuan Gueset (Maligaya St.) |
|
Primary line revamp |
January 12, 2019 |
Sat |
8:00 am – 12:00 nn |
4 hr |
San Fabian:  |
Portion of Mabilao (Dona Consuelo Perez Compound) |
|
Primary line revamp |
January 11, 2019 |
Fri |
1:30 pm – 4:30 pm |
3 hr |
Dagupan City:  |
Portion of Bonuan Gueset (Bartolome Ceralde St. going to Bangusville) |
|
Primary line revamp |
January 10, 2019 |
Thu |
8:00 am – 5:00 pm |
9 hr |
Sta. Barbara:  |
Carusucan and Portion of Payas |
|
Primary line conversion |
December 21, 2018 |
Fri |
1:00 pm – 5:00 pm |
4 hr |
Manaoag: |
Portion of Pugaro (Going to Pugaro Dupmsite) |
|
Primary line extension |
December 15, 2018 |
Sat |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Lucao (Millora St.) |
|
Primary line revamp |
December 13, 2018 |
Thu |
1:00 pm – 4:00 pm |
3 hr |
Dagupan City: |
Portion of Malued (Gaudencio
Siapno Road) |
|
Primary line extension |
December 8, 2018 |
Sat |
8:30 am – 12:00 nn |
3.5 hr |
Manaoag: |
Portion of Inamotan |
|
Primary line revamp |
November 24, 2018 |
Sat |
7:00 am – 11:00 am |
4 hr |
Dagupan City: |
Portion of Zamora St. Extension and Callejon St. |
|
Primary line revamp |
November 23, 2018 |
Fri |
8:30 am – 3:30 pm |
7 hr |
Dagupan City: |
Salapingao and Pugaro Suit |
|
Primary line revamp |
November 9, 2018 |
Fri |
8:00 am – 12:00 nn |
4 hr |
|
Primary line revamp |
1:30 pm – 4:30 pm |
3 hr |
Dagupan City:  |
Portion of Arellano St. (Trinidad Subdivision) |
|
Replacement of rotten primary pole |
November 7, 2018 |
Wed |
9:30 am ‐ 12:00 nn |
2.5 hr |
Dagupan City: |
Calmay, Lomboy, Salapingao and Pugaro Suit |
|
Replacement of rotten primary pole |
October 27, 2018 |
Sat |
7:00 am – 8:00 am |
1 hr |
Dagupan City: |
Perez Market Site and Portion of Perez Blvd. (From corner Mayombo to Galvan St.) |
|
Primary line extension |
11:00 am – 12:00 nn |
1 hr |
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Mayombo (Insider) |
|
10:50 am – 11:00 am |
10 min |
Dagupan City: |
Portion of A.B. Fernandez West, Burgos St., Portion of Rivera St., Portion of Zamora St., Jovellanos St., Gomez St., Guilig St., Zamora St., Extension, Callejon St., and Portion of Perez Blvd. (From corner Tapuac to Galvan St.) |
|
October 25, 2018 |
Thu |
8:00 am ‐ 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (San Marino Subdivision) |
|
Primary line revamp |
October 20, 2018 |
Sat |
5:30 am – 5:40 am |
10 min |
Dagupan City: |
Bacayao Sur, Lasip Grande, Pogo Grande,
A.B Fernandez Ave., Rizal St., Fernandez St., Portion of
Rivera St., Portion of Arellano St., Portion of M.H. Del Pilar
St., Portion of A.B. Fernandez East, Villaflor Hospital, City
Mall-Mayombo, Puregold-Mayombo, Region 1 Medical Center, and NEPO Mall |
|
Relocation of primary poles due to
DPWH construction of Ramos Bridge in De Venecia Highway |
5:30 am – 6:30 am |
1 hr |
Dagupan City:  |
Portion of De Venecia Highway (From corner Lasip Chico to Sphere Auto Supply), Lasip Chico, Malued and Portion of Lucao (Arco and Lucao-Cabaruan) |
|
11:00 am – 12:00 nn |
10 min |
6:20 am – 6:30 am |
10 min |
Dagupan City:  |
Carael, Calmay, Lomboy, Salapingao, Pugaro Suit, Portion of De Venecia Highway Extension, Portion of Lucao (From Pan De Manila to Nel Ars Subdivision), and Portion of Tapuac (From corner De
Venecia Highway to La Marea Academy) |
|
11:00 am – 11:10 am |
10 min |
9:30 am – 9:40 am |
10 min |
Dagupan City: |
A.B. Fernandez Ave., Rizal St., Fernandez St., Portion of Rivera St., Portion of Arellano St., Portion of M.H Del Pilar St., Portion of A.B Fernandez East, Villaflor Hospital, City Mall-Mayombo, Puregold-Mayombo, Region 1 Medical Hospital, and NEPO Mall |
|
5:30 am – 12:00 nn |
6.5 hr |
Calasiao: |
Portion of San Miguel (From Corner Quetegan Rd. to Nalsian Rd.) Portion of De Venecia Highway (From PSA to Ramos Bridge) |
Dagupan City: |
Portion of De Venecia Highway (From Ramos Bridge to corner Lasip Chico) |
|
October 13, 2018 |
Sat |
8:00 am – 12:00 nn |
4 hr |
San Fabian: |
Portion of Mabilao (Consuelo Perez Compound) |
|
Primary line revamp |
11:00 am – 3:00 pm |
4 hr |
Manaoag: |
Portion of Inamotan |
|
October 12, 2018 |
Fri |
8:30 am – 11:30 am |
3 hr |
Calasiao: |
Portion of San Miguel (Sitio Parongking) |
|
Primary line revamp |
October 6, 2018 |
Sat |
3:00 am – 3:40 am |
10 min |
Dagupan City: |
Nueva St., Portion of Fernandez
St., and Galvan St. |
|
Primary line extension |
8:20 am – 8:30 am |
10 min |
3:30 am – 5:30 am |
2 hr |
Dagupan City: |
Portion of Mayombo (Insider),
Perez Market Site, Rizal St. Extension, and Portion of Perez
Blvd. (From corner Galvan St., to M.H. Del Pilar St.) |
|
3:30 am – 8:30 am |
5 hr |
Dagupan City: |
Herrero St., Nable St., and
Portion of Pantal. |
|
October 4, 2018 |
Thu |
8:00 am ‐ 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Balingueo (BLISS) |
|
Primary line revamp |
September 29, 2018 |
Sat |
8:00 am ‐ 12:00 nn |
4 hr |
San Jacinto: |
Portion of Macayug (Sitio Boquig) |
|
Primary line revamp |
September 8, 2018 |
Sat |
6:30 am – 6:40 am |
10 min |
Calasiao: |
Portion of Nalsian (Nalsian-Bacayao) |
Dagupan City: |
Portion of De Venecia Highway, Bacayao Sur, Lasip Grande, Pogo Grande, Lasip Chico, and portion of Lucao (Lucao-Arco) |
|
Upgrading of insulation |
10:20 am – 10:30 am |
10 min |
6:30 am – 10:30 am |
4 hr |
|
September 6, 2018 |
Thu |
6:30 am – 7:00 am |
30 min |
Manaoag: |
Portion of Babasit, portion of Poblacion (Soriano St., Tiong St., Aquino St., and Castro St.), Baritao, Pantal, San Ramon, and Mermer |
|
Relocation of primary poles due to DPWH construction of Licsi bridge in Licsi, Manaoag |
10:30 am – 11:00 am |
30 min |
6:30 am – 11:00 am |
4.5 hr |
Manaoag: |
Licsi, Tebuel,Nalsian, Cabanbanan, Oraan East, Oraan West, Sta. Ines, Lelemaan, Inamotan, Baguinay, Matulong, and Parian |
|
September 1, 2018 |
Sat |
7:00 am – 7:30 am |
30 min |
Sta. Barbara: |
Sonquil, Payas, Cablong, Carusucan, Patayak, and Balingueo |
|
Primary line revamp |
10:30 am – 11:00 am |
30 min |
7:00 am – 11:00 am |
4 hr |
Sta. Barbara: |
Sapang and portion of Maronong |
|
August 30, 2018 |
Thu |
12:00 nn – 5:00 pm |
5 hr |
Dagupan City: |
Portion of Malued (Claveria-De Venecia road) |
|
Primary line revamp |
August 28, 2018 |
Tue |
10:00 am – 2:00 pm |
4 hr |
San Jacinto: |
Portion of Lobong (Sitio Mambog) |
|
August 25, 2018 |
Sat |
7:00 am – 7:10 am |
10 min |
Calasiao: |
Buenlag and Songkoy |
|
Upgrading of Insulation |
10:50 am – 11:00 am |
10 min |
7:00 am – 11:00 am |
4 hr |
|
August 18, 2018 |
Sat |
7:00 am – 8:00 am |
1 hr |
|
Upgrading of Insulation |
11:00 am – 12:00 nn |
1 hr |
7:00 am – 12:00 nn |
5 hr |
Calasiao: |
Buenlag and Songkoy |
|
August 11, 2018 |
Sat |
6:00 am – 10:00 am |
4 hr |
|
Relocation of primary poles due to DPWH widening of Villamil bridge |
9:00 pm – 10:00 am |
1 hr |
Calasiao: |
Portion of San Miguel (Parongking and PNR Site) and Mancup |
|
9:00 am – 11:00 am |
2 hr |
San Jacinto: |
Portion of Labney (Sitio Inabaan) |
|
Tree trimming |
August 10, 2018 |
Fri |
7:00 am – 7:30 am |
30 min |
|
Decommissioning and replacement of NGCP's 100MVA Power Transformer at San Manuel Substation. Shifting of power source of DECORP San Jacinto Substation and CENPELCO Mangaldan/Guilig Substation to NGCP's Balingueo Substation |
August 4, 2018 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bolosan (Bolosan
Highway) and Mamalingling |
|
Relocation of primary poles due to DPWH
widening of Paldakit Bridge in Brgy. Bolosan |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Nilombot, Banzal, Erfe,
and portion of Leet |
|
Primary line revamp |
August 2, 2018 |
Thu |
5:30 pm – 6:00 pm |
30 min |
Dagupan City: |
Brgy. I (Torres Bugallon),
Brgy. II (Nueva), Brgy. IV (Zamora), Bonuan Binloc, Bonuan
Boquig, Bonuan Gueset, Calmay, Carael, Herrero, Lomboy,
portion of Lucao, Pantal, Poblacion Oeste, portion of Pogo
Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave.,
Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St.,
Rizal St., Fernandez St., Galvan St., portion of Perez Blvd,
and De Venecia Highway Extension |
|
Emergency interruption due to damaged
conductor caused by DPWH Contractor at Ramos Bridge, De
Venecia Highway, Nalsian Calasiao |
July 24, 2018 |
Tue |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bolosan (Bolosan
Highway) and Mamalingling |
|
Relocation of primary poles due to DPWH
widening of Paldakit Bridge in Brgy. Bolosan (Supersede the
schedule interruption July 21, 2018) |
July 21, 2018 |
Sat |
6:00 am – 7:00 am |
1 hr |
Manaoag: |
Calaocan, Lipit Norte, Lipit Sur,
Pao, Poblacion, Pugaro, and Sapang |
|
Relocation of primary pole at Baloking
Bridge due to eroded soil base - Emergency Interruption |
8:00 am – 9:00 am |
1 hr |
6:50 am – 7:00 am |
10 min |
Manaoag: |
Baguinay, Baritao, Cabanbanan,
Inamotan, Lelemaan, Licsi, Matulong, Mermer, Nalsian, Oraan
East, Oraan West, Pantal, Parian, San Ramon, Sta. Ines, and Tebuel |
|
7:50 am – 8:00 am |
10 min |
6:00 am – 9:00 am |
3 hr |
Manaoag: |
Babasit, Bisal, and Bucao |
|
July 21, 2018 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bolosan (Bolosan
Highway) and Mamalingling |
|
Relocation of primary poles due to DPWH
widening of Paldakit Bridge in Brgy. Bolosan |
8:00 am – 12:00 nn |
4 hr |
Sta. Barbara: |
Portion of Nilombot, Banzal, Erfe,
and portion of Leet |
|
Primary line revamp |
July 20, 2018 |
Fri |
10:00 am – 3:00 pm |
5 hr |
Calasiao: |
Portion of Nagsaing (Sitio Pagas) |
|
Primary line revamp |
July 13, 2018 |
Fri |
6:00 am – 6:10 am |
10 min |
Calasiao: |
Bued, Quesban, and Gabon |
Sta. Barbara: |
Tuliao, Alibago, Malanay,
Gueguesangen, Dalongue, Poblacion Sur, Poblacion Norte,
portion of Maningding, Sapang, Maronong, Sonquil, Payas,
Carusucan, Cablong, Patayak, and Balingueo |
|
Primary line extension |
11:50 am – 12:00 nn |
10 min |
8:00 am – 12:00 nn |
6 hr |
Calasiao: |
Portion of San Miguel (from
Calasiao Diversion Road Junction to Parongking Bridge) and Ambonao |
|
10:00 am – 3:00 pm |
5 hr |
Manaoag: |
Portion of Babasit (Babasit-Pugaro)
|
|
Primary line revamp |
July 7, 2018 |
Sat |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (Bagong Barrio) |
|
Primary line revamp |
July 5, 2018 |
Thu |
8:00 am – 12:00 nn |
4 hr |
Calasiao: |
Portion of Bued (Rusela Heights Subdivision) |
|
Primary line extension |
June 30, 2018 |
Sat |
5:30 am – 6:00 am |
30 min |
Calasiao: |
Portion of San Miguel (Kwik N Easy
and Jollibee), portion of Nalsian (Chowking, Regency Hotel,
PSA, and De Venecia Highway), portion of San Vicente,
Dinalaoan, Ambuetel, Nagsaing, Malabago, Doyong, Buenlag,
Songkoy, and Macabito |
San Carlos City: |
Cruz and Bolingit |
|
Relocation of primary poles due to DPWH
widening of Villamil Bridge |
11:30 am – 12:00 nn |
30 min |
5:30 am – 12:00 nn |
6.5 hr |
Calasiao: |
Poblacion East, Mabini St.,
(NLPDC, Calasiao Public Market, Fiesta Shopping Center, and
Calasiao Municipal Hall), Lasip, Talibaew, and Mancup |
|
June 23, 2018 |
Sat |
7:00 am – 7:30 am |
30 min |
Dagupan City: |
Portion of De Venecia Highway
Extenstion, Portion of Arellano St., Bonuan Gueset, and
portion of Bonuan Binloc |
|
Primary line revamp |
11:30 am – 12:00 nn |
30 min |
7:00 am – 11:00 am |
4 hr |
Dagupan City: |
Portion of Bonuan Gueset (Bonuan
Blue Beach Subdivision) |
|
7:00 am – 12:00 nn |
5 hr |
Dagupan City: |
Portion of Bonuan Gueset (Paras
Road and Bonuan Tondaligan) |
|
June 16, 2018 |
Sat |
1:30 pm – 4:30 pm |
3 hr |
Calasiao: |
Portion of Lasip (Sitio Otel) |
|
Primary line extension |
June 15, 2018 |
Fri |
9:00 am – 4:30 pm |
7.5 hr |
San Fabian: |
Portion of Binday and Colisao |
|
Primary line revamp |
June 15, 2018 |
Fri |
8:00 am – 8:10 am |
10 min |
Dagupan City: |
Portion of De Venecia Highway,
Lasip Chico, Malued, and portion of Lucao (Arco) |
Calasiao: |
Portion of Mac Arthur Highway,
portion of San Miguel, portion of Poblacion West, Nalsian, San
Vicente, Banaoang, Dinalaoan, and Ambuetel |
|
Primary line extension |
9:50 am – 10:00 am |
10 min |
8:00 am – 10:00 am |
2 hr |
Dagupan City: |
Bacayao Sur, Lasip Grande, and
Pogo Grande |
|
June 14, 2018 |
Fri |
1:30 pm – 3:30 pm |
2 hr |
Manaoag: |
Portion of Calaocan, Sapang,
Pugaro, Pao, Lipit Sur, and Lipit Norte |
|
Primary line extension |
June 8, 2018 |
Fri |
9:00 am – 12:00 nn |
3 hr |
San Jacinto: |
Portion of San Jose |
|
Primary line revamp |
June 6, 2018 |
Wed |
8:00 am – 8:30 am |
30 min |
San Jacinto: |
All areas |
San Fabian: |
All areas |
|
Corrective maintenance by NGCP |
5:30 pm – 6:00 pm |
30 min |
8:00 am – 4:00 pm |
8 hr |
Manaoag: |
Portion of Cabanbanan, Lelemaan,
Inamotan, Baguinay, Matulong, Parian, and portion of Mermer |
|
Primary line revamp |
June 2, 2018 |
Sat |
9:00 am – 4:00 pm |
7 hr |
San Fabian: |
Portion of Palapad (Eggcellent
Breeding Farm) |
|
Primary line revamp |
June 1, 2018 |
Fri |
7:00 am – 12:00 nn |
5 hr |
San Jacinto: |
Portion of Lobong, Labney, Awal, and Bolo |
Dagupan City: |
Lomboy, Salapingao, and Pugaro Suit |
|
Primary line revamp |
8:00 am – 12:00 nn |
4 hr |
May 22, 2018 |
Tue |
7:00 am – 7:30 am |
30 min |
San Fabian: |
All areas |
San Jacinto: |
All areas |
|
Corrective maintenance by NGCP |
9:00 am – 9:30 am |
30 min |
May 18, 2018 |
Fri |
1:00 pm – 4:00 pm |
3 hr |
Manaoag: |
Portion of Cabanbanan (Castillo
St.) and Oraan East |
|
Primary line extension |
May 17, 2018 |
Thu |
9:00 am – 11:30 am |
2.5 hr |
Sta. Barbara: |
Portion of Minien East (Wedgewood Subdivision) |
|
Replacement of rotten crossarm |
May 12, 2018 |
Sat |
6:00 am – 7:00 am |
1 hr |
Manaoag: |
Galaban St., Aquino St., Baritao,
Pantal, Tebuel, Licsi, Nalsian, Cabanbanan, Oraan East, Oraan West,
Sta. Ines, Lelemaan, Inamotan, Baguinay, Matulong, and Parian |
|
Relocation of primary poles due to
DPWH widening of Baritao Bridge |
10:00 am – 11:00 am |
1 hr |
6:00 am – 11:00 am |
5 hr |
Manaoag: |
San Ramon and Mermer |
|
May 4, 2018 |
Fri |
1:30 pm – 4:30 pm |
3 hr |
Dagupan City: |
Portion of Malued (fisheries) |
|
Primary line extension |
April 21, 2018 |
Sat |
6:00 am – 6:10 am |
10 min |
San Fabian: |
Anonang, portion of Angio, Aramal, Binday,
Palapad, Colisao, portion of Ambalangan-Dalin, Erfe St., Alvear St.,
Rizal St., portion of Tempra-Guilig, Lekep-Butao, and Sevidal St. |
|
Rerouting of lines due to DPWH bridge
widening project at Cayanga, San Fabian |
7:50 am – 8:00 am |
10 min |
6:00 am – 8:00 am |
2 hr |
San Fabian: |
Real Highway, Caballero St., Cayanga,
Sagud-Bahley, Nibaliw East, Nibaliw Vidal, Nibaliw Narvarte, Nibaliw Magliba,
and Nibaliw Central |
|
6:00 am – 10:30 am |
4.5 hr |
San Fabian: |
Portion of Cayanga (from Saint Blaise
School to Cayanga Bridge construction), Longos,
Longos-Amangonan-Parac-Parac, and Longos Proper |
|
April 17, 2018 |
Tue |
6:00 am – 6:30 am |
30 min |
|
NGCP San Manuel Substation power transformer
maintenance and correction of defects along San Manuel to San Jacinto
transmission line |
4:30 pm – 5:00 pm |
30 min |
April 12, 2018 |
Thu |
10:00 am – 12:00 nn |
2 hr |
San Fabian: |
Portion of Lipit-Tomeeng |
|
Primary line extension |
April 11, 2018 |
Wed |
6:30 am – 6:45 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon),
Brgy. II (Nueva), Brgy. IV (Zamora),
Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael,
Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste,
portion of Pogo Chico, Pugaro Suit, Salapingao, Tapuac,
A.B. Fernandez Ave., Burgos St., Jovellanos St., Rivera St.,
Gomez St., Zamora St., Rizal St., Fernandez St., Galvan St.,
portion of Perez Blvd., and De Venecia Highway Extension |
|
Completion of rerouting of 69 KV line – Ramos
Bridge widening at De Venecia Highway (DPWH project) |
April 7, 2018 |
Sat |
6:00 am – 11:00 am |
5 hr |
Dagupan City: |
Rizal St. Extension |
|
Primary line extension |
10:00 am – 10:10 am |
10 min |
Dagupan City: |
Mayombo-Highlander and Perez Market site |
|
10:50 am – 11:00 am |
10 min |
10:00 am – 11:00 am |
1 hr |
Dagupan City: |
Perez Blvd. (from corner Galvan St. to corner
M.H. Del Pilar St.) |
|
April 6, 2018 |
Fri |
1:00 pm – 4:00 pm |
3 hr |
Sta. Barbara: |
Portion of Patayak |
|
Primary line extension |
March 26, 2018 |
Mon |
6:00 am – 6:30 am |
30 min |
|
Shutdown request by CENPELCO to facilitate the isolation of their
Mangaldan Bari Substation for the preventive maintenance of the 5 MVA
power transformer at the said substation due to severe oil leakage |
March 24, 2018 |
Sat |
5:00 am – 7:00 am |
2 hr |
Dagupan City: |
Caranglaan, Bacayao Norte,
portion of Mayombo, portion of M.H. Del Pilar St.,
and portion of Arellano St. |
|
Primary line revamp |
10:00am – 11:00 am |
2 hr |
5:00 am – 11:00 am |
6 hr |
Dagupan City: |
Portion of MacArthur Highway
(after Megasco-Caranglaan to Carmak-Mayombo),
Pag-ibig Subdivision, Dona Margarita Subdivsion |
|
March 20, 2018 |
Tue |
8:00 am – 12:00 nn |
4 hr |
Dagupan City: |
Portion of Malued (Gaudencio Siapno
Road) |
|
Primary line revamp |
March 15, 2018 |
Thu |
6:30 am – 6:45 am |
15 min |
Dagupan City: |
Brgy. I (Torres Bugallon),
Brgy. II (Nueva), Brgy. IV
(Zamora), Bonuan Binloc, Bonuan Boquig, Bonuan Gueset, Calmay, Carael,
Herrero, Lomboy, portion of Lucao, Pantal, Poblacion Oeste, portion of
Pogo Chico, Pugaro Suit, Salapingao, Tapuac, A.B. Fernandez Ave.,
Burgos St., Jovellanos St., Rivera St., Gomez St., Zamora St., Rizal
St., Fernandez St., Galvan St., portion of Perez Blvd., and De Venecia
Highway Extension |
|
Relocation of poles – Ramos Bridge
widening at De Venecia Highway (DPWH project) |
7:00 am – 10:00 am |
3 hr |
Calasiao: |
Portion of De Venecia Highway
(from PSA to corner Lasip Chico) |
|
March 8, 2018 |
Thu |
6:00 am – 12:00 nn |
6 hr |
San Fabian: |
Portion of Mabilao, Lipit Tomeeng,
Alacan, Tiblong, and Rabon |
|
Upgrading of insulation |
March 7, 2018 |
Wed |
8:30 am – 12:00 nn |
3.5 hr |
Calasiao: |
Portion of Poblacion East (Pandayan) |
|
Primary line revamp |
March 3, 2018 |
Sat |
6:00 am – 6:10 am |
10 min |
Calasiao: |
Portion of Bued, portion of Ambonao
(Sitio Ambonao-Cruz), Cabilocaan |
Sta. Barbara: |
Tuliao, Alibago, Malanay, Gueguesangen,
Poblacion Norte,
Poblacion Sur, Dalongue, Maningding, Ventinilla, Primicias, Banaoang,
Nilombot, Banzal, Erfe, Leet, Maticmatic, Tebag West, Tebag East,
Botao, Minien West and Minien East |
|
Upgrading of insulation |
11:50 am – 12:00 nn |
10 min |
March 2, 2018 |
Fri |
7:00 am – 12:00 nn |
5 hr |
Sta. Barbara: |
Nilombot, Banzal, Erfe, and portion
of Leet |
|
Primary line revamp |